Sandoval County, New Mexico: Davis-Bacon prevailing wages

Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.

Building NM20260047 rev 1

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR$36.66$11.83$48.49
CARPENTER (FORM WORK ONLY)$29.09$16.20$45.29
CARPENTER (INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND METAL STUD INSTALLATION (EXCLUDES FORM WORK))$24.08$10.79$34.87
ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE$53.35$38.44$91.79
IRONWORKER, STRUCTURAL$28.05$18.11$46.16
PLUMBER (INCLUDES HVAC PIPE INSTALLATION)$43.07$16.60$59.67
PIPEFITTER$43.07$16.60$59.67
SPRINKLER FITTER (FIRE SPRINKLERS)$39.94$25.48$65.42
SHEET METAL WORKER (INCLUDING HVAC DUCT AND UNIT INSTALLATION)$37.50$18.51$56.01
PAINTER: SPRAY$16.51$2.14$18.65
PAINTER (BRUSH AND ROLLER)$16.60$3.88$20.48
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$27.97$5.16$33.13
LABORER: MASON TENDER - CEMENT/CONCRETE$14.72$5.61$20.33
LABORER: COMMON OR GENERAL$16.70$0.00$16.70
GLAZIER$20.15$3.48$23.63
ELECTRICIAN$25.73$5.69$31.42
CEMENT MASON/CONCRETE FINISHER$17.87$0.00$17.87

Heavy NM20260041 rev 1

ClassificationRateFringeTotal
CARPENTER (FORM WORK ONLY)$27.31$13.18$40.49
ELECTRICIAN$34.50$10.81$45.31
TRUCK DRIVER: DUMP TRUCK$14.72$0.00$14.72
LABORER: PIPELAYER$17.18$4.53$21.71
LABORER: COMMON OR GENERAL$15.05$0.35$15.40
IRONWORKER, REINFORCING$27.80$0.00$27.80
CEMENT MASON/CONCRETE FINISHER$19.48$6.94$26.42
CARPENTER, EXCLUDES FORM WORK$16.43$0.00$16.43
OPERATOR 7 classifications · $18.23 to $21.06 total
ClassificationRateFringeTotal
OPERATOR: ROLLER$18.83$0.00$18.83
OPERATOR: OILER$18.23$0.00$18.23
OPERATOR: LOADER$18.83$0.00$18.83
OPERATOR: GRADER/BLADE$19.02$0.00$19.02
OPERATOR: BULLDOZER$21.00$0.00$21.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$21.06$0.00$21.06
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$21.03$0.00$21.03

Highway NM20260033 rev 1

ClassificationRateFringeTotal
TRUCK DRIVER: WATER TRUCK$13.51$1.51$15.02
TRUCK DRIVER: DUMP TRUCK (SANDOVAL, TORRANCE, VALENCIA)$14.51$0.26$14.77
TRUCK DRIVER: DUMP TRUCK (BERNALLILO)$14.46$0.26$14.72
LABORER, COMMON OR GENERAL (SANDOVAL)$11.85$0.35$12.20
LABORER, COMMON OR GENERAL (BERNALLILO, TORRANCE, AND VALENCIA)$11.82$0.35$12.17
LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER AND CONE SETTER))$14.27$0.35$14.62
IRONWORKER, REINFORCING$22.61$6.03$28.64
ELECTRICIAN (INCLUDING TRAFFIC SIGNALIZATION & INSTALLATION)$25.91$9.45$35.36
CEMENT MASON/CONCRETE FINISHER (SANDOVAL, TORRANCE, AND VALENCIA)$15.58$0.26$15.84
CEMENT MASON/CONCRETE FINISHER (BERNALLILO)$15.35$0.26$15.61
CARPENTER, INCLUDING FORM WORK (SANDOVAL, TORRANCE, AND VALENCIA)$13.70$0.44$14.14
CARPENTER, INCLUDING FORM WORK (BERNALLLILO)$13.73$0.44$14.17
POWER EQUIPMENT OPERATOR 9 classifications · $14.99 to $30.80 total
ClassificationRateFringeTotal
POWER EQUIPMENT OPERATOR: OILER (BERNALILO, SANDOVAL, TORRANCE, & VALENCIA)$22.08$8.72$30.80
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (SANDOVAL, TORRANCE, VALENCIA)$16.59$0.26$16.85
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (BERNALLILO)$16.78$0.26$17.04
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (SANDOVAL, TORRANCE, VALENCIA)$14.91$0.26$15.17
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (BERNALLILO)$14.73$0.26$14.99
POWER EQUIPMENT OPERATOR: (TRENCHER)$15.22$0.26$15.48
POWER EQUIPMENT OPERATOR: (EXCAVATOR/TRACKHOE)$20.10$0.26$20.36
POWER EQUIPMENT OPERATOR: (BROOM SWEEPER)$16.67$1.57$18.24
POWER EQUIPMENT OPERATOR: (BACKHOE)$20.92$3.62$24.54

Residential NM20260006 rev 1

ClassificationRateFringeTotal
SHEET METAL WORKER (SETTING OF HVAC UNIT AND INSTALLATION OF DUCT WORK AND CONTROL WIRING ONLY)$10.80$0.45$11.25
ROOFER$9.87$0.00$9.87
PLUMBER$16.30$0.93$17.23
PAINTER (EXCLUDING DRYWALL FINISHING)$10.00$0.00$10.00
LABORER, UNSKILLED$8.18$0.00$8.18
CARPENTER (EXCLUDING DRYWALL HANGING)$12.00$0.00$12.00

Get an email when rates change here

One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.