Building construction wages: Colfax, New Mexico

Wage determination NM20260015 · Active · Standard · verify on SAM.gov

Colfax

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-17: 1 rate change (PAINTER: Brush and Roller, Excludes Drywall Fin… $18.25 → $24.00).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0
rev 02026-01-30original

Current rates (rev 2)

Download CSV

The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
CARPENTER (DRYWALL HANGING ONLY)$24.08$10.79$34.87
POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER)$27.70$4.65$32.35
POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION))$26.75$4.65$31.40
IRONWORKER: STRUCTURAL AND ORNAMENTAL$28.05$18.11$46.16
LABORER, MASON TENDER BRICK$23.69$7.89$31.58
PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING$24.00$7.00$31.00
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$43.07$16.60$59.67
SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY)$37.50$18.51$56.01
TRUCK DRIVER: WATER TRUCK$15.16$4.69$19.85
TRUCK DRIVER: PICKUP TRUCK$15.91$3.13$19.04
TRUCK DRIVER: DUMP TRUCK$11.00$0.00$11.00
TILE SETTER$14.30$1.02$15.32
TILE FINISHER$14.02$0.00$14.02
SPRINKLER FITTER (FIRE SPRINKLERS)$20.00$4.16$24.16
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$22.01$9.65$31.66
ROOFER$18.84$0.00$18.84
PLASTERER$17.65$5.29$22.94
PAINTER: SPRAY (EXCLUDES DRYWALL FINISHING/TAPING)$15.47$2.09$17.56
OPERATOR: LOADER (FRONT END)$19.76$4.84$24.60
OPERATOR: GRADER/BLADE$20.33$4.94$25.27
OPERATOR: FORKLIFT$20.86$4.60$25.46
OPERATOR: CRANE$24.38$4.60$28.98
OPERATOR: BACKHOE$18.79$3.47$22.26
LABORER: PIPELAYER$13.78$2.20$15.98
LABORER: MASON TENDER - CEMENT/CONCRETE$11.51$0.85$12.36
LABORER: LANDSCAPE & IRRIGATION$12.42$1.47$13.89
LABORER: COMMON OR GENERAL$12.99$3.56$16.55
LABORER: ASPHALT RAKER$10.25$0.00$10.25
IRONWORKER, REINFORCING$19.75$8.71$28.46
GLAZIER$20.15$3.63$23.78
FLOOR LAYER: CARPET$18.05$4.49$22.54
ELECTRICIAN$24.55$8.29$32.84
DRYWALL FINISHER/TAPER$18.34$4.38$22.72
CEMENT MASON/CONCRETE FINISHER$16.27$3.94$20.21
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORM WORK$19.27$4.29$23.56
CARPENTER (FORM WORK ONLY)$18.80$5.61$24.41
CARPENTER (BATT INSULATION ONLY)$26.07$5.96$32.03
BRICKLAYER$20.80$5.10$25.90
BOILERMAKER$21.77$3.98$25.75
ACOUSTICAL CEILING MECHANIC$12.00$0.00$12.00

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.