Residential construction wages: Quay + 12 more counties, New Mexico
Wage determination NM20260004 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NM20260004 on · latest revision 1 · verify at sam.gov/wage-determination/NM20260004/1
QuayUnionCibolaColfaxGuadalupeHardingMcKinleyMoraRio ArribaSan JuanSan MiguelTaosTorrance
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (SETTING OF HVAC UNIT AND DUCT WORK INSTALLATION ONLY) | $14.43 | $0.58 | $15.01 |
| ROOFER | $9.87 | $0.00 | $9.87 |
| PLUMBER (INCLUDING HVAC WORK) | $16.07 | $0.65 | $16.72 |
| PAINTER (EXCLUDING DRYWALL FINISHING) | $9.00 | $0.00 | $9.00 |
| LABORER, UNSKILLED | $8.13 | $0.00 | $8.13 |
| FLOOR LAYER: CARPET | $10.00 | $0.00 | $10.00 |
| ELECTRICIAN | $12.00 | $0.23 | $12.23 |
| DRYWALL FINISHER/TAPER | $8.00 | $0.00 | $8.00 |
| CEMENT MASON/CONCRETE FINISHER | $10.91 | $0.00 | $10.91 |
| CARPENTER (EXCLUDING INSTALLATION OF SOFT FLOORS AND BATT AND BLOWN INSULATION) | $10.85 | $0.30 | $11.15 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.