Torrance County, New Mexico: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building NM20260049 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.66 | $11.83 | $48.49 |
| CARPENTER (INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND METAL STUD INSTALLATION (EXCLUDES FORM WORK)) | $24.08 | $10.79 | $34.87 |
| ELECTRICIAN | $40.30 | $13.41 | $53.71 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $53.35 | $38.44 | $91.79 |
| IRONWORKER, STRUCTURAL | $28.05 | $18.11 | $46.16 |
| PLUMBER (INCLUDES HVAC PIPE INSTALLATION) | $43.07 | $16.60 | $59.67 |
| PIPEFITTER | $43.07 | $16.60 | $59.67 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $39.94 | $25.48 | $65.42 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT AND UNIT INSTALLATION) | $37.50 | $18.51 | $56.01 |
| PAINTER: SPRAY | $16.51 | $2.14 | $18.65 |
| PAINTER (BRUSH AND ROLLER) | $16.60 | $3.88 | $20.48 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.97 | $5.16 | $33.13 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.72 | $5.61 | $20.33 |
| LABORER: COMMON OR GENERAL | $15.99 | $4.72 | $20.71 |
| GLAZIER | $20.15 | $3.48 | $23.63 |
| CEMENT MASON/CONCRETE FINISHER | $18.40 | $7.45 | $25.85 |
| CARPENTER (FORM WORK ONLY) | $21.38 | $9.12 | $30.50 |
Heavy NM20260043 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $27.31 | $13.18 | $40.49 |
| ELECTRICIAN | $34.50 | $10.81 | $45.31 |
| TRUCK DRIVER: DUMP TRUCK | $14.72 | $0.00 | $14.72 |
| LABORER: PIPELAYER | $17.18 | $4.53 | $21.71 |
| LABORER: COMMON OR GENERAL | $14.68 | $1.58 | $16.26 |
| IRONWORKER, REINFORCING | $27.80 | $0.00 | $27.80 |
| CEMENT MASON/CONCRETE FINISHER | $19.42 | $8.43 | $27.85 |
| CARPENTER, EXCLUDES FORM WORK | $16.43 | $0.00 | $16.43 |
OPERATOR 7 classifications · $18.23 to $21.07 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: ROLLER | $18.83 | $0.00 | $18.83 |
| OPERATOR: OILER | $18.23 | $0.00 | $18.23 |
| OPERATOR: LOADER | $18.56 | $0.00 | $18.56 |
| OPERATOR: GRADER/BLADE | $19.02 | $0.00 | $19.02 |
| OPERATOR: BULLDOZER | $21.00 | $0.00 | $21.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.06 | $0.00 | $21.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.07 | $0.00 | $21.07 |
Highway NM20260033 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $13.51 | $1.51 | $15.02 |
| TRUCK DRIVER: DUMP TRUCK (SANDOVAL, TORRANCE, VALENCIA) | $14.51 | $0.26 | $14.77 |
| TRUCK DRIVER: DUMP TRUCK (BERNALLILO) | $14.46 | $0.26 | $14.72 |
| LABORER, COMMON OR GENERAL (SANDOVAL) | $11.85 | $0.35 | $12.20 |
| LABORER, COMMON OR GENERAL (BERNALLILO, TORRANCE, AND VALENCIA) | $11.82 | $0.35 | $12.17 |
| LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER AND CONE SETTER)) | $14.27 | $0.35 | $14.62 |
| IRONWORKER, REINFORCING | $22.61 | $6.03 | $28.64 |
| ELECTRICIAN (INCLUDING TRAFFIC SIGNALIZATION & INSTALLATION) | $25.91 | $9.45 | $35.36 |
| CEMENT MASON/CONCRETE FINISHER (SANDOVAL, TORRANCE, AND VALENCIA) | $15.58 | $0.26 | $15.84 |
| CEMENT MASON/CONCRETE FINISHER (BERNALLILO) | $15.35 | $0.26 | $15.61 |
| CARPENTER, INCLUDING FORM WORK (SANDOVAL, TORRANCE, AND VALENCIA) | $13.70 | $0.44 | $14.14 |
| CARPENTER, INCLUDING FORM WORK (BERNALLLILO) | $13.73 | $0.44 | $14.17 |
POWER EQUIPMENT OPERATOR 9 classifications · $14.99 to $30.80 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: OILER (BERNALILO, SANDOVAL, TORRANCE, & VALENCIA) | $22.08 | $8.72 | $30.80 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (SANDOVAL, TORRANCE, VALENCIA) | $16.59 | $0.26 | $16.85 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (BERNALLILO) | $16.78 | $0.26 | $17.04 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (SANDOVAL, TORRANCE, VALENCIA) | $14.91 | $0.26 | $15.17 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (BERNALLILO) | $14.73 | $0.26 | $14.99 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $15.22 | $0.26 | $15.48 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR/TRACKHOE) | $20.10 | $0.26 | $20.36 |
| POWER EQUIPMENT OPERATOR: (BROOM SWEEPER) | $16.67 | $1.57 | $18.24 |
| POWER EQUIPMENT OPERATOR: (BACKHOE) | $20.92 | $3.62 | $24.54 |
Residential NM20260004 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (SETTING OF HVAC UNIT AND DUCT WORK INSTALLATION ONLY) | $14.43 | $0.58 | $15.01 |
| ROOFER | $9.87 | $0.00 | $9.87 |
| PLUMBER (INCLUDING HVAC WORK) | $16.07 | $0.65 | $16.72 |
| PAINTER (EXCLUDING DRYWALL FINISHING) | $9.00 | $0.00 | $9.00 |
| LABORER, UNSKILLED | $8.13 | $0.00 | $8.13 |
| FLOOR LAYER: CARPET | $10.00 | $0.00 | $10.00 |
| ELECTRICIAN | $12.00 | $0.23 | $12.23 |
| DRYWALL FINISHER/TAPER | $8.00 | $0.00 | $8.00 |
| CEMENT MASON/CONCRETE FINISHER | $10.91 | $0.00 | $10.91 |
| CARPENTER (EXCLUDING INSTALLATION OF SOFT FLOORS AND BATT AND BLOWN INSULATION) | $10.85 | $0.30 | $11.15 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.