Building construction wages: Los Alamos, New Mexico

Wage determination NM20260022 · Active · Standard · verify on SAM.gov

Los Alamos

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 1 removed.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORMWORK)$24.08$10.79$34.87
ELECTRICIAN$46.35$13.65$60.00
POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID L27.70ADER)$27.70$4.65$32.35
POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION))$26.75$4.65$31.40
IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL$28.05$18.11$46.16
LABORER, MASON TENDER BRICK$23.69$7.89$31.58
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$43.07$16.60$59.67
SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY)$37.50$18.51$56.01
TRUCK DRIVER: WATER TRUCK$15.16$4.69$19.85
TRUCK DRIVER: PICKUP TRUCK$15.91$3.13$19.04
TRUCK DRIVER: DUMP TRUCK$11.00$0.00$11.00
TILE SETTER$14.30$1.02$15.32
TILE FINISHER$14.02$0.00$14.02
SPRINKLER FITTER (FIRE SPRINKLERS)$20.00$4.16$24.16
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$22.01$9.65$31.66
ROOFER$18.84$0.00$18.84
PLASTERER$17.65$5.29$22.94
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING$16.10$1.79$17.89
OPERATOR: LOADER (FRONT END)$19.76$4.84$24.60
OPERATOR: GRADER/BLADE$20.33$4.94$25.27
OPERATOR: FORKLIFT$20.86$4.60$25.46
OPERATOR: CRANE$24.38$4.60$28.98
OPERATOR: BACKHOE$18.79$3.47$22.26
LABORER: PIPELAYER$13.78$2.20$15.98
LABORER: MASON TENDER - CEMENT/CONCRETE$11.51$0.85$12.36
LABORER: LANDSCAPE & IRRIGATION$12.42$1.47$13.89
LABORER: COMMON OR GENERAL$12.99$3.56$16.55
LABORER: ASPHALT RAKER$10.25$0.00$10.25
GLAZIER$20.15$3.63$23.78
FLOOR LAYER: CARPET$18.05$4.49$22.54
DRYWALL FINISHER/TAPER$13.00$0.00$13.00
CEMENT MASON/CONCRETE FINISHER$16.27$3.94$20.21
CARPENTER (FORM WORK ONLY)$18.80$5.61$24.41
CARPENTER (DRYWALL HANGING ONLY)$19.13$0.00$19.13
CARPENTER (BATT INSULATION ONLY)$26.07$5.96$32.03
BRICKLAYER$20.80$5.10$25.90
BOILERMAKER$21.77$3.98$25.75
ACOUSTICAL CEILING MECHANIC$12.00$0.00$12.00

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.