Building construction wages: Los Alamos, New Mexico

Wage determination NM20260022 · Active · Standard · verify on SAM.gov

Los Alamos

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORMWORK)$24.08$10.79$34.87
ELECTRICIAN$46.35$13.65$60.00
POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID L27.70ADER)$27.70$4.65$32.35
POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION))$26.75$4.65$31.40
IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL$28.05$18.11$46.16
LABORER, MASON TENDER BRICK$23.69$7.89$31.58
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$43.07$16.60$59.67
SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY)$37.50$18.51$56.01
TRUCK DRIVER: WATER TRUCK$15.16$4.69$19.85
TRUCK DRIVER: PICKUP TRUCK$15.91$3.13$19.04
TRUCK DRIVER: DUMP TRUCK$11.00$0.00$11.00
TILE SETTER$14.30$1.02$15.32
TILE FINISHER$14.02$0.00$14.02
SPRINKLER FITTER (FIRE SPRINKLERS)$20.00$4.16$24.16
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$22.01$9.65$31.66
ROOFER$18.84$0.00$18.84
PLASTERER$17.65$5.29$22.94
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING$16.10$1.79$17.89
OPERATOR: LOADER (FRONT END)$19.76$4.84$24.60
OPERATOR: GRADER/BLADE$20.33$4.94$25.27
OPERATOR: FORKLIFT$20.86$4.60$25.46
OPERATOR: CRANE$24.38$4.60$28.98
OPERATOR: BACKHOE$18.79$3.47$22.26
LABORER: PIPELAYER$13.78$2.20$15.98
LABORER: MASON TENDER - CEMENT/CONCRETE$11.51$0.85$12.36
LABORER: LANDSCAPE & IRRIGATION$12.42$1.47$13.89
LABORER: COMMON OR GENERAL$12.99$3.56$16.55
LABORER: ASPHALT RAKER$10.25$0.00$10.25
GLAZIER$20.15$3.63$23.78
FLOOR LAYER: CARPET$18.05$4.49$22.54
DRYWALL FINISHER/TAPER$13.00$0.00$13.00
CEMENT MASON/CONCRETE FINISHER$16.27$3.94$20.21
CARPENTER (FORM WORK ONLY)$18.80$5.61$24.41
CARPENTER (DRYWALL HANGING ONLY)$19.13$0.00$19.13
CARPENTER (BATT INSULATION ONLY)$26.07$5.96$32.03
BRICKLAYER$20.80$5.10$25.90
BOILERMAKER$21.77$3.98$25.75
ACOUSTICAL CEILING MECHANIC$12.00$0.00$12.00