Building construction wages: Otero, New Mexico

Wage determination NM20260025 · Active · Standard · verify on SAM.gov

Otero

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
CARPENTER (METAL STUD INSTALLATION ONLY)$24.08$10.79$34.87
ELECTRICIAN (EXCLUDING LOW VOLTAGE WIRING FOR ALARMS)$38.00$9.82$47.82
POWER EQUIPMENT OPERATOR ((8) CRANE)$31.43$4.65$36.08
POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER)$27.70$4.65$32.35
POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION))$26.75$4.65$31.40
IRONWORKER: ORNAMENTAL$28.05$18.11$46.16
IRONWORKER, STRUCTURAL (METAL BUILDING ERECTION ONLY)$28.05$18.11$46.16
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$43.07$16.60$59.67
SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY)$37.50$18.51$56.01
TRUCK DRIVER: WATER TRUCK$16.26$4.93$21.19
TRUCK DRIVER: PICKUP TRUCK$15.91$3.13$19.04
TRUCK DRIVER: DUMP TRUCK$15.25$3.89$19.14
TILE SETTER$19.00$0.00$19.00
TILE FINISHER$14.02$0.00$14.02
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$22.01$9.65$31.66
ROOFER$13.24$0.50$13.74
PLASTERER$12.00$0.00$12.00
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING$16.10$1.79$17.89
OPERATOR: LOADER (FRONT END)$21.55$4.97$26.52
OPERATOR: GRADER/BLADE$21.40$4.95$26.35
OPERATOR: FORKLIFT$21.13$4.83$25.96
OPERATOR: BACKHOE$20.95$4.73$25.68
LABORER: PIPELAYER$13.78$2.20$15.98
LABORER: MASON TENDER - CEMENT/CONCRETE$11.51$0.85$12.36
LABORER: MASON TENDER - BRICK$13.77$4.35$18.12
LABORER: LANDSCAPE & IRRIGATION$10.60$0.24$10.84
LABORER: COMMON OR GENERAL$13.61$3.89$17.50
IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION$22.00$9.03$31.03
IRONWORKER, REINFORCING$19.75$8.45$28.20
INSULATOR - BATT$24.44$8.43$32.87
GLAZIER$20.15$3.95$24.10
FLOOR LAYER: CARPET$22.31$0.30$22.61
CEMENT MASON/CONCRETE FINISHER$17.72$5.43$23.15
ELECTRICIAN (Low Voltage Wiring for Alarms)$28.25$6.62$34.87
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION$20.86$6.25$27.11
CARPENTER (FORM WORK ONLY)$20.46$5.61$26.07
CARPENTER (DRYWALL HANGING ONLY)$21.39$2.85$24.24
CARPENTER (DRYWALL FINISHING/TAPING ONLY)$20.18$4.54$24.72
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$20.79$0.00$20.79
BRICKLAYER$20.36$5.74$26.10
BOILERMAKER$21.77$3.98$25.75