Plumber prevailing wages: New Mexico, county by county

38 current plumber rates across 38 active New Mexico wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.

County / areaClassificationRateFringeTotalDetermination
BernalilloPLUMBER$22.84$7.33$30.17NM20260001 Residential
BernalilloPLUMBER (INCLUDES HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260044 Building
CatronPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260013 Building
ChavesPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260014 Building
Chaves + 13 morePLUMBER (EXCLUDING HVAC WORK)$12.00$0.00$12.00NM20260005 Residential
Chaves, CatronPLUMBER$26.27$7.69$33.96NM20260010 Heavy
ColfaxPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260015 Building
CurryPLUMBER$26.27$7.69$33.96NM20260007 Heavy
CurryPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260016 Building
De BacaPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260017 Building
Dona AnaPLUMBER$43.07$16.60$59.67NM20260045 Building
Dona Ana, ValenciaPLUMBER$22.84$7.33$30.17NM20260003 Residential
EddyPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260018 Building
Eddy + 9 morePLUMBER$26.27$7.69$33.96NM20260012 Heavy
GrantPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260019 Building
Hidalgo, SierraPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260032 Building
LeaPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260020 Building
LincolnPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260021 Building
Los AlamosPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260022 Building
Los Alamos, Sandoval, Santa FePLUMBER$16.30$0.93$17.23NM20260006 Residential
LunaPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260023 Building
McKinleyPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260024 Building
McKinley, San JuanPLUMBER$11.07$0.00$11.07NM20260002 Residential
OteroPLUMBER$26.27$7.69$33.96NM20260008 Heavy
OteroPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260025 Building
Quay + 10 morePLUMBER$26.27$7.69$33.96NM20260011 Heavy
Quay + 12 morePLUMBER (INCLUDING HVAC WORK)$16.07$0.65$16.72NM20260004 Residential
Quay + 5 morePLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260031 Building
Rio ArribaPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260026 Building
RooseveltPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260027 Building
San JuanPLUMBER$43.07$16.60$59.67NM20260046 Building
San MiguelPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260028 Building
SandovalPLUMBER (INCLUDES HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260047 Building
Santa FePLUMBER$43.07$16.60$59.67NM20260048 Building
SocorroPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260029 Building
TaosPLUMBER$26.27$7.69$33.96NM20260009 Heavy
Torrance, ValenciaPLUMBER (INCLUDES HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260049 Building
UnionPLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67NM20260030 Building

Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All New Mexico trades.