Ironworker prevailing wages: New Jersey, county by county
152 current ironworker rates across 64 active New Jersey wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Atlantic | IRONWORKER: REINFORCING | $53.24 | $38.40 | $91.64 | NJ20260025 Building |
| Atlantic | IRONWORKER: REINFORCING | $53.24 | $38.40 | $91.64 | NJ20260046 Heavy |
| Atlantic | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 | $92.64 | NJ20260025 Building |
| Atlantic | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 | $92.64 | NJ20260046 Heavy |
| Atlantic | IRONWORKERS: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260005 Residential |
| Atlantic | IRONWORKERS: STRUCTURAL | $54.24 | $40.40 | $94.64 | NJ20260005 Residential |
| Bergen | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260006 Residential |
| Bergen | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260026 Building |
| Bergen | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260047 Heavy |
| Bergen | IRONWORKER: STRUCTURAL | $52.24 | $50.32 | $102.56 | NJ20260006 Residential |
| Bergen | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260047 Heavy |
| Bergen | IRONWORKER: STRUCTURAL, ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260026 Building |
| Burlington | IRONWORKER: REINFORCING | $53.24 | $0.40 | $53.64 | NJ20260007 Residential |
| Burlington | IRONWORKER: REINFORCING | $53.24 | $38.40 | $91.64 | NJ20260027 Building |
| Burlington | IRONWORKER: REINFORCING | $53.24 | $38.40 | $91.64 | NJ20260048 Heavy |
| Burlington | IRONWORKER: STRUCTURAL | $54.24 | $0.40 | $54.64 | NJ20260007 Residential |
| Burlington | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 | $92.64 | NJ20260027 Building |
| Burlington | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 | $92.64 | NJ20260048 Heavy |
| Burlington + 9 more | IRONWORKER | $54.24 | $40.40 | $94.64 | NJ20260001 Highway |
| Burlington + 9 more | IRONWORKERS: HIGHWAY CONSTRUCTION: (PRECAST AND STRUCTURAL) (ATLANTIC COUNTY; BURLINGTON COUNTY (SOUTH AND EAST OF A LINE STARTING FROM THE POINT ON THE ATLANTIC-BURLINGTON COUNTY LINE WHERE THE ATLANTIC-BURLINGTON COUNTY LINE CROSSES ROUTE 206; THEN, FOLLOWING A LINE NORTHEAST THROUGH WHARTON STATE PARK TO THE TOWN OF CHATSWORTH; THEN, CONTINUING ALONG THE SAME LINE, TO THE BURLINGTON-OCEAN COUNTY LINE); CAPE MAY COUNTY; CUMBERLAND COUNTY (EAST OF A LINE DRAWN FROM THE DELAWARE BAY THROUGH THE TOWN OF CEDARVILLE AND NORTH TO THE POINT WHERE THE COUNTY LINES OF ATLANTIC, CUMBERLAND AND GLOUCESTER COUNTIES MEET); OCEAN COUNTY (SOUTH THIRD OF COUNTY) | $54.24 | $40.40 | $94.64 | NJ20260001 Highway |
| Burlington + 9 more | IRONWORKERS: REINFORCING (MONMOUTH COUNTY; OCEAN COUNTY (NORTH THIRD OF COUNTY) | $49.94 | $50.32 | $100.26 | NJ20260001 Highway |
| Burlington + 9 more | IRONWORKERS: STRUCTURAL (MONMOUTH COUNTY; OCEAN COUNTY (NORTH THIRD OF COUNTY) | $52.24 | $50.32 | $102.56 | NJ20260001 Highway |
| Camden | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260008 Residential |
| Camden | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260028 Building |
| Camden | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260049 Heavy |
| Camden | IRONWORKER: REINFORCING (NORTHERN THIRD OF COUNTY) | $49.94 | $50.32 | $100.26 | NJ20260008 Residential |
| Camden | IRONWORKER: STRUCTURAL | $54.24 | $40.40 | $94.64 | NJ20260008 Residential |
| Camden | IRONWORKER: STRUCTURAL (NORTHERN THRID OF COUNTY) | $52.24 | $50.32 | $102.56 | NJ20260008 Residential |
| Camden | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $40.40 | $94.64 | NJ20260028 Building |
| Camden | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $40.40 | $94.64 | NJ20260049 Heavy |
| Cape May | IRONWORKER: REINFORCING | $53.24 | $38.40 | $91.64 | NJ20260029 Building |
| Cape May | IRONWORKER: REINFORCING | $53.24 | $38.40 | $91.64 | NJ20260050 Heavy |
| Cape May | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 | $92.64 | NJ20260029 Building |
| Cape May | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 | $92.64 | NJ20260050 Heavy |
| Cape May | IRONWORKERS: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260009 Residential |
| Cape May | IRONWORKERS: STRUCTURAL | $54.24 | $40.40 | $94.64 | NJ20260009 Residential |
| Cumberland | IRONWORKER: REINFORCING | $53.24 | $38.40 | $91.64 | NJ20260010 Residential |
| Cumberland | IRONWORKER: REINFORCING | $53.24 | $38.40 | $91.64 | NJ20260030 Building |
| Cumberland | IRONWORKER: REINFORCING | $53.24 | $38.40 | $91.64 | NJ20260051 Heavy |
| Cumberland | IRONWORKER: STRUCTURAL | $54.24 | $38.40 | $92.64 | NJ20260010 Residential |
| Cumberland | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 | $92.64 | NJ20260030 Building |
| Cumberland | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 | $92.64 | NJ20260051 Heavy |
| Essex | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260011 Residential |
| Essex | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260031 Building |
| Essex | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260052 Heavy |
| Essex | IRONWORKER: STRUCTURAL | $52.24 | $50.32 | $102.56 | NJ20260011 Residential |
| Essex | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260031 Building |
| Essex | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260052 Heavy |
| Gloucester | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260012 Residential |
| Gloucester | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260032 Building |
| Gloucester | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260053 Heavy |
| Gloucester | IRONWORKER: STRUCTURAL | $54.24 | $40.40 | $94.64 | NJ20260012 Residential |
| Gloucester | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $40.40 | $94.64 | NJ20260032 Building |
| Gloucester | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $40.40 | $94.64 | NJ20260053 Heavy |
| Hudson | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260013 Residential |
| Hudson | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260033 Building |
| Hudson | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260054 Heavy |
| Hudson | IRONWORKER: STRUCTURAL | $52.24 | $50.32 | $102.56 | NJ20260013 Residential |
| Hudson | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260033 Building |
| Hudson | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260054 Heavy |
| Hunterdon | IRONWORKER: REINFORCING (Hunterdon County (Eastern Half of County)) | $53.24 | $38.40 | $91.64 | NJ20260034 Building |
| Hunterdon | IRONWORKER: REINFORCING (HUNTERDON COUNTY (EASTERN HALF OF COUNTY)) | $53.24 | $38.40 | $91.64 | NJ20260055 Heavy |
| Hunterdon | IRONWORKER: REINFORCING (Hunterdon County (Western Half of County)) | $49.94 | $50.32 | $100.26 | NJ20260034 Building |
| Hunterdon | IRONWORKER: REINFORCING (HUNTERDON COUNTY (WESTERN HALF OF COUNTY)) | $49.94 | $50.32 | $100.26 | NJ20260055 Heavy |
| Hunterdon | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (Hunterdon County (Eastern Half of County)) | $54.24 | $38.40 | $92.64 | NJ20260034 Building |
| Hunterdon | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (HUNTERDON COUNTY (EASTERN HALF OF COUNTY)) | $54.24 | $38.40 | $92.64 | NJ20260055 Heavy |
| Hunterdon | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (Hunterdon County (Western Half of County)) | $52.24 | $50.32 | $102.56 | NJ20260034 Building |
| Hunterdon | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (HUNTERDON COUNTY (WESTERN HALF OF COUNTY)) | $52.24 | $50.32 | $102.56 | NJ20260055 Heavy |
| Hunterdon, Middlesex | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260024 Residential |
| Hunterdon, Middlesex | IRONWORKER: STRUCTURAL | $52.24 | $50.32 | $102.56 | NJ20260024 Residential |
| Mercer | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260014 Residential |
| Mercer | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260035 Building |
| Mercer | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260056 Heavy |
| Mercer | IRONWORKER: STRUCTURAL | $54.24 | $40.40 | $94.64 | NJ20260014 Residential |
| Mercer | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER | $54.24 | $40.40 | $94.64 | NJ20260035 Building |
| Mercer | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER | $54.24 | $40.40 | $94.64 | NJ20260056 Heavy |
| Middlesex | IRONWORKER: REINFORCING (MIDDLESEX COUNTY (NORTHERN HALF OF COUNTY)) | $49.94 | $50.32 | $100.26 | NJ20260057 Heavy |
| Middlesex | IRONWORKER: REINFORCING (MIDDLESEX COUNTY (SOUTHERN HALF OF COUNTY)) (HAZARDOUS WASTE REMOVAL WORK, ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL.) | $53.24 | $38.40 | $91.64 | NJ20260057 Heavy |
| Middlesex | IRONWORKER: REINFORCING (MIDDLESEX COUNTY (SOUTHERN HALF OF COUNTY)) HAZARDOUS WASTE REMOVAL WORK, ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL | $53.24 | $38.40 | $91.64 | NJ20260036 Building |
| Middlesex | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (MIDDLESEX COUNTY (NORTHERN HALF OF COUNTY)) | $52.24 | $50.32 | $102.56 | NJ20260057 Heavy |
| Middlesex | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (MIDDLESEX COUNTY (SOUTHERN HALF OF COUNTY)) (HAZARDOUS WASTE REMOVAL WORK, ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL.) | $54.24 | $38.40 | $92.64 | NJ20260057 Heavy |
| Middlesex | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (MIDDLESEX COUNTY (SOUTHERN HALF OF COUNTY)) HAZARDOUS WASTE REMOVAL WORK, ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL | $54.24 | $38.40 | $92.64 | NJ20260036 Building |
| Middlesex | IRONWORKERS: REINFORCING (MIDDLESEX COUNTY (NORTHERN HALF OF COUNTY)) | $49.94 | $50.32 | $100.26 | NJ20260036 Building |
| Middlesex | IRONWORKERS: STRUCTURAL, ORNAMENTAL, RIGGER (MIDDLESEX COUNTY (NORTHERN HALF OF COUNTY)) | $52.24 | $50.32 | $102.56 | NJ20260036 Building |
| Monmouth | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260015 Residential |
| Monmouth | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260037 Building |
| Monmouth | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260058 Heavy |
| Monmouth | IRONWORKER: STRUCTURAL | $52.24 | $50.32 | $102.56 | NJ20260015 Residential |
| Monmouth | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260037 Building |
| Monmouth | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER | $52.24 | $50.32 | $102.56 | NJ20260058 Heavy |
| Morris | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260016 Residential |
| Morris | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260038 Building |
| Morris | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260059 Heavy |
| Morris | IRONWORKER: STRUCTURAL | $52.24 | $50.32 | $102.56 | NJ20260016 Residential |
| Morris | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260038 Building |
| Morris | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260059 Heavy |
| Morris + 10 more | IRONWORKER (MIDDLESEX COUNTY (south half); SOMERSET COUNTY (south Hazardous waste removal work, on a state or federally designated hazardous waste site, where the worker is required to wear Level A, B or C personal protection: $3.00 per hour additional | $54.24 | $38.40 | $92.64 | NJ20260002 Highway |
| Morris + 10 more | IRONWORKERS (WARREN COUNTY) | $34.05 | $24.00 | $58.05 | NJ20260002 Highway |
| Morris + 10 more | IRONWORKERS: REINFORCING (BERGEN, ESSEX, HUDSON AND HUNTERDON COUNTIES; MIDDLESEX COUNTY (north half); MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (north half); SUSSEX AND UNION COUNTIES) | $49.94 | $50.32 | $100.26 | NJ20260002 Highway |
| Morris + 10 more | IRONWORKERS: STRUCTURAL (BERGEN, ESSEX, HUDSON AND HUNTERDON COUNTIES; MIDDLESEX COUNTY (north half); MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (north half); SUSSEX AND UNION COUNTIES) | $52.24 | $50.32 | $102.56 | NJ20260002 Highway |
| Ocean | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260060 Heavy |
| Ocean | IRONWORKER: REINFORCING (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | $53.24 | $38.40 | $91.64 | NJ20260039 Building |
| Ocean | IRONWORKER: REINFORCING (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | $53.24 | $38.40 | $91.64 | NJ20260060 Heavy |
| Ocean | IRONWORKER: REINFORCING (NORTHERN THIRD OF COUNTY) | $49.94 | $50.32 | $100.26 | NJ20260039 Building |
| Ocean | IRONWORKER: STRUCTURAL AND ORNAMENTAL (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | $54.24 | $38.40 | $92.64 | NJ20260039 Building |
| Ocean | IRONWORKER: STRUCTURAL AND ORNAMENTAL (NORTHERN THIRD OF COUNTY) | $52.24 | $50.32 | $102.56 | NJ20260039 Building |
| Ocean | IRONWORKER: STRUCTURAL, ORNAMENTAL AND RIGGER (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | $54.24 | $38.40 | $92.64 | NJ20260060 Heavy |
| Ocean | IRONWORKER: STRUCTURAL, ORNAMENTAL AND RIGGER (NORTHERN THIRD OF COUNTY) | $52.24 | $50.32 | $102.56 | NJ20260060 Heavy |
| Ocean | IRONWORKERS: REINFORCING (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | $53.24 | $40.40 | $93.64 | NJ20260017 Residential |
| Ocean | IRONWORKERS: REINFORCING (NORTHERN THIRD OF COUNTY) | $49.94 | $50.32 | $100.26 | NJ20260017 Residential |
| Ocean | IRONWORKERS: STRUCTURAL (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | $54.24 | $40.40 | $94.64 | NJ20260017 Residential |
| Ocean | IRONWORKERS: STRUCTURAL (NORTHERN THIRD OF COUNTY) | $52.24 | $50.32 | $102.56 | NJ20260017 Residential |
| Passaic | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260018 Residential |
| Passaic | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260040 Building |
| Passaic | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260061 Heavy |
| Passaic | IRONWORKER: STRUCTURAL | $52.24 | $50.32 | $102.56 | NJ20260018 Residential |
| Passaic | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260040 Building |
| Passaic | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260061 Heavy |
| Salem | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260019 Residential |
| Salem | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260041 Building |
| Salem | IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 | NJ20260062 Heavy |
| Salem | IRONWORKER: STRUCTURAL | $54.24 | $40.40 | $94.64 | NJ20260019 Residential |
| Salem | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $40.40 | $94.64 | NJ20260041 Building |
| Salem | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $40.40 | $94.64 | NJ20260062 Heavy |
| Somerset | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260020 Residential |
| Somerset | IRONWORKER: REINFORCING (SOMERSET COUNTY (NORTHERN HALF OF COUNTY)) | $49.94 | $50.32 | $100.26 | NJ20260042 Building |
| Somerset | IRONWORKER: REINFORCING (SOMERSET COUNTY (NORTHERN HALF OF COUNTY)) | $49.94 | $50.32 | $100.26 | NJ20260063 Heavy |
| Somerset | IRONWORKER: REINFORCING (SOMERSET COUNTY (SOUTHERN HALF OF COUNTY)) | $53.24 | $38.40 | $91.64 | NJ20260042 Building |
| Somerset | IRONWORKER: REINFORCING (SOMERSET COUNTY (SOUTHERN HALF OF COUNTY)) | $53.24 | $38.40 | $91.64 | NJ20260063 Heavy |
| Somerset | IRONWORKER: STRUCTURAL | $52.24 | $50.32 | $102.56 | NJ20260020 Residential |
| Somerset | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (SOMERSET COUNTY (NORTHERN HALF OF COUNTY)) | $52.24 | $50.32 | $102.56 | NJ20260042 Building |
| Somerset | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (SOMERSET COUNTY (NORTHERN HALF OF COUNTY)) | $52.24 | $50.32 | $102.56 | NJ20260063 Heavy |
| Somerset | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (SOMERSET COUNTY (SOUTHERN HALF OF COUNTY)) | $54.24 | $38.40 | $92.64 | NJ20260042 Building |
| Somerset | IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (SOMERSET COUNTY (SOUTHERN HALF OF COUNTY)) | $54.24 | $38.40 | $92.64 | NJ20260063 Heavy |
| Sussex | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260021 Residential |
| Sussex | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260043 Building |
| Sussex | IRONWORKER: STRUCTURAL | $52.24 | $50.32 | $102.56 | NJ20260021 Residential |
| Sussex | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260043 Building |
| Sussex | IRONWORKERS: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260064 Heavy |
| Sussex | IRONWORKERS: STRUCTURAL, ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260064 Heavy |
| Union | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260022 Residential |
| Union | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260044 Building |
| Union | IRONWORKER: STRUCTURAL | $52.24 | $50.32 | $102.56 | NJ20260022 Residential |
| Union | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260044 Building |
| Union | IRONWORKERS: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260065 Heavy |
| Union | IRONWORKERS: STRUCTURAL, ORNAMENTAL | $52.24 | $50.32 | $102.56 | NJ20260065 Heavy |
| Warren | IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | NJ20260023 Residential |
| Warren | IRONWORKER: REINFORCING | $48.44 | $49.37 | $97.81 | NJ20260045 Building |
| Warren | IRONWORKER: REINFORCING | $48.44 | $49.37 | $97.81 | NJ20260066 Heavy |
| Warren | IRONWORKER: STRUCTURAL | $52.24 | $50.32 | $102.56 | NJ20260023 Residential |
| Warren | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $50.74 | $49.37 | $100.11 | NJ20260045 Building |
| Warren | IRONWORKER: STRUCTURAL AND ORNAMENTAL | $50.74 | $49.37 | $100.11 | NJ20260066 Heavy |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All New Jersey trades.