Current rates (rev 3)
The CSV and the printed sheet are snapshots of rev 3. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON | $49.60 | $37.96 | $87.56 |
| CARPENTER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) | $57.42 | $34.17 | $91.59 |
| MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) | $58.84 | $35.06 | $93.90 |
| CARPENTER: DOCK BUILDER (CONCRETE FORM WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $0.25 PER HOUR ADDITIONAL.) WORK ON HAZARDOUS/TOXIC/CONTAMINATED WASTE REMOVAL, ON A HAZARDOUS/TOXIC/CONTAMINATED WASTE SITE, WHERE THE WORKER COMES INTO CONTACT WITH HAZARDOUS/TOXIC/CONTAMINATED WASTE MATERIAL, AND WHEN A, B OR C PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED AND USED FOR RESPIRATORY, SKIN OR EYE PROTECTION: 20% PER HOUR ADDITIONAL | $52.02 | $39.23 | $91.25 |
| CARPENTER: DOCK BUILDER (ALL OTHER WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $0.25 PER HOUR ADDITIONAL.) WORK ON HAZARDOUS/TOXIC/CONTAMINATED WASTE REMOVAL, ON A HAZARDOUS/TOXIC/CONTAMINATED WASTE SITE, WHERE THE WORKER COMES INTO CONTACT WITH HAZARDOUS/TOXIC/CONTAMINATED WASTE MATERIAL, AND WHEN A, B OR C PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED AND USED FOR RESPIRATORY, SKIN OR EYE PROTECTION: 20% PER HOUR ADDITIONAL | $52.98 | $52.44 | $105.42 |
| ELECTRICIAN (HUNTERDON COUNTY (TOWNSHIPS OF ALEXANDRIA AND BETHLEHEM; BOROUGHS OF BLOOMSBURY AND CALIFON; TOWN OF CLINTON; TOWNSHIP OF CLINTON; TOWNSHIP OF DELAWARE (WEST OF A LINE FOLLOWING COUNTY ROUTE 523 FROM THE DELAWARE RIVER NORTH TO THE RARITAN TOWNSHIP LINE); TOWNSHIP OF EAST AMWELL (EAST OF STATE HWY. 31); TOWNSHIP OF FRANKLIN; BOROUGHS OF FRENCHTOWN, GLEN GARDNER, HAMPTON AND HIGH BRIDGE; TOWNSHIPS OF HOLLAND AND KINGWOOD; BOROUGH OF LEBANON; TOWNSHIP OF LEBANON; BOROUGH OF MILFORD; TOWNSHIP OF RARITAN (EAST OF STATE HWY. 31 AND NORTH OF COUNTY ROUTE 523); TOWNSHIPS OF READINGTON, TEWKSBURY AND UNION) WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL. (WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYPERSON RATE.) | $64.53 | $42.27 | $106.80 |
| ELECTRICIAN: CABLE SPLICER (HUNTERDON COUNTY (TOWNSHIPS OF ALEXANDRIA AND BETHLEHEM; BOROUGHS OF BLOOMSBURY AND CALIFON; TOWN OF CLINTON; TOWNSHIP OF CLINTON; TOWNSHIP OF DELAWARE (WEST OF A LINE FOLLOWING COUNTY ROUTE 523 FROM THE DELAWARE RIVER NORTH TO THE RARITAN TOWNSHIP LINE); TOWNSHIP OF EAST AMWELL (EAST OF STATE HWY. 31); TOWNSHIP OF FRANKLIN; BOROUGHS OF FRENCHTOWN, GLEN GARDNER, HAMPTON AND HIGH BRIDGE; TOWNSHIPS OF HOLLAND AND KINGWOOD; BOROUGH OF LEBANON; TOWNSHIP OF LEBANON; BOROUGH OF MILFORD; TOWNSHIP OF RARITAN (EAST OF STATE HWY. 31 AND NORTH OF COUNTY ROUTE 523); TOWNSHIPS OF READINGTON, TEWKSBURY AND UNION) (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL.) WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYPERSON RATE | $71.97 | $46.42 | $118.39 |
| ELECTRICIAN (HUNTERDON COUNTY (TOWNSHIP OF DELAWARE (EAST OF A LINE FOLLOWING COUNTY ROUTE 523 FROM THE DELAWARE RIVER NORTH TO THE RARITAN TOWNSHIP LINE); TOWNSHIP OF EAST AMWELL (WEST OF STATE HWY. 31); BOROUGH OF FLEMINGTON; CITY OF LAMBERTVILLE; TOWNSHIP OF RARITAN (WEST OF STATE HWY. 31 AND SOUTH OF COUNTY ROUTE 523); BOROUGH OF STOCKTON; TOWNSHIP OF WEST AMWELL)) | $63.82 | $41.99 | $105.81 |
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $52.88 | $37.50 | $90.38 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 | $97.63 |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE) (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 |
| IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (HUNTERDON COUNTY (WESTERN HALF OF COUNTY)) | $52.24 | $50.32 | $102.56 |
| IRONWORKER: REINFORCING (HUNTERDON COUNTY (WESTERN HALF OF COUNTY)) | $49.94 | $50.32 | $100.26 |
| IRONWORKER: REINFORCING (HUNTERDON COUNTY (EASTERN HALF OF COUNTY)) | $53.24 | $38.40 | $91.64 |
| IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (HUNTERDON COUNTY (EASTERN HALF OF COUNTY)) | $54.24 | $38.40 | $92.64 |
| LABORER: MASON TENDER: CEMENT/CONCRETE | $29.35 | $23.07 | $52.42 |
| LABORER: PIPELAYER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | $51.65 | $38.53 | $90.18 |
| LABORER: COMMON OR GENERAL LABORER; LANDSCAPE LABORER, POWER TOOL OPERATOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | $50.95 | $38.53 | $89.48 |
| PAINTER: WORK ON BRIDGES (MAJOR BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION) | $58.28 | $33.85 | $92.13 |
| PAINTER: BRUSH AND ROLLER (REPAINT WORK, ON PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.) | $29.05 | $18.91 | $47.96 |
| PAINTER: BRUSH AND ROLLER (NEW CONSTRUCTION) | $40.19 | $22.72 | $62.91 |
| PLUMBER/PIPEFITTER (HUNTERDON COUNTY (SOUTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON/MERCER COUNTY LINE)) | $59.57 | $46.45 | $106.02 |
| PLUMBER/PIPEFITTER: SERVICE AND REPAIR (HUNTERDON COUNTY (SOUTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON/MERCER COUNTY LINE)) | $46.23 | $29.23 | $75.46 |
| PLUMBER (HUNTERDON COUNTY (NORTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON - MERCER COUNTY LINE)) | $62.09 | $45.05 | $107.14 |
| PIPEFITTER (HUNTERDON COUNTY (NORTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON/MERCER COUNTY LINE)) | $56.34 | $50.80 | $107.14 |
| TRUCK DRIVER: DUMP TRUCK; FLATBED TRUCK; PICK UP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL.) WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY.) VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS) | $48.63 | $42.66 | $91.29 |
| TRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.) PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY.) VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS) | $48.78 | $42.66 | $91.44 |