Heavy construction wages: Hunterdon, New Jersey
Wage determination NJ20260055 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NJ20260055 on July 24, 2026 · latest revision 2 · verify at sam.gov/wage-determination/NJ20260055/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON | $49.60 | $37.96 | $87.56 |
| REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER | $57.42 | $34.17 | $91.59 |
| DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER | $58.84 | $35.06 | $93.90 |
| CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $0.25 PER HOUR ADDITIONAL. WORK ON HAZARDOUS/TOXIC/CONTAMINATED WASTE REMOVAL, ON A HAZARDOUS/TOXIC/CONTAMINATED WASTE SITE, WHERE THE WORKER COMES INTO CONTACT WITH HAZARDOUS/TOXIC/CONTAMINATED WASTE MATERIAL, AND WHEN A, B OR C PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED AND USED FOR RESPIRATORY, SKIN OR EYE PROTECTION: 20% PER HOUR ADDITIONAL | $52.02 | $39.23 | $91.25 |
| PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $0.25 PER HOUR ADDITIONAL. WORK ON HAZARDOUS/TOXIC/CONTAMINATED WASTE REMOVAL, ON A HAZARDOUS/TOXIC/CONTAMINATED WASTE SITE, WHERE THE WORKER COMES INTO CONTACT WITH HAZARDOUS/TOXIC/CONTAMINATED WASTE MATERIAL, AND WHEN A, B OR C PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED AND USED FOR RESPIRATORY, SKIN OR EYE PROTECTION: 20% PER HOUR ADDITIONAL | $52.98 | $52.44 | $105.42 |
| ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYPERSON RATE | $64.53 | $42.27 | $106.80 |
| WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYPERSON RATE | $71.97 | $46.42 | $118.39 |
| ELECTRICIAN (HUNTERDON COUNTY (TOWNSHIP OF DELAWARE (EAST OF A LINE FOLLOWING COUNTY ROUTE 523 FROM THE DELAWARE RIVER NORTH TO THE RARITAN TOWNSHIP LINE); TOWNSHIP OF EAST AMWELL (WEST OF STATE HWY. 31); BOROUGH OF FLEMINGTON; CITY OF LAMBERTVILLE; TOWNSHIP OF RARITAN (WEST OF STATE HWY. 31 AND SOUTH OF COUNTY ROUTE 523); BOROUGH OF STOCKTON; TOWNSHIP OF WEST AMWELL)) | $63.82 | $41.99 | $105.81 |
| DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $52.88 | $37.50 | $90.38 |
| WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 |
| YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 |
| WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 | $97.63 |
| WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 |
| IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (HUNTERDON COUNTY (WESTERN HALF OF COUNTY)) | $52.24 | $50.32 | $102.56 |
| IRONWORKER: REINFORCING (HUNTERDON COUNTY (WESTERN HALF OF COUNTY)) | $49.94 | $50.32 | $100.26 |
| IRONWORKER: REINFORCING (HUNTERDON COUNTY (EASTERN HALF OF COUNTY)) | $53.24 | $38.40 | $91.64 |
| IRONWORKER: STRUCTURAL, ORNAMENTAL, RIGGER (HUNTERDON COUNTY (EASTERN HALF OF COUNTY)) | $54.24 | $38.40 | $92.64 |
| LABORER: MASON TENDER: CEMENT/CONCRETE | $29.35 | $23.07 | $52.42 |
| PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | $51.65 | $38.53 | $90.18 |
| INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | $50.95 | $38.53 | $89.48 |
| PAINTER: WORK ON BRIDGES (MAJOR BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION) | $58.28 | $33.85 | $92.13 |
| PAINTER: BRUSH AND ROLLER (REPAINT WORK, ON PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.) | $29.05 | $18.91 | $47.96 |
| PAINTER: BRUSH AND ROLLER (NEW CONSTRUCTION) | $40.19 | $22.72 | $62.91 |
| (SOUTH OF A LINE DRAWN FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON/MERCER COUNTY LINE)) | $59.57 | $46.45 | $106.02 |
| POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON/MERCER COUNTY LINE)) | $46.23 | $29.23 | $75.46 |
| FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON - MERCER COUNTY LINE)) | $62.09 | $45.05 | $107.14 |
| FROM A POINT WHERE BRIDGE ST. CROSSES THE DELAWARE RIVER, CONTINUING ALONG BRIDGE ST. THROUGH FRENCHTOWN TO RT. 513; THEN, CONTINUING ALONG RT. 513 TO RT. 12; THEN, CONTINUING ALONG RT. 12 TO RT. 31/202; THEN, CONTINUING SOUTH ON RT. 31/202 TO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, MAKING A LEFT TURN IN A NORTHEASTERLY DIRECTION ONTO RT. 514 (AMWELL RD. OR OLD YORK RD.); THEN, CONTINUING ALONG RT. 514 (AMWELL RD. OR OLD YORK RD.) TO REAVILLE AND THE INTERSECTION WITH COUNTY RD. RT. 609 (MANNER'S RD.); THEN, MAKING A RIGHT TURN ONTO COUNTY RD. RT. 609 (MANNER'S RD.); THEN, CONTINUING SOUTH ALONG COUNTY RD. RT. 609 (MANNER'S RD.) UNTIL IT REACHES COUNTY RD. RT. 602 (WERTSVILLE RD.); THEN, MAKING A RIGHT TURN ONTO RT. 602 (WERTSVILLE RD.); THEN, CONTINUING SOUTH ALONG RT. 602 (WERTSVILLE RD.) UNTIL IT REACHES RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, MAKING A LEFT TURN ONTO RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.); THEN, CONTINUING ALONG RT. 607 (RILEYVILLE RD., ALSO KNOWN AS HOPEWELL - WERTSVILLE RD.) UNTIL IT REACHES THE HUNTERDON/MERCER COUNTY LINE)) | $56.34 | $50.80 | $107.14 |
| WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS) | $48.63 | $42.66 | $91.29 |
| CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS) | $48.78 | $42.66 | $91.44 |