Residential construction wages: Morris, New Jersey

Wage determination NJ20260016 · Active · Standard · verify on SAM.gov

Morris

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 1 rate change, 2 added, 2 removed (CARPENTER (INCLUDES DRYWALL HANGING, AND FORM W… $37.19 → $37.19).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
BRICKLAYER$49.60$37.96$87.56
CEMENT MASON$49.60$37.96$87.56
CARPENTER (INCLUDES DRYWALL HANGING, AND FORM WORK)$37.19$22.78$59.97
ELECTRICIAN: APARTMENTS OVER 4 UNITES$65.43$42.86$108.29
ELECTRICIAN: SINGLE FAMILY HOMES ANDAPARTMENTS NOT TO EXCEED 4 UNITS$13.63$5.52$19.15
POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday$60.13$37.50$97.63
POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday$61.72$37.50$99.22
POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday$56.59$37.50$94.09
POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday$58.22$37.50$95.72
IRONWORKER: STRUCTURAL$52.24$50.32$102.56
IRONWORKER: REINFORCING$49.94$50.32$100.26
LABORER$21.55$5.40$26.95
PLUMBER$62.09$45.05$107.14
ROOFER (INCLUDES ALL TYPES OF ROOFS)$44.52$32.25$76.77
PAINTER: BRUSH AND ROLLER$25.20$5.99$31.19
OPERATOR: CONCRETE PUMP, TRUCK MOUNTED$13.50$2.34$15.84