Heavy construction wages: Hudson, New Jersey
Wage determination NJ20260054 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NJ20260054 on · latest revision 1 · verify at sam.gov/wage-determination/NJ20260054/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| PER HOUR ADDITIONAL | $49.60 | $37.96 | $87.56 |
| CEMENT MASON | $49.60 | $37.96 | $87.56 |
| RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER | $57.42 | $34.17 | $91.59 |
| DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER | $58.84 | $35.06 | $93.90 |
| CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $0.25 PER HOUR ADDITIONAL. WORK ON HAZARDOUS/TOXIC/CONTAMINATED WASTE REMOVAL, ON A HAZARDOUS/TOXIC/CONTAMINATED WASTE SITE, WHERE THE WORKER COMES INTO CONTACT WITH HAZARDOUS/TOXIC/CONTAMINATED WASTE MATERIAL, AND WHEN A, B OR C PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED AND USED FOR RESPIRATORY, SKIN OR EYE PROTECTION: 20% PER HOUR ADDITIONAL | $52.02 | $39.23 | $91.25 |
| PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOSOTE-IMPREGNATED PRODUCTS: $0.25 PER HOUR ADDITIONAL. WORK ON HAZARDOUS/TOXIC/CONTAMINATED WASTE REMOVAL, ON A HAZARDOUS/TOXIC/CONTAMINATED WASTE SITE, WHERE THE WORKER COMES INTO CONTACT WITH HAZARDOUS/TOXIC/CONTAMINATED WASTE MATERIAL, AND WHEN A, B OR C PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED AND USED FOR RESPIRATORY, SKIN OR EYE PROTECTION: 20% PER HOUR ADDITIONAL | $52.98 | $52.44 | $105.42 |
| VOLTS: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS, FRAMES, LADDERS AND POLES, 40 FT. OR MORE ABOVE THE GROUND OR FLOOR (DOES NOT INCLUDE WORK FROM A MANLIFT): 20% PER HOUR ADDITIONAL. WORK ON RADIO TOWERS, TRANSMISSION TOWERS AND SMOKESTACKS: 21% PER HOUR ADDITIONAL | $62.90 | $39.31 | $102.21 |
| WORK ON LINE VOLTAGE OF 440 OR 480 VOLTS: 10% PER HOUR ADDITIONAL. WORK FROM TRUSSES, SCAFFOLDS, FRAMES, LADDERS AND POLES, 40 FT. OR MORE ABOVE THE GROUND OR FLOOR (DOES NOT INCLUDE WORK FROM A MANLIFT): 20% PER HOUR ADDITIONAL. WORK ON RADIO TOWERS, TRANSMISSION TOWERS AND SMOKESTACKS: 21% PER HOUR ADDITIONAL | $73.59 | $45.99 | $119.58 |
| HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $52.88 | $37.50 | $90.38 |
| BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 |
| WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 |
| YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 | $97.63 |
| BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 |
| IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 |
| LABORER: MASON TENDER: CEMENT/CONCRETE | $29.35 | $23.07 | $52.42 |
| PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS THREE DAYS FOR THE SAME EMPLOYER WITHIN A PERIOD OF TEN WORKING DAYS CONSISTING OF FIVE WORKING DAYS BEFORE AND FIVE WORKING DAYS AFTER THE DAY UPON WHICH THE HOLIDAY FALLS OR IS OBSERVED | $50.95 | $38.53 | $89.48 |
| PAINTER: WORK ON BRIDGES (MAJOR BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION) | $58.28 | $33.85 | $92.13 |
| PAINTER: BRUSH AND ROLLER (REPAINT WORK, ON PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.) | $29.05 | $18.91 | $47.96 |
| PAINTER: BRUSH AND ROLLER (NEW CONSTRUCTION) | $40.19 | $22.72 | $62.91 |
| LABORER: PIPELAYER | $24.05 | $13.67 | $37.72 |
| LABORER: COMMON OR GENERAL | $28.82 | $8.46 | $37.28 |
| HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS BEEN ASSIGNED TO WORK, OR, "SHAPES", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $47.51 | $44.02 | $91.53 |
| DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS BEEN ASSIGNED TO WORK, OR, "SHAPES", ONE DAY OF THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $47.36 | $44.02 | $91.38 |