Residential construction wages: Ocean, New Jersey
Wage determination NJ20260017 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NJ20260017 on · latest revision 1 · verify at sam.gov/wage-determination/NJ20260017/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $49.60 | $37.96 | $87.56 |
| CARPENTER (INCLUDES DRYWALL HANGING, AND FORM WORK) | $37.19 | $22.18 | $59.37 |
| ELECTRICIAN | $57.70 | $45.92 | $103.62 |
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $60.13 | $37.50 | $97.63 |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $61.72 | $37.50 | $99.22 |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $56.59 | $37.50 | $94.09 |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $58.22 | $37.50 | $95.72 |
| IRONWORKERS: STRUCTURAL (NORTHERN THIRD OF COUNTY) | $52.24 | $50.32 | $102.56 |
| IRONWORKERS: REINFORCING (NORTHERN THIRD OF COUNTY) | $49.94 | $50.32 | $100.26 |
| IRONWORKERS: REINFORCING (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | $53.24 | $40.40 | $93.64 |
| IRONWORKERS: STRUCTURAL (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY) | $54.24 | $40.40 | $94.64 |
| LABORER: MASON TENDER: CEMENT/CONCRETE | $29.35 | $23.07 | $52.42 |
| PLUMBER/PIPEFITTER (OCEAN COUNTY (north of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line) | $34.25 | $21.31 | $55.56 |
| PLUMBER (OCEAN COUNTY (south of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then,continuing along State Highway Route 72 until it reaches the Burlington County line) | $31.50 | $13.41 | $44.91 |
| ROOFER (ALL TYPES) | $34.35 | $21.75 | $56.10 |
| PAINTER: BRUSH AND ROLLER | $25.20 | $5.99 | $31.19 |
| LABORER: COMMON OR GENERAL | $12.33 | $0.00 | $12.33 |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | $2.34 | $15.84 |
| CEMENT MASON/CONCRETE FINISHER | $25.00 | $0.00 | $25.00 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $15.60 | $2.46 | $18.06 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.