Building construction wages: Salem, New Jersey
Wage determination NJ20260041 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NJ20260041 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/NJ20260041/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT) | $47.34 | $30.99 | $78.33 |
| MARBLE SETTER | $64.66 | $40.97 | $105.63 |
| TERRAZZO WORKER/SETTER | $61.77 | $42.82 | $104.59 |
| TILE SETTER | $52.31 | $38.01 | $90.32 |
| EPOXY: $10.00 ADDITIONAL PER DAY | $43.63 | $32.12 | $75.75 |
| CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION | $57.42 | $34.17 | $91.59 |
| SOFT FLOOR LAYER | $57.42 | $34.17 | $91.59 |
| DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER | $58.84 | $35.06 | $93.90 |
| ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (INCLUDING LOW VOLTAGE WIRING) | $46.51 | $34.39 | $80.90 |
| ELECTRICIAN AND CABLE SPLICER: INCLUDING LOW VOLTAGE WIRING | $55.05 | $48.76 | $103.81 |
| ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (INCLUDING LOW VOLTAGE WIRING) | $46.51 | $34.39 | $80.90 |
| ELECTRICIAN AND CABLE SPLICER: INCLUDING LOW VOLTAGE WIRING | $55.05 | $48.76 | $103.81 |
| CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OR 6% FOR 6 MONTHS TO 5 YEARS OF B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $71.85 | $38.44 | $110.29 |
| PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $52.88 | $37.50 | $90.38 |
| WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 |
| DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 |
| HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 | $97.63 |
| DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $54.24 | $40.40 | $94.64 |
| IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 |
| DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTOS AND/OR TOXIC AND HAZARDOUS WASTE OR MATERIALS WHICH SHALL INCLUDE BUT NOT NECESSARILY BE LIMITED TO: THE ERECTION, MOVING, SERVICING AND DISMANTLING OF ALL ENCLOSURES, SCAFFOLDING AND BARRICADES; THE OPERATION OF ALL TOOLS AND EQUIPMENT NORMALLY USED IN THE REMOVAL OR ABATEMENT OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; THE LABELING, BAGGING, CARTONING, CRATING, OR OTHER PACKAGING OF MATERIALS FOR DISPOSAL; THE CLEAN-UP OF THE WORKSITE; AND ALL OTHER WORK INCIDENTAL TO THE REMOVAL, ABATEMENT, ENCAPSULATION, ENCLOSURE, AND DECONTAMINATION OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; AND, IN ADDITION, ALL WORK TASKS INVOLVED IN THE MAINTENANCE AND OPERATION OF ENERGY RESOURCE RECOVERY PLANTS (CO-GENERATION PLANTS) | $28.37 | $21.62 | $49.99 |
| LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 | $66.72 |
| LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 | $65.97 |
| SURFACE, OR ON A SWING STAGE: $1.00 PER HOUR ADDITIONAL | $49.96 | $35.11 | $85.07 |
| DRYWALL FINISHER/TAPER | $44.87 | $30.15 | $75.02 |
| PAINTER: BRUSH AND ROLLER | $45.55 | $29.86 | $75.41 |
| PAINTER: SPRAY | $45.55 | $29.86 | $75.41 |
| CEMENT MASON/CONCRETE FINISHER | $49.57 | $37.06 | $86.63 |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION | $56.30 | $50.76 | $107.06 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $56.30 | $50.76 | $107.06 |
| FELT-LAYING MACHINE: $0.50 PER HOUR WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $0.50 PER HOUR PAID THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY | $35.95 | $21.85 | $57.80 |
| MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $0.50 PER HOUR WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $0.50 PER HOUR PAID THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY | $38.95 | $21.85 | $60.80 |
| FELT-LAYING MACHINE: $0.50 PER HOUR WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $0.50 PER HOUR PAID THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY | $46.03 | $34.27 | $80.30 |
| SPRINKLER FITTER: FIRE SPRINKLERS (SALEM COUNTY (DOES NOT INCLUDE PENNS GROVE, BUT INCLUDES PENNS GROVE AIRPORT)) | $59.19 | $36.51 | $95.70 |
| SPRINKLER FITTER: FIRE SPRINKLERS (WITHIN 15 MILES BEYOND THE CITY LIMITS OF PHILADELPHIA) | $60.83 | $30.34 | $91.17 |
| HOLIDAY: ELECTION DAY | $62.62 | $50.66 | $113.28 |
| DAY | $35.13 | $24.76 | $59.89 |
| HOLIDAY: ELECTION DAY | $62.62 | $50.66 | $113.28 |
| DAY | $35.13 | $24.76 | $59.89 |
| PLASTERER | $42.33 | $0.00 | $42.33 |