NJ20260041: rev 0 → rev 1

4 rate changes, 2 added, 2 removed.

Rate changes

Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.

ClassificationOld totalNew totalΔ/hrHours on jobCost impact
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION$57.57$91.59+34.02
SOFT FLOOR LAYER$57.57$91.59+34.02
CARPENTER: SCAFFOLD BUILDER THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.57$91.59+34.02
MILLWRIGHT WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$59.04$93.90+34.86

Added classifications

ELECTRICIAN: CABLE SPLICER ON LEAD CABLE (INCLUDING LOW VOLTAGE WIRING)$46.51$34.39
ELECTRICIAN AND CABLE SPLICER: INCLUDING LOW VOLTAGE WIRING$55.05$48.76

Removed classifications

Electricians: (Including Low Voltage Wiring) - Cable splicer on lead cablewas $46.51
Electricians: (Including Low Voltage Wiring) - Electrician and cable splicerwas $55.05