Residential construction wages: Mercer, New Jersey
Wage determination NJ20260014 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NJ20260014 on · latest revision 1 · verify at sam.gov/wage-determination/NJ20260014/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $49.60 | $37.96 | $87.56 |
| CEMENT MASON | $49.60 | $37.96 | $87.56 |
| CARPENTER (INCLUDES DRYWALL HANGING) | $48.27 | $11.38 | $59.65 |
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $60.13 | $37.50 | $97.63 |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $61.72 | $37.50 | $99.22 |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $56.59 | $37.50 | $94.09 |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided 1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday | $58.22 | $37.50 | $95.72 |
| IRONWORKER: STRUCTURAL | $54.24 | $40.40 | $94.64 |
| IRONWORKER: REINFORCING | $53.24 | $40.40 | $93.64 |
| LABORER: MASON TENDER: CEMENT/CONCRETE | $29.35 | $23.07 | $52.42 |
| DRYWALL FINISHER/TAPER | $43.41 | $29.86 | $73.27 |
| PLUMBER/PIPEFITTER (MERCER COUNTY (south of a line drawn from the point at which Rt. 602 (also known as Hopewell - Wertsville Rd.) meets the Hunterdon/Mercer County line; then, south along Rt. 602 (also known as Hopewell - Wertsville Rd.) to the Borough of Hopewell, includes the Borough of Hopewell; then, east along the Reading Railroad to the Mercer/Somerset County line (Province Line Rd.)) | $34.25 | $21.31 | $55.56 |
| PLUMBER (MERCER COUNTY (north of a line drawn from the point at which Rt. 602 (also known as Hopewell - Wertsville Rd.) meets the Hunterdon/Mercer County line; then, south along Rt. 602 (also known as Hopewell - Wertsville Rd.) to the Borough of Hopewell, includes the Borough of Hopewell; then, east along the Reading Railroad to the Mercer/Somerset County line (Province Line Rd.) | $62.09 | $45.05 | $107.14 |
| PIPEFITTER (MERCER COUNTY (north of a line drawn from the point at which Rt. 602 (also known as Hopewell - Wertsville Rd.) meets the Hunterdon/Mercer County line; then, south along Rt. 602 (also known as Hopewell - Wertsville Rd.) to the Borough of Hopewell, includes the Borough of Hopewell; then, east along the Reading Railroad to the Mercer/Somerset County line (Province Line Rd.) | $56.37 | $50.80 | $107.17 |
| ROOFER (ALL TYPES) | $34.35 | $21.75 | $56.10 |
| PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING | $20.53 | $0.00 | $20.53 |
| LABORER: COMMON OR GENERAL | $13.16 | $0.00 | $13.16 |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | $2.34 | $15.84 |
| ELECTRICIAN | $37.89 | $16.10 | $53.99 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.