Carpenter prevailing wages: Utah, county by county
100 current carpenter rates across 70 active Utah wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Beaver | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.64 | $0.80 | $21.44 | UT20260069 Building |
| Beaver | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $19.51 | $4.71 | $24.22 | UT20260069 Building |
| Beaver + 11 more | CARPENTER | $7.25 | $0.00 | $7.25 | UT20260002 Residential |
| Beaver + 5 more | CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 | UT20260017 Heavy |
| Beaver, Wayne | CARPENTER, INCLUDES FORM WORK | $22.07 | $6.88 | $28.95 | UT20260102 Highway |
| Box Elder | CARPENTER | $7.73 | $0.00 | $7.73 | UT20260003 Residential |
| Box Elder | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.00 | $3.20 | $24.20 | UT20260081 Building |
| Box Elder | CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 | $45.63 | UT20260081 Building |
| Box Elder | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $20.68 | $5.49 | $26.17 | UT20260081 Building |
| Box Elder | CARPENTER, INCLUDES FORM WORK | $22.84 | $4.64 | $27.48 | UT20260104 Highway |
| Cache | CARPENTER | $14.19 | $2.56 | $16.75 | UT20260030 Residential |
| Cache | CARPENTER | $20.70 | $5.62 | $26.32 | UT20260082 Building |
| Cache | CARPENTER, INCLUDES FORM WORK | $21.87 | $2.80 | $24.67 | UT20260105 Highway |
| Carbon | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.72 | $1.43 | $23.15 | UT20260070 Building |
| Carbon | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $19.51 | $5.30 | $24.81 | UT20260070 Building |
| Carbon | CARPENTER, INCLUDES FORM WORK | $15.18 | $0.68 | $15.86 | UT20260018 Heavy |
| Carbon + 3 more | CARPENTER, INCLUDES FORM WORK | $22.34 | $3.48 | $25.82 | UT20260103 Highway |
| Davis | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.00 | $3.20 | $24.20 | UT20260083 Building |
| Davis | CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 | $45.63 | UT20260083 Building |
| Davis | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $22.02 | $6.84 | $28.86 | UT20260083 Building |
| Davis | CARPENTER, INCLUDES FORM WORK | $22.57 | $3.77 | $26.34 | UT20260106 Highway |
| Davis | CARPENTER, INCLUDES VINYL SIDING INSTALLATION | $13.70 | $1.71 | $15.41 | UT20260031 Residential |
| Duchesne | CARPENTER, INCLUDES FORM WORK | $22.34 | $3.48 | $25.82 | UT20260007 Highway |
| Emery | CARPENTER, INCLUDES FORM WORK | $22.07 | $6.88 | $28.95 | UT20260008 Highway |
| Garfield | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.64 | $0.80 | $21.44 | UT20260071 Building |
| Garfield | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $19.51 | $4.71 | $24.22 | UT20260071 Building |
| Garfield | CARPENTER, INCLUDES FORM WORK | $22.07 | $6.88 | $28.95 | UT20260009 Highway |
| Garfield | CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 | UT20260028 Heavy |
| Grand | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.64 | $0.80 | $21.44 | UT20260072 Building |
| Grand | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $21.50 | $0.00 | $21.50 | UT20260072 Building |
| Grand | CARPENTER, INCLUDES FORM WORK | $22.07 | $6.88 | $28.95 | UT20260010 Highway |
| Iron | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.64 | $0.80 | $21.44 | UT20260073 Building |
| Iron | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $21.29 | $6.38 | $27.67 | UT20260073 Building |
| Iron | CARPENTER, INCLUDES FORM WORK | $22.07 | $6.88 | $28.95 | UT20260012 Highway |
| Iron | CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 | UT20260019 Heavy |
| Juab | CARPENTER | $15.01 | $0.94 | $15.95 | UT20260032 Residential |
| Juab | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.29 | $1.95 | $23.24 | UT20260084 Building |
| Juab | CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 | $45.63 | UT20260084 Building |
| Juab | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $19.51 | $5.18 | $24.69 | UT20260084 Building |
| Juab | CARPENTER (EXCLUDES FORM WORK) | $32.17 | $17.50 | $49.67 | UT20260107 Highway |
| Juab | CARPENTER (FORM WORK ONLY) | $22.59 | $5.41 | $28.00 | UT20260107 Highway |
| Kane | CARPENTER, INCLUDES FORM WORK | $22.07 | $6.88 | $28.95 | UT20260013 Highway |
| Kane + 4 more | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.64 | $0.80 | $21.44 | UT20260080 Building |
| Kane + 4 more | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $19.51 | $4.71 | $24.22 | UT20260080 Building |
| Kane, Millard | CARPENTER | $7.25 | $0.00 | $7.25 | UT20260006 Residential |
| Kane, San Juan | CARPENTER (INCLUDING FORMWORK AND FRAMING) | $10.00 | $0.00 | $10.00 | UT20260004 Residential |
| Millard | CARPENTER, INCLUDES FORM WORK | $22.07 | $6.88 | $28.95 | UT20260014 Highway |
| Millard | CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 | UT20260020 Heavy |
| Morgan | CARPENTER, INCLUDES FORM WORK | $22.84 | $4.64 | $27.48 | UT20260108 Highway |
| Morgan | CARPENTER, INCLUDES VINYL SIDING INSTALLATION | $13.80 | $0.00 | $13.80 | UT20260033 Residential |
| Morgan, Weber | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.00 | $3.20 | $24.20 | UT20260089 Building |
| Morgan, Weber | CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 | $45.63 | UT20260089 Building |
| Morgan, Weber | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $20.68 | $5.49 | $26.17 | UT20260089 Building |
| Piute | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.64 | $0.80 | $21.44 | UT20260074 Building |
| Piute | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $19.51 | $4.71 | $24.22 | UT20260074 Building |
| Piute | CARPENTER, INCLUDES FORM WORK | $22.07 | $6.88 | $28.95 | UT20260015 Highway |
| Rich | CARPENTER | $7.25 | $0.00 | $7.25 | UT20260005 Residential |
| Salt Lake | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.25 | $2.15 | $23.40 | UT20260085 Building |
| Salt Lake | CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 | $45.63 | UT20260085 Building |
| Salt Lake | CARPENTER (FORM WORK ONLY) | $16.93 | $1.93 | $18.86 | UT20260085 Building |
| Salt Lake | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $20.66 | $7.47 | $28.13 | UT20260085 Building |
| Salt Lake | CARPENTER, INCLUDES METAL STUD INSTALLATION, AND SIDING INSTALLATION (EXCLUDES DRYWALL HANGING) | $14.61 | $0.00 | $14.61 | UT20260034 Residential |
| San Juan | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.64 | $0.80 | $21.44 | UT20260075 Building |
| San Juan | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $20.35 | $2.75 | $23.10 | UT20260075 Building |
| San Juan | CARPENTER, INCLUDES FORM WORK | $22.07 | $6.88 | $28.95 | UT20260016 Highway |
| San Juan | CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 | UT20260022 Heavy |
| Sanpete | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.72 | $1.43 | $23.15 | UT20260076 Building |
| Sanpete | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $16.98 | $0.00 | $16.98 | UT20260076 Building |
| Sanpete | CARPENTER, INCLUDES FORM WORK | $22.34 | $3.48 | $25.82 | UT20260098 Highway |
| Sevier | CARPENTER, INCLUDES FORM WORK | $22.07 | $6.88 | $28.95 | UT20260099 Highway |
| Sevier | CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 | UT20260029 Heavy |
| Summit | CARPENTER, INCLUDES FORM WORK | $14.63 | $0.97 | $15.60 | UT20260011 Heavy |
| Summit | CARPENTER, INCLUDES FORM WORK | $21.93 | $3.48 | $25.41 | UT20260100 Highway |
| Summit | CARPENTER, INCLUDES METAL STUD INSTALLATION, AND SIDING INSTALLATION (EXCLUDES DRYWALL HANGING) | $14.61 | $0.00 | $14.61 | UT20260035 Residential |
| Summit + 3 more | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.72 | $1.43 | $23.15 | UT20260079 Building |
| Summit + 3 more | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $19.51 | $5.30 | $24.81 | UT20260079 Building |
| Tooele | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.25 | $2.40 | $23.65 | UT20260086 Building |
| Tooele | CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 | $45.63 | UT20260086 Building |
| Tooele | CARPENTER (FORM WORK ONLY) | $16.93 | $1.93 | $18.86 | UT20260086 Building |
| Tooele | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $20.73 | $7.53 | $28.26 | UT20260086 Building |
| Tooele | CARPENTER, INCLUDES METAL STUD INSTALLATION, AND SIDING INSTALLATION (EXCLUDES DRYWALL HANGING) | $15.26 | $0.00 | $15.26 | UT20260036 Residential |
| Tooele, Salt Lake | CARPENTER (FORM WORK ONLY) | $24.61 | $8.45 | $33.06 | UT20260097 Heavy |
| Tooele, Salt Lake | CARPENTER, INCLUDES FORM WORK | $23.39 | $8.59 | $31.98 | UT20260112 Highway |
| Uintah | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.72 | $1.43 | $23.15 | UT20260077 Building |
| Uintah | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $20.47 | $4.74 | $25.21 | UT20260077 Building |
| Utah | CARPENTER | $15.01 | $0.94 | $15.95 | UT20260037 Residential |
| Utah | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.29 | $1.95 | $23.24 | UT20260087 Building |
| Utah | CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 | $45.63 | UT20260087 Building |
| Utah | CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $19.51 | $5.18 | $24.69 | UT20260087 Building |
| Utah | CARPENTER (EXCLUDES FORM WORK) | $32.17 | $17.50 | $49.67 | UT20260109 Highway |
| Utah | CARPENTER (FORM WORK ONLY) | $22.59 | $5.41 | $28.00 | UT20260109 Highway |
| Wasatch | CARPENTER | $8.50 | $0.00 | $8.50 | UT20260001 Residential |
| Wasatch | CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.72 | $1.43 | $23.15 | UT20260078 Building |
| Wasatch | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $19.51 | $5.30 | $24.81 | UT20260078 Building |
| Wasatch | CARPENTER, INCLUDES FORM WORK | $22.34 | $3.48 | $25.82 | UT20260101 Highway |
| Washington | CARPENTER | $12.00 | $0.94 | $12.94 | UT20260038 Residential |
| Washington | CARPENTER | $19.51 | $5.18 | $24.69 | UT20260088 Building |
| Washington | CARPENTER (INCLUDES FORM WORK) | $32.17 | $17.50 | $49.67 | UT20260110 Highway |
| Weber | CARPENTER, INCLUDES FORM WORK | $22.84 | $4.64 | $27.48 | UT20260111 Highway |
| Weber | CARPENTER, INCLUDES VINYL SIDING INSTALLATION | $13.80 | $0.00 | $13.80 | UT20260039 Residential |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Utah trades.