Building UT20260074 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $44.37 | $26.87 | $71.24 |
| ELECTRICIAN (EXCLUDING LOW VOLTAGE WIRING) | $41.23 | $17.66 | $58.89 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $42.17 | $26.63 | $68.80 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $46.79 | $14.89 | $61.68 |
| TILE SETTER | $19.40 | $0.00 | $19.40 |
| TILE FINISHER | $17.00 | $0.00 | $17.00 |
| PLUMBER | $24.00 | $4.62 | $28.62 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | $0.79 | $17.38 |
| LABORER: MASON TENDER - BRICK | $16.54 | $0.00 | $16.54 |
| LABORER: COMMON OR GENERAL | $12.00 | $0.00 | $12.00 |
| IRONWORKER, STRUCTURAL | $17.41 | $6.13 | $23.54 |
| IRONWORKER, REINFORCING | $15.00 | $0.00 | $15.00 |
| INSULATOR - BATT | $13.77 | $0.00 | $13.77 |
| INSTALLER - SIDING (METAL/ALUMINUM/VINYL) | $14.75 | $0.00 | $14.75 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $23.36 | $6.06 | $29.42 |
| CEMENT MASON/CONCRETE FINISHER | $21.11 | $0.00 | $21.11 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $19.51 | $4.71 | $24.22 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $20.64 | $0.80 | $21.44 |
| BRICKLAYER | $23.88 | $0.00 | $23.88 |
Heavy UT20260017 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $21.65 | $8.65 | $30.30 |
| LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.59 | $8.65 | $29.24 |
| LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | $0.00 | $12.00 |
| LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 | $0.00 | $9.00 |
| LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $10.92 | $0.00 | $10.92 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.00 | $0.36 | $9.36 |
| CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 | $14.56 |
| CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 |
| TRUCK DRIVER ZONE 2: GROUP 3 | $41.57 | $14.90 | $56.47 |
| TRUCK DRIVER ZONE 2: GROUP 2 | $45.57 | $14.90 | $60.47 |
| TRUCK DRIVER ZONE 2: GROUP 1 | $46.18 | $14.90 | $61.08 |
| TRUCK DRIVER ZONE 1: GROUP 3 | $40.66 | $15.75 | $56.41 |
| TRUCK DRIVER ZONE 1: GROUP 2 | $41.06 | $15.75 | $56.81 |
| TRUCK DRIVER ZONE 1: GROUP 1 | $41.71 | $14.75 | $56.46 |
OPERATOR 7 classifications · $10.89 to $53.25 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR | $30.78 | $16.09 | $46.87 |
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | $11.88 | $33.91 |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | $17.57 | $53.25 |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 | $0.00 | $13.63 |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | $0.00 | $10.89 |
| OPERATOR: LOADER (FRONT END) | $11.38 | $0.00 | $11.38 |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | $0.00 | $13.61 |
Highway UT20260015 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $20.31 | $4.06 | $24.37 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.14 | $2.79 | $19.93 |
| TRAFFIC CONTROL: FLAGGER | $12.47 | $2.53 | $15.00 |
| LABORER: PIPELAYER | $15.52 | $2.79 | $18.31 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.03 | $0.36 | $17.39 |
| LABORER: LANDSCAPE | $14.45 | $2.79 | $17.24 |
| LABORER: COMMON OR GENERAL | $18.93 | $2.65 | $21.58 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $19.88 | $5.71 | $25.59 |
| INSTALLER - SIGN | $18.22 | $2.79 | $21.01 |
| INSTALLER - GUARDRAIL | $17.79 | $0.00 | $17.79 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $16.76 | $1.62 | $18.38 |
| ELECTRICIAN | $26.83 | $0.00 | $26.83 |
| CEMENT MASON/CONCRETE FINISHER | $17.36 | $2.04 | $19.40 |
| CARPENTER, INCLUDES FORM WORK | $22.07 | $6.88 | $28.95 |
| TRUCK DRIVER: WATER TRUCK | $29.53 | $14.65 | $44.18 |
OPERATOR 13 classifications · $23.36 to $41.02 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: SCREED | $19.89 | $5.45 | $25.34 |
| OPERATOR: ROLLER | $20.23 | $5.61 | $25.84 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.43 | $8.13 | $31.56 |
| OPERATOR: OILER | $19.00 | $5.44 | $24.44 |
| OPERATOR: MILLING MACHINE | $26.53 | $6.00 | $32.53 |
| OPERATOR: MECHANIC | $25.24 | $10.96 | $36.20 |
| OPERATOR: LOADER | $22.53 | $6.92 | $29.45 |
| OPERATOR: GRADER/BLADE | $23.69 | $5.95 | $29.64 |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | $6.55 | $29.12 |
| OPERATOR: BULLDOZER | $21.77 | $4.40 | $26.17 |
| OPERATOR: BROOM/SWEEPER | $18.29 | $5.65 | $23.94 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | $3.31 | $23.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.37 | $15.65 | $41.02 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.