Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR. (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $30.78 | $16.09 | $46.87 |
| OPERATOR: POWER EQUIPMENT OILER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $22.03 | $11.88 | $33.91 |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $35.68 | $17.57 | $53.25 |
| LABORER: SANDBLASTER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.85 | $8.65 | $29.50 |
| LABORER: POWDERMAN (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $21.65 | $8.65 | $30.30 |
| LABORER: FORMWORKER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.85 | $8.65 | $29.50 |
| LABORER: COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.59 | $8.65 | $29.24 |
| LABORER: CHAIN SAW AND POWER DRILL (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.85 | $8.65 | $29.50 |
| TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | $0.00 | $12.00 |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 | $0.00 | $13.63 |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | $0.00 | $10.89 |
| OPERATOR: LOADER (FRONT END) | $11.38 | $0.00 | $11.38 |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | $0.00 | $13.61 |
| LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 | $0.00 | $9.00 |
| LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 | $0.00 | $9.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.00 | $0.36 | $9.36 |
| CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 | $14.56 |
| CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 |
| $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS: STRINGER TRUCK | $46.02 | $15.75 | $61.77 |
| FOR THE FOLLOWING CLASSIFICATIONS: LOW BOY AND TRUCK MECHANIC | $46.65 | $15.75 | $62.40 |
| TRUCK DRIVER: GROUP 3- AMBULANCE , BUS, DUMP TRUCK (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) (NATURAL GAS PIPELINE CONSTRUCTION ONLY) FOLLOWING CLASSIFICATIONS | $41.90 | $15.75 | $57.65 |