Summit County, Utah: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building UT20260079 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $44.37 | $26.87 | $71.24 |
| ELECTRICIAN | $41.23 | $17.66 | $58.89 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $31.86 | $15.83 | $47.69 |
| ELECTRICIAN | $41.23 | $17.66 | $58.89 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $31.86 | $15.83 | $47.69 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $42.17 | $26.63 | $68.80 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $46.79 | $14.89 | $61.68 |
| TILE SETTER | $20.63 | $0.00 | $20.63 |
| TILE FINISHER | $17.00 | $0.00 | $17.00 |
| PLUMBER | $24.00 | $4.62 | $28.62 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.59 | $0.79 | $17.38 |
| LABORER: MASON TENDER - BRICK | $16.54 | $0.00 | $16.54 |
| LABORER: COMMON OR GENERAL | $13.98 | $0.00 | $13.98 |
| IRONWORKER, STRUCTURAL | $17.41 | $6.13 | $23.54 |
| IRONWORKER, REINFORCING | $15.00 | $0.00 | $15.00 |
| INSULATOR - BATT | $12.50 | $0.23 | $12.73 |
| CEMENT MASON/CONCRETE FINISHER | $21.11 | $0.00 | $21.11 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION | $19.51 | $5.30 | $24.81 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.72 | $1.43 | $23.15 |
| BRICKLAYER | $23.88 | $0.00 | $23.88 |
Heavy UT20260011 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: LINEMAN | $58.83 | $21.21 | $80.04 |
| IRONWORKER | $32.68 | $27.55 | $60.23 |
| WATER & SEWER LINES: OPERATOR-BACKHOE/EXCAVATOR/TRACKHOE | $15.57 | $0.00 | $15.57 |
| WATER & SEWER LINES: LABORER, COMMON OR GENERAL | $12.81 | $0.00 | $12.81 |
| TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $14.40 | $3.99 | $18.39 |
| ELECTRICIAN | $23.74 | $7.64 | $31.38 |
| CEMENT MASON/CONCRETE FINISHER | $17.08 | $3.14 | $20.22 |
| CARPENTER, INCLUDES FORM WORK | $14.63 | $0.97 | $15.60 |
| TRUCK DRIVER ZONE 2: GROUP 3 | $41.90 | $15.75 | $57.65 |
| TRUCK DRIVER ZONE 2: GROUP 2 | $46.02 | $15.75 | $61.77 |
| TRUCK DRIVER ZONE 2: GROUP 1 | $46.65 | $15.75 | $62.40 |
| TRUCK DRIVER ZONE 1: GROUP 3 | $40.37 | $15.10 | $55.47 |
| TRUCK DRIVER ZONE 1: GROUP 2 | $40.75 | $15.10 | $55.85 |
| TRUCK DRIVER ZONE 1: GROUP 1 | $41.39 | $15.10 | $56.49 |
OPERATOR 11 classifications · $19.98 to $60.33 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, BOBCAT/SKID LOADER, FRONT END LOADER(UNDER 2 CU. YDS.), OILER | $36.55 | $18.62 | $55.17 |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BULLDOZER, FRONT END LOADER(2 TO 5 CU. YDS.), GRADE SETTER, OIL DISTRIBUTOR, SCRAPER | $37.79 | $18.62 | $56.41 |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER(OVER 5 CU.YDS.) | $39.01 | $18.62 | $57.63 |
| OPERATOR: POWER EQUIPMENT: (1)MECHANIC-EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION | $41.71 | $18.62 | $60.33 |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $36.55 | $18.62 | $55.17 |
| OPERATOR: POWER EQUIPMENT ((7) ROLLER(DIRT AND GRADE COMPACTION)) | $34.25 | $18.62 | $52.87 |
| OPERATOR: POWER EQUIPMENT ((2A)BLADE/GRADER) | $40.32 | $18.62 | $58.94 |
| OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, MECHANIC: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | $17.57 | $53.25 |
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | $11.88 | $33.91 |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE AND WATER/SEWER LINE CONSTRUCTION) | $19.98 | $0.00 | $19.98 |
| OPERATOR: CRANE | $28.97 | $9.40 | $38.37 |
LABORER 8 classifications · $7.25 to $30.30 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: POT TENDER AND SAND BLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| LABORER: COMMON OR GENERAL, PIPELAYER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.59 | $8.65 | $29.24 |
| LABORER: (5)HAND HELD DRILL | $21.65 | $8.65 | $30.30 |
| LABORER: (3) MASON TENDER (CEMENT/CONCRETE), HAND HELD SAW, JACKHAMMER, POWER SAW) | $20.85 | $8.65 | $29.50 |
| LABORER: (1)FLAGGER | $20.59 | $8.65 | $29.24 |
| LABORER: (1) COMMON OR GENERAL: EXCLUDING NATURAL GAS PIPELINE & WATER/SEWER LINE CONSTRUCTION | $20.59 | $8.65 | $29.24 |
| LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $14.00 | $0.00 | $14.00 |
| LABORER: LANDSCAPE | $7.25 | $0.00 | $7.25 |
Highway UT20260100 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $22.44 | $11.51 | $33.95 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $27.34 | $8.55 | $35.89 |
| TRUCK DRIVER: DUMP TRUCK | $22.32 | $9.09 | $31.41 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.77 | $8.65 | $31.42 |
| TRAFFIC CONTROL: FLAGGER | $15.00 | $4.13 | $19.13 |
| LABORER: PIPELAYER | $18.04 | $2.79 | $20.83 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $16.62 | $2.71 | $19.33 |
| LABORER: LANDSCAPE | $15.16 | $2.79 | $17.95 |
| LABORER: COMMON OR GENERAL | $17.41 | $2.77 | $20.18 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $24.66 | $8.65 | $33.31 |
| INSTALLER - SIGN | $17.48 | $2.73 | $20.21 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $19.26 | $1.62 | $20.88 |
| FENCE ERECTOR | $15.86 | $2.84 | $18.70 |
| ELECTRICIAN | $26.83 | $0.00 | $26.83 |
| CEMENT MASON/CONCRETE FINISHER | $21.26 | $2.87 | $24.13 |
| CARPENTER, INCLUDES FORM WORK | $21.93 | $3.48 | $25.41 |
OPERATOR 13 classifications · $23.36 to $43.57 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: SCREED | $26.14 | $12.31 | $38.45 |
| OPERATOR: ROLLER | $27.66 | $11.03 | $38.69 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.37 | $15.65 | $40.02 |
| OPERATOR: OILER | $19.00 | $5.44 | $24.44 |
| OPERATOR: MILLING MACHINE | $27.81 | $7.26 | $35.07 |
| OPERATOR: MECHANIC | $27.43 | $15.65 | $43.08 |
| OPERATOR: LOADER | $25.37 | $15.65 | $41.02 |
| OPERATOR: GRADER/BLADE | $27.92 | $15.65 | $43.57 |
| OPERATOR: CONCRETE FINISHING MACHINE | $22.57 | $6.55 | $29.12 |
| OPERATOR: BULLDOZER | $24.21 | $1.59 | $25.80 |
| OPERATOR: BROOM/SWEEPER | $20.28 | $7.41 | $27.69 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.05 | $3.31 | $23.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.01 | $6.88 | $29.89 |
Residential UT20260035 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (CHAIN/CONCRETE SAW, JACKHAMMER AND VIBRATOR) | $18.63 | $6.35 | $24.98 |
| CEMENT MASON/CONCRETE FINISHER | $36.66 | $11.25 | $47.91 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $30.60 | $10.85 | $41.45 |
| SPRINKLER FITTER | $38.17 | $25.54 | $63.71 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION | $15.31 | $0.00 | $15.31 |
| ROOFER | $17.14 | $0.00 | $17.14 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $11.23 | $0.00 | $11.23 |
| ELECTRICIAN | $16.06 | $1.97 | $18.03 |
| DRYWALL HANGER | $18.82 | $0.00 | $18.82 |
| DRYWALL FINISHER/TAPER | $17.90 | $1.96 | $19.86 |
| CARPENTER, INCLUDES METAL STUD INSTALLATION, AND SIDING INSTALLATION (EXCLUDES DRYWALL HANGING) | $14.61 | $0.00 | $14.61 |
| BRICKLAYER | $17.92 | $0.00 | $17.92 |
TRUCK DRIVER 29 classifications · $42.50 to $47.34 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TIREMEN AND GREASER | $30.19 | $14.65 | $44.84 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (LESS THAN 1,200 GAL.) | $29.37 | $14.65 | $44.02 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (6,000 GAL. TO LESS THAN 10,000 GAL) | $28.60 | $14.65 | $43.25 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (4,000 GAL. TO LESS THAN 6,000 GAL) | $28.33 | $14.65 | $42.98 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (25,000 GAL. AND OVER) | $31.20 | $14.65 | $45.85 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (20,000 GAL. TO LESS THAN 25,000 GAL) | $31.04 | $14.65 | $45.69 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (2,500 GAL. TO LESS THAN 4,000 GAL) | $29.53 | $14.65 | $44.18 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (15,000 GAL. TO LESS THAN 20,000 GAL) | $30.66 | $14.65 | $45.31 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (10,000 GAL. TO LESS THAN 15,000 GAL) | $30.59 | $14.65 | $45.24 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (1,200 GAL. TO LESS THAN 2,500 GAL) | $27.85 | $14.65 | $42.50 |
| TRUCK DRIVER: TRANSIT MIX (OVER 8 CU. YDS. TO 14 CU. YDS) | $29.72 | $14.65 | $44.37 |
| TRUCK DRIVER: TRANSIT MIX (0 CU. YDS. TO 8 CU. YDS) | $29.62 | $14.65 | $44.27 |
| TRUCK DRIVER: LOWBOY | $32.69 | $14.65 | $47.34 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (PICKUP TRUCK) | $29.18 | $14.65 | $43.83 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (LESS THAN 10 TONS) | $29.26 | $14.65 | $43.91 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (20 TONS AND OVER) | $29.69 | $14.65 | $44.34 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (15 TONS TO LESS THAN 20 TONS) | $29.53 | $14.65 | $44.18 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (10 TONS TO LESS THAN 15 TONS) | $29.42 | $14.65 | $44.07 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (LESS THAN 8 CU. YDS.) | $29.37 | $14.65 | $44.02 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (95 CU. YDS. TO LESS THAN 105 CU. YDS.) | $30.56 | $14.65 | $45.21 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (8 CU. YDS. TO LESS THAN 14 CU. YDS.) | $29.53 | $14.65 | $44.18 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (75 CU. YDS. TO LESS THAN 95 CU. YDS.) | $30.34 | $14.65 | $44.99 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (55 CU. YDS. TO LESS THAN 75 CU. YDS.) | $30.12 | $14.65 | $44.77 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (35 CU. YDS. TO LESS THAN 55 CU. YDS.) | $29.91 | $14.65 | $44.56 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (14 CU. YDS. TO LESS THAN 35 CU. YDS.) | $29.67 | $14.65 | $44.32 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (105 CU. YDS. TO LESS THAN 130 CU. YDS.) | $30.69 | $14.65 | $45.34 |
| TRUCK DRIVER: CONCRETE PUMPING | $29.62 | $14.65 | $44.27 |
| TRUCK DRIVER: ARTICULATED | $32.14 | $14.65 | $46.79 |
| TRUCK DRIVER: OIL SPREADER | $32.68 | $14.65 | $47.33 |
OPERATOR 8 classifications · $14.89 to $43.20 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | $15.65 | $37.15 |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | $15.65 | $39.02 |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | $15.65 | $40.02 |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | $15.65 | $41.02 |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | $15.65 | $41.54 |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | $15.65 | $43.20 |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | $15.65 | $38.06 |
| OPERATOR: TRACKHOE | $14.89 | $0.00 | $14.89 |
LABORER 6 classifications · $10.19 to $15.17 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER (BRICK AND HOD) | $12.00 | $0.00 | $12.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.95 | $0.00 | $12.95 |
| LABORER: LANDSCAPE | $10.00 | $0.19 | $10.19 |
| LABORER: COMMON OR GENERAL | $11.54 | $3.63 | $15.17 |
| LABORER: ASPHALT SHOVELER | $12.95 | $0.00 | $12.95 |
| LABORER: ASPHALT RAKER | $13.00 | $0.00 | $13.00 |