Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 | $45.63 |
| ELECTRICIAN | $41.23 | $17.66 | $58.89 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $31.86 | $15.83 | $47.69 |
| DRYWALL FINISHER/TAPER | $26.00 | $8.78 | $34.78 |
| PLUMBER/PIPEFITTER | $46.10 | $15.83 | $61.93 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $42.17 | $26.63 | $68.80 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $46.79 | $14.89 | $61.68 |
| TRUCK DRIVER: DUMP TRUCK | $17.74 | $2.66 | $20.40 |
| TILE SETTER | $23.00 | $0.00 | $23.00 |
| TILE FINISHER | $13.54 | $0.00 | $13.54 |
| ROOFER | $15.62 | $0.00 | $15.62 |
| PAINTER (BRUSH, ROLLER AND SPRAY, EXCLUDING DRYWALLING/TAPING) | $15.33 | $0.00 | $15.33 |
| OPERATOR: LOADER | $19.34 | $0.00 | $19.34 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.92 | $0.00 | $16.92 |
| LABORER: PIPELAYER | $13.57 | $0.00 | $13.57 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.87 | $0.14 | $14.01 |
| LABORER: MASON TENDER - BRICK | $16.38 | $1.00 | $17.38 |
| LABORER: IRRIGATION | $9.50 | $0.00 | $9.50 |
| LABORER: COMMON OR GENERAL | $13.40 | $1.48 | $14.88 |
| IRONWORKER, STRUCTURAL | $20.21 | $3.22 | $23.43 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $17.76 | $1.83 | $19.59 |
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 | $16.00 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $20.68 | $5.49 | $26.17 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $21.00 | $3.20 | $24.20 |
| BRICKLAYER | $22.13 | $1.67 | $23.80 |