San Juan County, Utah: Davis-Bacon prevailing wages

Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.

Building UT20260075 rev 1

ClassificationRateFringeTotal
BOILERMAKER$44.37$26.87$71.24
ELECTRICIAN (EXCLUDING LOW VOLTAGE WIRING)$41.23$17.66$58.89
SPRINKLER FITTER (FIRE SPRINKLERS)$42.17$26.63$68.80
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$46.79$14.89$61.68
TILE SETTER$19.40$0.00$19.40
TILE FINISHER$17.00$0.00$17.00
PLUMBER$24.00$4.62$28.62
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$16.59$0.79$17.38
LABORER: MASON TENDER - BRICK$16.54$0.00$16.54
LABORER: COMMON OR GENERAL$10.63$0.00$10.63
IRONWORKER, STRUCTURAL$17.41$6.13$23.54
IRONWORKER, REINFORCING$15.00$0.00$15.00
INSULATOR - BATT$13.77$0.00$13.77
INSTALLER - SIDING (METAL/ALUMINUM/VINYL)$14.75$0.00$14.75
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$23.36$6.06$29.42
CEMENT MASON/CONCRETE FINISHER$21.11$0.00$21.11
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION$20.35$2.75$23.10
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$20.64$0.80$21.44
BRICKLAYER$23.88$0.00$23.88

Heavy UT20260022 rev 1

ClassificationRateFringeTotal
LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65$29.50
LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY$21.65$8.65$30.30
LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65$29.50
LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.59$8.65$29.24
LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65$29.50
TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$12.00$0.00$12.00
LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$9.00$0.00$9.00
LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$12.00$0.00$12.00
LABORER: MASON TENDER - CEMENT/CONCRETE$9.00$0.36$9.36
CEMENT MASON/CONCRETE FINISHER$14.00$0.56$14.56
CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK)$14.75$3.03$17.78
PAY: ADD $2.25 TO THE ABOVE RATE$46.02$15.75$61.77
PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE$46.65$15.75$62.40
TRUCK DRIVER: GROUP 3 AMBULANCE , BUS, DUMP TRUCK (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) NATURAL GAS PIPELINE CONSTRUCTION ONLY PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS GROUP 1: LOW BOY AND TRUCK MECHANIC GROUP 2: STRINGER TRUCK$41.90$15.75$57.65
OPERATOR 8 classifications · $10.89 to $53.25 total
ClassificationRateFringeTotal
OPERATOR: POWER EQUIPMENT (3)BACKHOE: EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION$30.78$16.09$46.87
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$22.03$11.88$33.91
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$35.68$17.57$53.25
OPERATOR: EXCAVATOR (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$12.75$0.00$12.75
OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$13.63$0.00$13.63
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION)$10.89$0.00$10.89
OPERATOR: LOADER (FRONT END)$11.38$0.00$11.38
OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION$13.61$0.00$13.61

Highway UT20260016 rev 1

ClassificationRateFringeTotal
TRUCK DRIVER: DUMP TRUCK$19.08$4.52$23.60
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$17.14$2.79$19.93
TRAFFIC CONTROL: FLAGGER$12.47$2.53$15.00
LABORER: PIPELAYER$15.52$2.79$18.31
LABORER: MASON TENDER - CEMENT/CONCRETE$17.03$0.36$17.39
LABORER: LANDSCAPE$14.45$2.79$17.24
LABORER: COMMON OR GENERAL$13.37$2.65$16.02
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$20.66$5.61$26.27
INSTALLER - SIGN$18.22$2.79$21.01
INSTALLER - GUARDRAIL$17.79$0.00$17.79
HIGHWAY/PARKING LOT STRIPING: PAINTER$16.76$1.62$18.38
ELECTRICIAN$26.83$0.00$26.83
CEMENT MASON/CONCRETE FINISHER$17.36$2.04$19.40
CARPENTER, INCLUDES FORM WORK$22.07$6.88$28.95
TRUCK DRIVER: WATER TRUCK$29.53$14.65$44.18
OPERATOR 13 classifications · $23.36 to $36.20 total
ClassificationRateFringeTotal
OPERATOR: SCREED$19.89$5.45$25.34
OPERATOR: ROLLER$25.56$6.12$31.68
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$23.43$8.13$31.56
OPERATOR: OILER$19.00$5.44$24.44
OPERATOR: MILLING MACHINE$26.53$6.00$32.53
OPERATOR: MECHANIC$25.24$10.96$36.20
OPERATOR: LOADER$23.83$12.18$36.01
OPERATOR: GRADER/BLADE$23.69$5.95$29.64
OPERATOR: CONCRETE FINISHING MACHINE$22.57$6.55$29.12
OPERATOR: BULLDOZER$21.77$4.40$26.17
OPERATOR: BROOM/SWEEPER$18.29$5.65$23.94
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$20.05$3.31$23.36
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$22.10$5.97$28.07

Residential UT20260002 rev 1

ClassificationRateFringeTotal
ROOFER$8.00$0.00$8.00
POWER EQUIPMENT OPERATOR - BACKHOE$7.25$0.00$7.25
PLUMBER$9.00$0.00$9.00
PAINTER$7.25$0.00$7.25
LABORERS: UNSKILLED$7.25$0.00$7.25
LABORERS: HOD CARRIER$7.25$0.00$7.25
ELECTRICIAN$7.25$0.00$7.25
CARPENTER$7.25$0.00$7.25