Heavy construction wages: Sevier, Utah
Wage determination UT20260029 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/UT20260029 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/UT20260029/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | $11.88 | $33.91 |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | $17.57 | $53.25 |
| LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $21.65 | $8.65 | $30.30 |
| LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.59 | $8.65 | $29.24 |
| LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | $0.00 | $12.00 |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | $0.00 | $10.89 |
| OPERATOR: LOADER (FRONT END) | $12.00 | $0.00 | $12.00 |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | $0.00 | $13.61 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | $0.00 | $12.00 |
| LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.32 | $0.00 | $9.32 |
| LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $10.92 | $0.00 | $10.92 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.00 | $0.36 | $9.36 |
| CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 | $14.56 |
| CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 |
| PAY: ADD $2.25 TO THE ABOVE RATE | $41.06 | $15.75 | $56.81 |
| PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE | $41.71 | $15.75 | $57.46 |
| TRUCK DRIVER: GROUP 3 AMBULANCE , BUS, DUMP TRUCK (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) NATURAL GAS PIPELINE CONSTRUCTION ONLY PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS GROUP 1: LOW BOY AND TRUCK MECHANIC GROUP 2: STRINGER TRUCK | $40.66 | $15.75 | $56.41 |