Heavy construction wages: Millard, Utah

Wage determination UT20260020 · Active · Standard · verify on SAM.gov

Millard

Get an email when this determination changes.No substantive rate changes here in the last 12 months. The watch exists for the day that changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR$30.78$16.09$46.87
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$22.03$11.88$33.91
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$35.68$17.57$53.25
LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65$29.50
LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY$21.65$8.65$30.30
LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65$29.50
LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.59$8.65$29.24
LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65$29.50
TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$12.00$0.00$12.00
OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$13.63$0.00$13.63
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION)$10.89$0.00$10.89
OPERATOR: LOADER (FRONT END)$11.38$0.00$11.38
OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION$13.61$0.00$13.61
LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$9.00$0.00$9.00
LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$10.92$0.00$10.92
LABORER: MASON TENDER - CEMENT/CONCRETE$9.00$0.36$9.36
CEMENT MASON/CONCRETE FINISHER$14.00$0.56$14.56
CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK)$14.75$3.03$17.78
TRUCK DRIVER: NATURAL GAS PIPELINE CONSTRUCTION ONLY: GROUP 2 STRINGER TRUCK PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE$46.02$15.75$61.77
TRUCK DRIVER: NATURAL GAS PIPELINE CONSTRUCTION ONLY: GROUP 1 LOW BOY AND TRUCK MECHANIC PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE$46.65$15.75$62.40
TRUCK DRIVER: GROUP 3 AMBULANCE , BUS, DUMP TRUCK (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) NATURAL GAS PIPELINE CONSTRUCTION ONLY PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS GROUP 1: LOW BOY AND TRUCK MECHANIC GROUP 2: STRINGER TRUCK$41.90$15.75$57.65

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.