Highway construction wages: Juab, Utah
Wage determination UT20260107 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/UT20260107 on · latest revision 1 · verify at sam.gov/wage-determination/UT20260107/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (EXCLUDES FORM WORK) | $32.17 | $17.50 | $49.67 |
| POWER EQUIPMENT OPERATOR (OILER) | $31.99 | $17.64 | $49.63 |
| TRUCK DRIVER: WATER TRUCK | $24.35 | $11.73 | $36.08 |
| TRUCK DRIVER: VACTOR | $23.40 | $0.00 | $23.40 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $25.68 | $11.25 | $36.93 |
| TRUCK DRIVER: DUMP TRUCK | $24.09 | $13.04 | $37.13 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | $8.65 | $29.24 |
| TRAFFIC CONTROL: FLAGGER | $13.14 | $1.75 | $14.89 |
| OPERATOR: PAVEMENT MARKING GRINDER | $27.95 | $7.05 | $35.00 |
| OPERATOR: SCREED | $23.95 | $12.17 | $36.12 |
| OPERATOR: ROLLER | $23.16 | $12.31 | $35.47 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.37 | $15.65 | $40.02 |
| OPERATOR: MILLING MACHINE | $26.78 | $15.65 | $42.43 |
| OPERATOR: MECHANIC | $26.92 | $13.23 | $40.15 |
| OPERATOR: LOADER | $24.86 | $12.91 | $37.77 |
| OPERATOR: GRADER/BLADE | $27.33 | $15.42 | $42.75 |
| OPERATOR: DRILL | $27.44 | $15.65 | $43.09 |
| OPERATOR: CRANE | $30.66 | $10.61 | $41.27 |
| OPERATOR: CONCRETE FINISHING MACHINE | $20.03 | $6.55 | $26.58 |
| OPERATOR: BROOM/SWEEPER | $14.52 | $7.83 | $22.35 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $23.97 | $10.06 | $34.03 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.28 | $5.64 | $27.92 |
| LABORER: PIPELAYER | $17.23 | $2.79 | $20.02 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.46 | $2.64 | $16.10 |
| LABORER: LANDSCAPE | $15.40 | $2.53 | $17.93 |
| LABORER: COMMON OR GENERAL | $22.83 | $12.25 | $35.08 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.83 | $5.92 | $29.75 |
| IRONWORKER, REINFORCING | $26.61 | $13.76 | $40.37 |
| INSTALLER - SIGN | $15.00 | $2.53 | $17.53 |
| INSTALLER - GUARDRAIL | $14.80 | $2.66 | $17.46 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $17.60 | $2.53 | $20.13 |
| FENCE ERECTOR | $15.16 | $2.53 | $17.69 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $27.45 | $2.30 | $29.75 |
| CEMENT MASON/CONCRETE FINISHER | $20.59 | $2.41 | $23.00 |
| CARPENTER (FORM WORK ONLY) | $22.59 | $5.41 | $28.00 |