Power Equipment Operator prevailing wages: Kentucky, county by county
776 current power equipment operator rates across 101 active Kentucky wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Adair, Simpson | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.11 | $13.00 | $34.11 | KY20260037 Building |
| Adair, Simpson | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260037 Building |
| Adair, Simpson | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260037 Building |
| Adair, Simpson | POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 | KY20260037 Building |
| Adair, Simpson | POWER EQUIPMENT OPERATOR: BULLDOZER | $41.98 | $19.60 | $61.58 | KY20260037 Building |
| Adair, Simpson | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260037 Building |
| Adair, Simpson | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260037 Building |
| Allen + 3 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.40 | $9.60 | $36.00 | KY20260099 Building |
| Allen + 3 more | OPERATOR: BULLDOZER | $24.51 | $12.72 | $37.23 | KY20260099 Building |
| Allen + 3 more | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260099 Building |
| Allen + 3 more | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260099 Building |
| Allen + 3 more | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260099 Building |
| Allen + 3 more | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260099 Building |
| Allen + 3 more | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260099 Building |
| Allen + 3 more | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260099 Building |
| Allen + 3 more | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260099 Building |
| Allen, Butler | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.64 | $9.56 | $33.20 | KY20260081 Heavy |
| Allen, Butler | OPERATOR: BULLDOZER | $23.31 | $9.51 | $32.82 | KY20260081 Heavy |
| Allen, Butler | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260081 Heavy |
| Allen, Butler | OPERATOR: MECHANIC | $22.43 | $11.75 | $34.18 | KY20260081 Heavy |
| Allen, Butler | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260081 Heavy |
| Allen, Butler | OPERATOR: ROLLER | $20.21 | $13.00 | $33.21 | KY20260081 Heavy |
| Allen, Butler | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260081 Heavy |
| Allen, Butler | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; LOADER; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260081 Heavy |
| Allen, Butler | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260081 Heavy |
| Allen, Butler | POWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260081 Heavy |
| Anderson + 15 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.55 | $10.61 | $35.16 | KY20260018 Building |
| Anderson + 15 more | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260018 Building |
| Anderson + 15 more | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260018 Building |
| Anderson + 15 more | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260018 Building |
| Anderson + 15 more | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260018 Building |
| Anderson + 15 more | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260018 Building |
| Anderson + 15 more | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260018 Building |
| Anderson + 19 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.42 | $12.70 | $39.12 | KY20260059 Heavy |
| Anderson + 19 more | OPERATOR: BULLDOZER | $29.96 | $13.00 | $42.96 | KY20260059 Heavy |
| Anderson + 19 more | OPERATOR: LOADER | $25.35 | $13.00 | $38.35 | KY20260059 Heavy |
| Anderson + 19 more | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; GRADER/BLADE; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $9.50 | $51.05 | KY20260059 Heavy |
| Anderson + 19 more | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $9.50 | $48.19 | KY20260059 Heavy |
| Anderson + 19 more | POWER EQUIPMENT OPERATOR GROUP 4 OILER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $9.50 | $47.87 | KY20260059 Heavy |
| Anderson + 43 more | POWER EQUIPMENT OPERATOR GROUP 1 A-FRAME WINCH TRUCK; AUTO PATROL; BACKFILLER; BATCHER PLANT; BITUMINOUS PAVER; BITUMINOUS TRANSFER MACHINE; BOOM CAT; BULLDOZER; MECHANIC; CABLEWAY; CARRY-ALL SCOOP; CARRY DECK CRANE; CENTRAL COMPRESSOR PLANT; CHERRY PICKER; CLAMSHELL; CONCRETE MIXER (21 CU. FT. OR OVER); CONCRETE PAVER; TRUCK-MOUNTED CONCRETE PUMP; CORE DRILL; CRANE; CRUSHER PLANT; DERRICK; DERRICK BOAT; DITCHING & TRENCHING MACHINE; DRAGLINE; DREDGE OPERATOR; DREDGE ENGINEER; ELEVATING GRADER & LOADERS; GRADE-ALL; GURRIES; HEAVY EQUIPMENT ROBOTICS OPERATOR/MECHANIC; HIGH LIFT; HOE-TYPE MACHINE; HOIST (TWO OR MORE DRUMS); HOISTING ENGINE (TWO OR MORE DRUMS); HORIZONTAL DIRECTIONAL DRILL OPERATOR; HYDROCRANE; HYSTER; KECAL LOADER; LETOURNEAU; LOCOMOTIVE; MECHANIC; MECHANICALLY OPERATED LASER SCREED; MECHANIC WELDER; MUCKING MACHINE; MOTOR SCRAPER; ORANGEPEEL BUCKET; OVERHEAD CRANE; PILEDRIVER; POWER BLADE; PUMPCRETE; PUSH DOZER; ROCK SPREADER, ATTACHED TO EQUIPMENT; ROTARY DRILL; ROLLER (BITUMINOUS); ROUGH TERRAIN CRANE; SCARIFIER; SCOOPMOBILE; SHOVEL; SIDE BOOM; SUBGRADER; TAILBOOM; TELESCOPING TYPE FORKLIFT; TOW OR PUSH BOAT; TOWER CRANE (FRENCH, GERMAN & OTHER TYPES); TRACTOR SHOVEL; TRUCK CRANE; TUNNEL MINING MACHINES, INCLUDING MOLES, SHIELDS OR SIMILAR TYPES OF TUNNEL MINING EQUIPMENT CRANES - WITH BOOMS 150 FT. & OVER (INCLUDING JIB), AND WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUALS OR EXCEEDS 150 FT. - $1.00 OVER GROUP 1 RATE EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260038 Highway |
| Anderson + 43 more | POWER EQUIPMENT OPERATOR GROUP 2 AIR COMPRESSOR (OVER 900 CU. FT. PER MIN.); BITUMINOUS MIXER; BOOM TYPE TAMPING MACHINE; BULL FLOAT; CONCRETE MIXER (UNDER 21 CU. FT.); DREDGE ENGINEER; ELECTRIC VIBRATOR; COMPACTOR/SELF-PROPELLED COMPACTOR; ELEVATOR (ONE DRUM OR BUCK HOIST); ELEVATOR (WHEN USED TO HOIST BUILDING MATERIAL); FINISH MACHINE; FIREMEN & HOIST (ONE DRUM); FLEXPLANE; FORKLIFT (REGARDLESS OF LIFT HEIGHT); FORM GRADER; JOINT SEALING MACHINE; OUTBOARD MOTOR BOAT; POWER SWEEPER (RIDING TYPE); ROLLER (ROCK); ROSS CARRIER; SKID MOUNTED OR TRAILER MOUNTED CONRETE PUMP; SKID STEER MACHINE WITH ALL ATTACHMENTS; SWITCHMAN OR BRAKEMAN; THROTTLE VALVE PERSON; TRACTAIR & ROAD WIDENING TRENCHER; TRACTOR (50 H.P. OR OVER); TRUCK CRANE OILER; TUGGER; WELDING MACHINE; WELL POINTS; & WHIRLEY OILER CRANES - WITH BOOMS 150 FT. & OVER (INCLUDING JIB), AND WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUALS OR EXCEEDS 150 FT. - $1.00 OVER GROUP 1 RATE EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260038 Highway |
| Anderson + 43 more | POWER EQUIPMENT OPERATOR GROUP 3 ALL OFF ROAD MATERIAL HANDLING EQUIPMENT, INCLUDING ARTICULATING DUMP TRUCKS; GREASER ON GREASE FACILITIES SERVICING HEAVY EQUIPMENT CRANES - WITH BOOMS 150 FT. & OVER (INCLUDING JIB), AND WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUALS OR EXCEEDS 150 FT. - $1.00 OVER GROUP 1 RATE EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260038 Highway |
| Anderson + 43 more | POWER EQUIPMENT OPERATOR GROUP 4 BITUMINOUS DISTRIBUTOR; BURLAP & CURING MACHINE; CEMENT GUN; CONCRETE SAW; CONVEYOR; DECKHAND OILER; GROUT PUMP; HYDRAULIC POST DRIVER; HYDRO SEEDER; MUD JACK; OILER; PAVING JOINT MACHINE; POWER FORM HANDLING EQUIPMENT; PUMP; ROLLER (EARTH); STEERMAN; TAMPING MACHINE; TRACTOR (UNDER 50 H.P.); & VIBRATOR CRANES - WITH BOOMS 150 FT. & OVER (INCLUDING JIB), AND WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUALS OR EXCEEDS 150 FT. - $1.00 OVER GROUP 1 RATE EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260038 Highway |
| Ballard | OPERATOR: BORING MACHINE | $25.35 | $13.00 | $38.35 | KY20260045 Heavy |
| Ballard | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE; DRILL; GRADER/BLADE; LOADER; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260045 Heavy |
| Ballard | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT; TRACTOR (50 H.P. OR OVER) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260045 Heavy |
| Ballard | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260045 Heavy |
| Ballard | POWER EQUIPMENT OPERATOR GROUP 4 OILER; TRACTOR (UNDER 50 H.P.) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260045 Heavy |
| Ballard + 14 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.30 | $10.73 | $38.03 | KY20260041 Building |
| Ballard + 14 more | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260041 Building |
| Ballard + 14 more | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260041 Building |
| Ballard + 14 more | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260041 Building |
| Ballard + 14 more | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260041 Building |
| Ballard + 14 more | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $1.00 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $1.00 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260041 Building |
| Ballard + 14 more | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260041 Building |
| Ballard + 29 more | POWER EQUIPMENT OPERATOR GROUP 1 A-FRAME WINCH TRUCK; AUTO PATROL; BACKFILLER; BATCHER PLANT; BITUMINOUS PAVER; BITUMINOUS TRANSFER MACHINE; BOOM CAT; BULLDOZER; MECHANIC; CABLEWAY; CARRY-ALL SCOOP; CARRY DECK CRANE; CENTRAL COMPRESSOR PLANT; CHERRY PICKER; CLAMSHELL; CONCRETE MIXER (21 CU. FT. OR OVER); CONCRETE PAVER; TRUCK-MOUNTED CONCRETE PUMP; CORE DRILL; CRANE; CRUSHER PLANT; DERRICK; DERRICK BOAT; DITCHING & TRENCHING MACHINE; DRAGLINE; DREDGE OPERATOR; DREDGE ENGINEER; ELEVATING GRADER & LOADERS; GRADE-ALL; GURRIES; HEAVY EQUIPMENT ROBOTICS OPERATOR/MECHANIC; HIGH LIFT; HOE-TYPE MACHINE; HOIST (TWO OR MORE DRUMS); HOISTING ENGINE (TWO OR MORE DRUMS); HORIZONTAL DIRECTIONAL DRILL OPERATOR; HYDROCRANE; HYSTER; KECAL LOADER; LETOURNEAU; LOCOMOTIVE; MECHANIC; MECHANICALLY OPERATED LASER SCREED; MECHANIC WELDER; MUCKING MACHINE; MOTOR SCRAPER; ORANGEPEEL BUCKET; OVERHEAD CRANE; PILEDRIVER; POWER BLADE; PUMPCRETE; PUSH DOZER; ROCK SPREADER, ATTACHED TO EQUIPMENT; ROTARY DRILL; ROLLER (BITUMINOUS); ROUGH TERRAIN CRANE; SCARIFIER; SCOOPMOBILE; SHOVEL; SIDE BOOM; SUBGRADER; TAILBOOM; TELESCOPING TYPE FORKLIFT; TOW OR PUSH BOAT; TOWER CRANE (FRENCH, GERMAN & OTHER TYPES); TRACTOR SHOVEL; TRUCK CRANE; TUNNEL MINING MACHINES, INCLUDING MOLES, SHIELDS OR SIMILAR TYPES OF TUNNEL MINING EQUIPMENT CRANES - WITH BOOMS 150 FT. & OVER (INCLUDING JIB), AND WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING EQUALS OR EXCEEDS 150 FT. - $1.00 ABOVE GROUP 1 RATE EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260040 Highway |
| Ballard + 29 more | POWER EQUIPMENT OPERATOR GROUP 2 AIR COMPRESSOR (OVER 900 CU. FT. PER MIN.); BITUMINOUS MIXER; BOOM TYPE TAMPING MACHINE; BULL FLOAT; CONCRETE MIXER (UNDER 21 CU. FT.); DREDGE ENGINEER; ELECTRIC VIBRATOR; COMPACTOR/SELF-PROPELLED COMPACTOR; ELEVATOR (ONE DRUM OR BUCK HOIST); ELEVATOR (WHEN USED TO HOIST BUILDING MATERIAL); FINISH MACHINE; FIREMEN & HOIST (ONE DRUM); FLEXPLANE; FORKLIFT (REGARDLESS OF LIFT HEIGHT); FORM GRADER; JOINT SEALING MACHINE; OUTBOARD MOTOR BOAT; POWER SWEEPER (RIDING TYPE); ROLLER (ROCK); ROSS CARRIER; SKID MOUNTED OR TRAILER MOUNTED CONRETE PUMP; SKID STEER MACHINE WITH ALL ATTACHMENTS; SWITCHMAN OR BRAKEMAN; THROTTLE VALVE PERSON; TRACTAIR & ROAD WIDENING TRENCHER; TRACTOR (50 H.P. OR OVER); TRUCK CRANE OILER; TUGGER; WELDING MACHINE; WELL POINTS;& WHIRLEY OILER CRANES - WITH BOOMS 150 FT. & OVER (INCLUDING JIB), AND WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING EQUALS OR EXCEEDS 150 FT. - $1.00 ABOVE GROUP 1 RATE EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260040 Highway |
| Ballard + 29 more | POWER EQUIPMENT OPERATOR GROUP 3 ALL OFF ROAD MATERIAL HANDLING EQUIPMENT, INCLUDING ARTICULATING DUMP TRUCKS; GREASER ON GREASE FACILITIES SERVICING HEAVY EQUIPMENT CRANES - WITH BOOMS 150 FT. & OVER (INCLUDING JIB), AND WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING EQUALS OR EXCEEDS 150 FT. - $1.00 ABOVE GROUP 1 RATE EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260040 Highway |
| Ballard + 29 more | POWER EQUIPMENT OPERATOR GROUP 4 BITUMINOUS DISTRIBUTOR; BURLAP & CURING MACHINE; CEMENT GUN; CONCRETE SAW; CONVEYOR; DECKHAND OILER; GROUT PUMP; HYDRAULIC POST DRIVER; HYDRO SEEDER; MUD JACK; OILER; PAVING JOINT MACHINE; POWER FORM HANDLING EQUIPMENT; PUMP; ROLLER (EARTH); STEERMAN; TAMPING MACHINE; TRACTOR (UNDER 50 H.P.); & VIBRATOR CRANES - WITH BOOMS 150 FT. & OVER (INCLUDING JIB), AND WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING EQUALS OR EXCEEDS 150 FT. - $1.00 ABOVE GROUP 1 RATE EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260040 Highway |
| Bell | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.56 | $11.05 | $34.61 | KY20260019 Building |
| Bell | OPERATOR: BULLDOZER | $25.36 | $13.00 | $38.36 | KY20260019 Building |
| Bell | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260019 Building |
| Bell | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260019 Building |
| Bell | POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 | KY20260019 Building |
| Bell | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 | KY20260019 Building |
| Bell | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260019 Building |
| Bell + 18 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.97 | $10.25 | $36.22 | KY20260060 Heavy |
| Bell + 18 more | OPERATOR: LOADER | $30.35 | $0.00 | $30.35 | KY20260060 Heavy |
| Bell + 18 more | POWER EQUIPMENT OPERATOR GROUP 1 BULLDOZER; CRANE; DRILL; GRADER/BLADE; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260060 Heavy |
| Bell + 18 more | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260060 Heavy |
| Bell + 18 more | POWER EQUIPMENT OPERATOR GROUP 4 OILER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260060 Heavy |
| Boone | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.66 | $10.81 | $35.47 | KY20260044 Building |
| Boone | OPERATOR: BULLDOZER | $19.69 | $4.71 | $24.40 | KY20260044 Building |
| Boone | OPERATOR: BULLDOZER | $29.37 | $11.16 | $40.53 | KY20260062 Heavy |
| Boone | OPERATOR: LOADER | $26.68 | $13.00 | $39.68 | KY20260062 Heavy |
| Boone | OPERATOR: MECHANIC | $29.74 | $11.16 | $40.90 | KY20260062 Heavy |
| Boone | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260062 Heavy |
| Boone | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260044 Building |
| Boone | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260044 Building |
| Boone | OPERATOR: TRENCHER | $26.27 | $12.37 | $38.64 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260044 Building |
| Boone | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260044 Building |
| Boone | POWER EQUIPMENT OPERATOR GROUP 1 Crane Forklift | $41.55 | $19.60 | $61.15 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR GROUP 1 Drill Pumpcrete Roller | $41.55 | $19.60 | $61.15 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR GROUP 1 Drill; Pumpcrete; Roller (Bituminous) | $41.55 | $19.60 | $61.15 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR GROUP 1 DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR GROUP 1 DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; ROLLER (ROCK) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR GROUP 4 PUMP; ROLLER (EARTH) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.14 | $16.41 | $60.55 | KY20260062 Heavy |
| Boone | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 | KY20260044 Building |
| Boone | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260044 Building |
| Boone | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260044 Building |
| Boone + 3 more | POWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR ON STEEL ERECTION; BARRIER MOVING MACHINE; BOILER OPERATOR ON COMPRESSOR OR GENERATOR WHEN MOUNTED ON A RIG; CABLEWAY; COMBINATION CONCRETE MIXER & TOWER; CONCRETE PLANT (OVER 4 YD. CAPACITY); CONCRETE PUMP; CRANE (ALL TYPES, INCLUDING BOOM TRUCK, CHERRY PICKER); CRANE-COMPACT, TRACK OR RUBBER OVER 4,000 LBS. CAPACITY; CRANES-SELF ERECTING, STATIONARY, TRACK OR TRUCK (ALL CONFIGURATIONS); DERRICK; DRAGLINE; DREDGE (DIPPER, CLAM OR SUCTION); ELEVATING GRADER OR EUCLID LOADER; FLOATING EQUIPMENT (ALL TYPES); GRADALL; HELICOPTER CREW (OPERATOR-HOIST OR WINCH); HOE (ALL TYPES); HOISTING ENGINE ON SHAFT OR TUNNEL WORK; HYDRAULIC GANTRY (LIFTING SYSTEM); INDUSTRIAL-TYPE TRACTOR; JET ENGINE DRYER (D8 OR D9) DIESEL TRACTOR; LOCOMOTIVE (STANDARD GAUGE); MAINTENANCE OPERATOR CLASS A; MIXER, PAVING (SINGLE OR DOUBLE DRUM); MUCKING MACHINE; MULTIPLE SCRAPER; PILEDRIVING MACHINE (ALL TYPES); POWER SHOVEL; PRENTICE LOADER; QUAD 9 (DOUBLE PUSHER); RAIL TAMPER (WITH AUTO LIFTING & ALIGNING DEVICE); REFRIGERATING MACHINE (FREEZER OPERATION); ROTARY DRILL, ON CAISSON WORK; ROUGH TERRAIN FORK LIFT WITH WINCH/HOIST; SIDE-BOOM; SLIP-FORM PAVER; TOWER DERRICK; TREE SHREDDER; TRENCH MACHINE (OVER 24" WIDE); TRUCK MOUNTED CONCRETE PUMP; TUG BOAT; TUNNEL MACHINE AND/OR MINING MACHINE; & WHEEL EXCAVATOR | $44.14 | $16.41 | $60.55 | KY20260039 Highway |
| Boone + 3 more | POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT PAVER; AUTOMATIC SUBGRADER MACHINE, SELF-PROPELLED (CMI TYPE); BOBCAT TYPE AND/OR SKID STEER LOADER WITH HOE ATTACHMENT GREATER THAN 7,000 LBS.; BORING MACHINE MORE THAN 48"; BULLDOZER; ENDLOADER; HYDRO MILLING MACHINE; HORIZONTAL DIRECTIONAL DRILL (OVER 500,000 FT. LBS. THRUST); KOLMAN-TYPE LOADER (PRODUCTION TYPE-DIRT); LEAD GREASEMAN; LIGHTING & TRAFFIC SIGNAL INSTALLATION EQUIPMENT (INCLUDES ALL GROUPS OR CLASSIFICATIONS); MATERIAL TRANSFER EQUIPMENT (SHUTTLE BUGGY) ASPHALT; PETTIBONE-RAIL EQUIPMENT; POWER GRADER; POWER SCRAPER; PUSH CAT; ROTOMILL (ALL), GRINDERS & PLANERS OF ALL TYPES; TRENCH MACHINE (24" WIDE & UNDER); & VERMEER TYPE CONCRETE SAW | $44.02 | $16.41 | $60.43 | KY20260039 Highway |
| Boone + 3 more | POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME; AIR COMPRESSOR ON TUNNEL WORK (LOW PRESSURE); ASPHALT PLANT ENGINEER; BOBCAT-TYPE AND/OR SKID STEER LOADER WITH OR WITHOUT ATTACHMENTS; HIGHWAY DRILLS (ALL TYPES); LOCOMOTIVE (NARROW GAUGE); MATERIAL HOIST/ELEVATOR; MIXER, CONCRETE (MORE THAN ONE BAG CAPACITY); MIXER, ONE BAG CAPACITY (SIDE LOADER); POWER BOILER (OVER 15 LBS. PRESSURE) PUMP OPERATOR INSTALLING & OPERATING WELL POINTS; PUMP (4" & OVER DISCHARGE); ROLLER, ASPHALT; ROTOVATOR (LIME SOIL STABILIZER); SWITCH & TIE TAMPERS (WITHOUT LIFTING & ALIGNING DEVICE); UTILITY OPERATOR (SMALL EQUIPMENT); & WELDING MACHINES | $42.98 | $16.41 | $59.39 | KY20260039 Highway |
| Boone + 3 more | POWER EQUIPMENT OPERATOR GROUP 4 BACKFILLER; BALLAST RE-LOCATOR; BARS, JOINT & MESH INSTALLING MACHINE; BATCH PLANT; BORING MACHINE OPERATOR (48" OR LESS); BULL FLOATS; BURLAP & CURING MACHINE; CONCRETE PLANT (CAPACITY 4 YD. & UNDER); CONCRETE SAW (MULTIPLE); CONVEYOR (HIGHWAY); CRUSHER; DECKHAND; FARM-TYPE TRACTOR WITH ATTACHMENTS (HIGHWAY) EXCEPT MASONRY); FINISHING MACHINE; FIREPERSON, FLOATING EQUIPMENT (ALL TYPES); FORK LIFT (HIGHWAY); FORM TRENCHER; HYDRO HAMMER; HYDRO SEEDER; PAVEMENT BREAKER; PLANT MIXER; POST DRIVER; POST HOLE DIGGER (POWER AUGER); POWER BRUSH BURNER; POWER FORM HANDLING EQUIPMENT; ROAD WIDENING TRENCHER; ROLLER (BRICK, GRADE & MACADAM); SELF-PROPELLED POWER SPREADER; SELF-PROPELLED POWER SUBGRADER; STEAM FIREPERSON; TRACTOR (PULLING SHEEPFOOT, ROLLER OR GRADER); & VIBRATORY COMPACTOR WITH INTEGRAL POWER | $41.80 | $16.41 | $58.21 | KY20260039 Highway |
| Boone + 3 more | POWER EQUIPMENT OPERATOR GROUP 5 COMPRESSOR (PORTABLE, SEWER, HEAVY & HIGHWAY); DRUM FIREPERSON (ASPHALT); GENERATOR; MASONRY FORK LIFT; INBOARD-OUTBOARD MOTOR BOAT LAUNCH; MASONRY FORK LIFT; OIL HEATER (ASPHALT PLANT); OILER; POWER DRIVEN HEATER; POWER SWEEPER & SCRUBBER; PUMP (UNDER 4" DISCHARGE); SIGNALPERSON; TIRE REPAIRPERSON; & VAC/ALLS | $36.34 | $16.41 | $52.75 | KY20260039 Highway |
| Boone + 3 more | POWER EQUIPMENT OPERATOR GROUP 6 MASTER MECHANIC & BOOM FROM 150 TO 180 | $45.14 | $16.41 | $61.55 | KY20260039 Highway |
| Boone + 3 more | POWER EQUIPMENT OPERATOR GROUP 7 BOOM FROM 180 AND OVER | $45.14 | $16.41 | $61.55 | KY20260039 Highway |
| Boone + 6 more | OPERATOR: BACKHOE | $21.50 | $1.79 | $23.29 | KY20260009 Residential |
| Boone + 6 more | OPERATOR: BULLDOZER | $21.50 | $1.79 | $23.29 | KY20260009 Residential |
| Boone + 6 more | OPERATOR: ROLLER | $21.50 | $1.79 | $23.29 | KY20260009 Residential |
| Boone + 6 more | POWER EQUIPMENT OPERATOR: CABLE CRANE (50 TONS AND OVER); HYDRAULIC CRANE (100 TONS AND OVER) (BRACKEN AND GRANT COUNTIES) CRANES WITH BOOM 150 FEET AND OVER INCLUDING JIB SHALL RECEIVE $ .50 ABOVE RATE CRANES WITH CCO REQUIRED SHALL RECEIVE $.10 ABOVE RATE | $36.25 | $17.85 | $54.10 | KY20260009 Residential |
| Boone + 6 more | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANE (FRENCH, GERMAN AND OTHER TYPES) (BRACKEN AND GRANT COUNTIES) CRANES WITH BOOM 150 FEET AND OVER INCLUDING JIB SHALL RECEIVE $ .50 ABOVE RATE CRANES WITH CCO REQUIRED SHALL RECEIVE $.10 ABOVE RATE | $35.34 | $17.85 | $53.19 | KY20260009 Residential |
| Boone + 6 more | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANES (FRENCH, GERMAN AND OTHER TYPES) (GALLATIN COUNTY) CRANE WITH BOOM 150 FEET & OVER, INCLUDING JIB SHALL RECEIVE $.75 ABOVE RATE ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE GROUP 1 REGARDLESS OF BOOM LENGTH | $33.90 | $17.85 | $51.75 | KY20260009 Residential |
| Boone + 6 more | POWER EQUIPMENT OPERATOR: CRANE (ALL TYPES) (BOONE, CAMPBELL, KENTON AND PENDLETON COUNTIES) | $44.14 | $16.41 | $60.55 | KY20260009 Residential |
| Bourbon + 3 more | OPERATOR: BACKHOE | $21.50 | $1.79 | $23.29 | KY20260010 Residential |
| Bourbon + 3 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.05 | $12.65 | $37.70 | KY20260100 Building |
| Bourbon + 3 more | OPERATOR: BULLDOZER | $21.50 | $1.79 | $23.29 | KY20260010 Residential |
| Bourbon + 3 more | OPERATOR: BULLDOZER | $19.69 | $4.71 | $24.40 | KY20260100 Building |
| Bourbon + 3 more | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260100 Building |
| Bourbon + 3 more | OPERATOR: ROLLER | $21.50 | $1.79 | $23.29 | KY20260010 Residential |
| Bourbon + 3 more | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260100 Building |
| Bourbon + 3 more | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260100 Building |
| Bourbon + 3 more | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260100 Building |
| Bourbon + 3 more | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANES (FRENCH, GERMAN AND OTHER TYPES) CRANE WITH BOOM 150 FEET & OVER, INCLUDING JIB SHALL RECEIVE $.75 ABOVE RATE ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE RATE REGARDLESS OF BOOM LENGTH | $33.90 | $17.85 | $51.75 | KY20260010 Residential |
| Bourbon + 3 more | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260100 Building |
| Bourbon + 3 more | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260100 Building |
| Bourbon + 3 more | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260100 Building |
| Bourbon + 5 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.56 | $12.10 | $34.66 | KY20260082 Heavy |
| Bourbon + 5 more | OPERATOR: BULLDOZER | $27.90 | $13.00 | $40.90 | KY20260082 Heavy |
| Bourbon + 5 more | OPERATOR: LOADER | $26.68 | $13.00 | $39.68 | KY20260082 Heavy |
| Bourbon + 5 more | OPERATOR: MECHANIC | $28.60 | $11.83 | $40.43 | KY20260082 Heavy |
| Bourbon + 5 more | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260082 Heavy |
| Bourbon + 5 more | OPERATOR: TRENCHER | $26.27 | $12.37 | $38.64 | KY20260082 Heavy |
| Bourbon + 5 more | POWER EQUIPMENT OPERATOR GROUP 1 Crane Forklift | $41.55 | $19.60 | $61.15 | KY20260082 Heavy |
| Bourbon + 5 more | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260082 Heavy |
| Bourbon + 5 more | POWER EQUIPMENT OPERATOR GROUP 1 Drill; Pumpcrete; Roller (Bituminous) | $41.55 | $19.60 | $61.15 | KY20260082 Heavy |
| Bourbon + 5 more | POWER EQUIPMENT OPERATOR GROUP 1 DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260082 Heavy |
| Bourbon + 5 more | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; ROLLER (ROCK) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260082 Heavy |
| Bourbon + 5 more | POWER EQUIPMENT OPERATOR GROUP 4 PUMP; ROLLER (EARTH) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260082 Heavy |
| Boyd, Greenup | OPERATOR: BACKHOE | $21.50 | $1.79 | $23.29 | KY20260011 Residential |
| Boyd, Greenup | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.66 | $10.81 | $35.47 | KY20260101 Building |
| Boyd, Greenup | OPERATOR: BULLDOZER | $21.50 | $1.79 | $23.29 | KY20260011 Residential |
| Boyd, Greenup | OPERATOR: BULLDOZER | $19.69 | $4.71 | $24.40 | KY20260101 Building |
| Boyd, Greenup | OPERATOR: LOADER | $26.68 | $13.00 | $39.68 | KY20260083 Heavy |
| Boyd, Greenup | OPERATOR: MECHANIC | $28.60 | $11.83 | $40.43 | KY20260083 Heavy |
| Boyd, Greenup | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260083 Heavy |
| Boyd, Greenup | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260101 Building |
| Boyd, Greenup | OPERATOR: ROLLER | $21.50 | $1.79 | $23.29 | KY20260011 Residential |
| Boyd, Greenup | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260101 Building |
| Boyd, Greenup | OPERATOR: TRENCHER | $26.27 | $12.37 | $38.64 | KY20260083 Heavy |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260101 Building |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260101 Building |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR GROUP 1 Backhoe/Excavator/Trackhoe; Bulldozer; Drill; Pumpcrete; Roller (Bituminous) | $41.55 | $19.60 | $61.15 | KY20260083 Heavy |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260083 Heavy |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR GROUP 1 Crane Forklift | $41.55 | $19.60 | $61.15 | KY20260083 Heavy |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260083 Heavy |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; ROLLER (ROCK) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260083 Heavy |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR GROUP 4 PUMP; ROLLER (EARTH) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260083 Heavy |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR: CABLE CRANE (50 TONS AND OVER); HYDRAULIC CRANE (100 TONS AND OVER) CRANES WITH BOOM 150 FEET AND OVER INCLUDING JIB SHALL RECEIVE $ .50 ABOVE GROUPS 1 AND 2 CRANES WITH CCO REQUIRED SHALL RECEIVE $.10 ABOVE | $36.25 | $17.85 | $54.10 | KY20260011 Residential |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANE (FRENCH, GERMAN AND OTHER TYPES) CRANES WITH BOOM 150 FEET AND OVER INCLUDING JIB SHALL RECEIVE $ .50 ABOVE GROUPS 1 AND 2 CRANES WITH CCO REQUIRED SHALL RECEIVE $.10 ABOVE | $35.34 | $17.85 | $53.19 | KY20260011 Residential |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 | KY20260101 Building |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260101 Building |
| Boyd, Greenup | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260101 Building |
| Bracken | OPERATOR: LOADER | $26.68 | $13.00 | $39.68 | KY20260063 Heavy |
| Bracken | OPERATOR: MECHANIC | $28.60 | $11.83 | $40.43 | KY20260063 Heavy |
| Bracken | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260063 Heavy |
| Bracken | OPERATOR: TRENCHER | $26.27 | $12.37 | $38.64 | KY20260063 Heavy |
| Bracken | POWER EQUIPMENT OPERATOR GROUP 1 Backhoe/Excavator/Trackhoe; Bulldozer; Drill; Pumpcrete; Roller (Bituminous) | $41.55 | $19.60 | $61.15 | KY20260063 Heavy |
| Bracken | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260063 Heavy |
| Bracken | POWER EQUIPMENT OPERATOR GROUP 1 Crane Forklift | $41.55 | $19.60 | $61.15 | KY20260063 Heavy |
| Bracken | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260063 Heavy |
| Bracken | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; ROLLER (ROCK) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260063 Heavy |
| Bracken | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260063 Heavy |
| Bracken | POWER EQUIPMENT OPERATOR GROUP 4 PUMP; ROLLER (EARTH) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260063 Heavy |
| Bracken + 3 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.66 | $10.81 | $35.47 | KY20260102 Building |
| Bracken + 3 more | OPERATOR: BULLDOZER | $19.69 | $4.71 | $24.40 | KY20260102 Building |
| Bracken + 3 more | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260102 Building |
| Bracken + 3 more | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260102 Building |
| Bracken + 3 more | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260102 Building |
| Bracken + 3 more | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260102 Building |
| Bracken + 3 more | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 | KY20260102 Building |
| Bracken + 3 more | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260102 Building |
| Bracken + 3 more | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260102 Building |
| Breathitt + 16 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.56 | $11.05 | $34.61 | KY20260043 Building |
| Breathitt + 16 more | OPERATOR: BULLDOZER | $25.36 | $13.00 | $38.36 | KY20260043 Building |
| Breathitt + 16 more | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260043 Building |
| Breathitt + 16 more | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260043 Building |
| Breathitt + 16 more | POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 | KY20260043 Building |
| Breathitt + 16 more | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 | KY20260043 Building |
| Breathitt + 16 more | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260043 Building |
| Bullitt | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.48 | $13.00 | $40.48 | KY20260064 Heavy |
| Bullitt | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.27 | $3.72 | $25.99 | KY20260087 Building |
| Bullitt | OPERATOR: BULLDOZER | $24.73 | $15.19 | $39.92 | KY20260064 Heavy |
| Bullitt | OPERATOR: BULLDOZER | $21.49 | $3.84 | $25.33 | KY20260087 Building |
| Bullitt | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260064 Heavy |
| Bullitt | OPERATOR: LOADER | $26.50 | $13.00 | $39.50 | KY20260064 Heavy |
| Bullitt | OPERATOR: MECHANIC | $25.81 | $13.00 | $38.81 | KY20260064 Heavy |
| Bullitt | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260087 Building |
| Bullitt | OPERATOR: ROLLER | $23.39 | $13.00 | $36.39 | KY20260064 Heavy |
| Bullitt | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260087 Building |
| Bullitt | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260064 Heavy |
| Bullitt | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260087 Building |
| Bullitt | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260087 Building |
| Bullitt | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260064 Heavy |
| Bullitt | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260064 Heavy |
| Bullitt | POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260064 Heavy |
| Bullitt | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260087 Building |
| Bullitt | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260087 Building |
| Bullitt | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260087 Building |
| Bullitt + 8 more | OPERATOR: BACKHOE | $21.50 | $1.79 | $23.29 | KY20260012 Residential |
| Bullitt + 8 more | OPERATOR: BULLDOZER | $21.50 | $1.79 | $23.29 | KY20260012 Residential |
| Bullitt + 8 more | OPERATOR: ROLLER | $20.41 | $5.72 | $26.13 | KY20260012 Residential |
| Bullitt + 8 more | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANES (FRENCH, GERMAN AND OTHER TYPES) CRANE WITH BOOM 150 FEET & OVER, INCLUDING JIB SHALL RECEIVE $.75 ABOVE RATE ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE RATE REGARDLESS OF BOOM LENGTH | $33.90 | $17.85 | $51.75 | KY20260012 Residential |
| Calloway | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.30 | $10.73 | $38.03 | KY20260020 Building |
| Calloway | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260020 Building |
| Calloway | OPERATOR: BORING MACHINE | $25.35 | $13.00 | $38.35 | KY20260046 Heavy |
| Calloway | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260020 Building |
| Calloway | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260020 Building |
| Calloway | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260020 Building |
| Calloway | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE; DRILL; GRADER/BLADE; LOADER; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260046 Heavy |
| Calloway | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT; TRACTOR (50 H.P. OR OVER) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260046 Heavy |
| Calloway | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260046 Heavy |
| Calloway | POWER EQUIPMENT OPERATOR GROUP 4 OILER; TRACTOR (UNDER 50 H.P.) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260046 Heavy |
| Calloway | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $1.00 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $1.00 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260020 Building |
| Calloway | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260020 Building |
| Campbell | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.66 | $10.81 | $35.47 | KY20260088 Building |
| Campbell | OPERATOR: BULLDOZER | $28.04 | $13.00 | $41.04 | KY20260065 Heavy |
| Campbell | OPERATOR: BULLDOZER | $19.69 | $4.71 | $24.40 | KY20260088 Building |
| Campbell | OPERATOR: LOADER | $26.68 | $13.00 | $39.68 | KY20260065 Heavy |
| Campbell | OPERATOR: MECHANIC | $28.60 | $11.83 | $40.43 | KY20260065 Heavy |
| Campbell | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260065 Heavy |
| Campbell | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260088 Building |
| Campbell | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260088 Building |
| Campbell | OPERATOR: TRENCHER | $26.27 | $12.37 | $38.64 | KY20260065 Heavy |
| Campbell | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260088 Building |
| Campbell | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260088 Building |
| Campbell | POWER EQUIPMENT OPERATOR GROUP 1 Crane Forklift | $41.55 | $19.60 | $61.15 | KY20260065 Heavy |
| Campbell | POWER EQUIPMENT OPERATOR GROUP 1 Crane; Forklift Operators on cranes with boom 150 feet and over, including jib, shall receive $0.75 above Group 1. All cranes with piling leads will receive $0.50 above Group 1 rate regardless of boom length. Combination rate shall mean $0.50 per hour above the basic hourly rate of pay | $41.55 | $19.60 | $61.15 | KY20260065 Heavy |
| Campbell | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260065 Heavy |
| Campbell | POWER EQUIPMENT OPERATOR GROUP 1 Drill Pumpcrete Roller | $41.55 | $19.60 | $61.15 | KY20260065 Heavy |
| Campbell | POWER EQUIPMENT OPERATOR GROUP 1 Drill; Pumpcrete; Roller (Bituminous) | $41.55 | $19.60 | $61.15 | KY20260065 Heavy |
| Campbell | POWER EQUIPMENT OPERATOR GROUP 1 DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260065 Heavy |
| Campbell | POWER EQUIPMENT OPERATOR GROUP 2 Bobcat/Skid Steer/Skid Loader; Concrete Pump; Roller (Rock) | $38.69 | $19.60 | $58.29 | KY20260065 Heavy |
| Campbell | POWER EQUIPMENT OPERATOR GROUP 3 Articulating Truck Operator | $39.14 | $19.60 | $58.74 | KY20260065 Heavy |
| Campbell | POWER EQUIPMENT OPERATOR GROUP 4 Pump; Roller (Earth) | $38.37 | $19.60 | $57.97 | KY20260065 Heavy |
| Campbell | POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.14 | $16.41 | $60.55 | KY20260065 Heavy |
| Campbell | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 | KY20260088 Building |
| Campbell | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260088 Building |
| Campbell | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260088 Building |
| Carlisle + 11 more | OPERATOR: BORING MACHINE | $25.35 | $13.00 | $38.35 | KY20260061 Heavy |
| Carlisle + 11 more | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE; DRILL; GRADER/BLADE; LOADER; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260061 Heavy |
| Carlisle + 11 more | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT; TRACTOR (50 H.P. OR OVER) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260061 Heavy |
| Carlisle + 11 more | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260061 Heavy |
| Carlisle + 11 more | POWER EQUIPMENT OPERATOR GROUP 4 OILER; TRACTOR (UNDER 50 H.P.) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260061 Heavy |
| Carroll | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.55 | $10.61 | $35.16 | KY20260021 Building |
| Carroll | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260021 Building |
| Carroll | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260021 Building |
| Carroll | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260021 Building |
| Carroll | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260021 Building |
| Carroll | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260021 Building |
| Carroll | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260021 Building |
| Carter | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.08 | $13.00 | $38.08 | KY20260022 Building |
| Carter | OPERATOR: BULLDOZER | $25.36 | $13.00 | $38.36 | KY20260022 Building |
| Carter | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260022 Building |
| Carter | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260022 Building |
| Carter | POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 | KY20260022 Building |
| Carter | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 | KY20260022 Building |
| Carter | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260022 Building |
| Christian | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.76 | $13.00 | $36.76 | KY20260066 Heavy |
| Christian | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.01 | $7.59 | $35.60 | KY20260089 Building |
| Christian | OPERATOR: BULLDOZER | $23.14 | $15.51 | $38.65 | KY20260066 Heavy |
| Christian | OPERATOR: BULLDOZER | $24.51 | $12.72 | $37.23 | KY20260089 Building |
| Christian | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260066 Heavy |
| Christian | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260066 Heavy |
| Christian | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260089 Building |
| Christian | OPERATOR: ROLLER | $20.21 | $13.00 | $33.21 | KY20260066 Heavy |
| Christian | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260089 Building |
| Christian | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260066 Heavy |
| Christian | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260089 Building |
| Christian | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260089 Building |
| Christian | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; LOADER; MECHANIC; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260066 Heavy |
| Christian | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260066 Heavy |
| Christian | POWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260066 Heavy |
| Christian | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260089 Building |
| Christian | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260089 Building |
| Christian | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260089 Building |
| Christian, Trigg | OPERATOR: BACKHOE | $21.50 | $1.79 | $23.29 | KY20260013 Residential |
| Christian, Trigg | OPERATOR: BULLDOZER | $21.50 | $1.79 | $23.29 | KY20260013 Residential |
| Christian, Trigg | OPERATOR: ROLLER | $21.50 | $1.79 | $23.29 | KY20260013 Residential |
| Christian, Trigg | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANE (FRENCH, GERMAN AND OTHER TYPES) CRANE WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.00 ABOVE RATE; 225 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE RATE. CRANE USING PILING LEADS SHALL RECEIVE $1.00 ABOVE RATE, REGARDLESS OF BOOM LENGTH EQUIPMENT $1.00 PREMIUM LEVEL B PERSONAL PROTECTIVE EQUIPMENT $ .75 PREMIUM LEVEL C PERSONAL PROTECTIVE EQUIPMENT $ .50 PREMIUM LEVEL D PERSONAL PROTECTIVE EQUIPMENT - NO PREMIUM | $34.43 | $17.85 | $52.28 | KY20260013 Residential |
| Clark | OPERATOR: BACKHOE | $21.50 | $1.79 | $23.29 | KY20260007 Residential |
| Clark | OPERATOR: BULLDOZER | $21.50 | $1.79 | $23.29 | KY20260007 Residential |
| Clark | OPERATOR: ROLLER | $21.50 | $1.79 | $23.29 | KY20260007 Residential |
| Clark | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANE (FRENCH, GERMAN AND OTHER TYPES) CRANE WITH BOOM 150 FEET & OVER, INCLUDING JIB SHALL RECEIVE $.50 ABOVE RATE ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE RATE REGARDLESS OF BOOM LENGTH | $34.60 | $17.85 | $52.45 | KY20260007 Residential |
| Daviess | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.27 | $13.00 | $40.27 | KY20260067 Heavy |
| Daviess | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260067 Heavy |
| Daviess | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260067 Heavy |
| Daviess | OPERATOR: ROLLER | $20.21 | $13.00 | $33.21 | KY20260067 Heavy |
| Daviess | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260067 Heavy |
| Daviess | POWER EQUIPMENT OPERATOR GROUP 1 BULLDOZER; CRANE; DRILL; LOADER; MECHANIC; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260067 Heavy |
| Daviess | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; COMPRESSOR; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260067 Heavy |
| Daviess | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260067 Heavy |
| Daviess | POWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260067 Heavy |
| Daviess, Hancock, McLean | OPERATOR: BACKHOE | $21.50 | $1.79 | $23.29 | KY20260014 Residential |
| Daviess, Hancock, McLean | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.38 | $9.10 | $36.48 | KY20260103 Building |
| Daviess, Hancock, McLean | OPERATOR: BULLDOZER | $21.50 | $1.79 | $23.29 | KY20260014 Residential |
| Daviess, Hancock, McLean | OPERATOR: BULLDOZER | $24.51 | $12.72 | $37.23 | KY20260103 Building |
| Daviess, Hancock, McLean | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260103 Building |
| Daviess, Hancock, McLean | OPERATOR: ROLLER | $21.50 | $1.79 | $23.29 | KY20260014 Residential |
| Daviess, Hancock, McLean | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260103 Building |
| Daviess, Hancock, McLean | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260103 Building |
| Daviess, Hancock, McLean | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260103 Building |
| Daviess, Hancock, McLean | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANE (FRENCH, GERMAN AND OTHER TYPES) (DAVIESS AND MCLEAN COUNTIES) CRANE WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.00 ABOVE RATE; 225 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE RATE. CRANE USING PILING LEADS SHALL RECEIVE $1.00 ABOVE RATE, REGARDLESS OF BOOM LENGTH HAZARDOUS PAY: PREMIUM LEVEL B PERSONAL PROTECTIVE EQUIPMENT $ .75 PREMIUM LEVEL C PERSONAL PROTECTIVE EQUIPMENT $ .50 PREMIUM LEVEL D PERSONAL PROTECTIVE EQUIPMENT - NO PREMIUM | $34.43 | $17.85 | $52.28 | KY20260014 Residential |
| Daviess, Hancock, McLean | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANES (FRENCH, GERMAN AND OTHER TYPES) (HANCOCK COUNTY) CRANE WITH BOOM 150 FEET & OVER, INCLUDING JIB SHALL RECEIVE $.75 ABOVE RATE ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE RATE REGARDLESS OF BOOM LENGTH | $33.90 | $17.85 | $51.75 | KY20260014 Residential |
| Daviess, Hancock, McLean | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260103 Building |
| Daviess, Hancock, McLean | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260103 Building |
| Daviess, Hancock, McLean | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260103 Building |
| Edmonson | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.60 | $12.65 | $36.25 | KY20260068 Heavy |
| Edmonson | OPERATOR: BULLDOZER | $23.60 | $12.65 | $36.25 | KY20260068 Heavy |
| Edmonson | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260068 Heavy |
| Edmonson | OPERATOR: MECHANIC | $22.43 | $11.75 | $34.18 | KY20260068 Heavy |
| Edmonson | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260068 Heavy |
| Edmonson | OPERATOR: ROLLER | $20.21 | $13.00 | $33.21 | KY20260068 Heavy |
| Edmonson | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260068 Heavy |
| Edmonson | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; LOADER; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260068 Heavy |
| Edmonson | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260068 Heavy |
| Edmonson | POWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260068 Heavy |
| Edmonson, Warren | OPERATOR: BACKHOE | $21.50 | $1.79 | $23.29 | KY20260015 Residential |
| Edmonson, Warren | OPERATOR: BULLDOZER | $21.50 | $1.79 | $23.29 | KY20260015 Residential |
| Edmonson, Warren | OPERATOR: ROLLER | $21.50 | $1.79 | $23.29 | KY20260015 Residential |
| Edmonson, Warren | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANES (FRENCH, GERMAN AND OTHER TYPES) CRANE WITH BOOM 150 FEET & OVER, INCLUDING JIB SHALL RECEIVE $.75 ABOVE RATE ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE RATE REGARDLESS OF BOOM LENGTH | $33.90 | $17.85 | $51.75 | KY20260015 Residential |
| Fayette | OPERATOR: BACKHOE | $21.50 | $1.79 | $23.29 | KY20260008 Residential |
| Fayette | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.60 | $12.65 | $37.25 | KY20260090 Building |
| Fayette | OPERATOR: BULLDOZER | $21.50 | $1.79 | $23.29 | KY20260008 Residential |
| Fayette | OPERATOR: BULLDOZER | $19.69 | $4.71 | $24.40 | KY20260090 Building |
| Fayette | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260090 Building |
| Fayette | OPERATOR: ROLLER | $21.50 | $1.79 | $23.29 | KY20260008 Residential |
| Fayette | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260090 Building |
| Fayette | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260090 Building |
| Fayette | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260090 Building |
| Fayette | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANE (FRENCH, GERMAN AND OTHER TYPES) CRANE WITH BOOM 150 FEET & OVER, INCLUDING JIB SHALL RECEIVE $.50 ABOVE RATE ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE RATE REGARDLESS OF BOOM LENGTH | $34.60 | $17.85 | $52.45 | KY20260008 Residential |
| Fayette | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260090 Building |
| Fayette | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260090 Building |
| Fayette | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260090 Building |
| Franklin | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.55 | $10.61 | $35.16 | KY20260023 Building |
| Franklin | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.42 | $12.70 | $39.12 | KY20260047 Heavy |
| Franklin | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260023 Building |
| Franklin | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260023 Building |
| Franklin | OPERATOR: BULLDOZER | $29.96 | $13.00 | $42.96 | KY20260047 Heavy |
| Franklin | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260023 Building |
| Franklin | OPERATOR: LOADER | $25.35 | $13.00 | $38.35 | KY20260047 Heavy |
| Franklin | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260023 Building |
| Franklin | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; GRADER/BLADE; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $9.50 | $51.05 | KY20260047 Heavy |
| Franklin | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $9.50 | $48.19 | KY20260047 Heavy |
| Franklin | POWER EQUIPMENT OPERATOR GROUP 4 OILER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $9.50 | $47.87 | KY20260047 Heavy |
| Franklin | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260023 Building |
| Franklin | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260023 Building |
| Gallatin, Grant, Pendleton | OPERATOR: BULLDOZER | $28.04 | $13.00 | $41.04 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | OPERATOR: LOADER | $26.68 | $13.00 | $39.68 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | OPERATOR: MECHANIC | $28.60 | $11.83 | $40.43 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | OPERATOR: TRENCHER | $26.27 | $12.37 | $38.64 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | POWER EQUIPMENT OPERATOR GROUP 1 Crane Forklift | $41.55 | $19.60 | $61.15 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | POWER EQUIPMENT OPERATOR GROUP 1 Drill Pumpcrete Roller | $41.55 | $19.60 | $61.15 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | POWER EQUIPMENT OPERATOR GROUP 1 Drill; Pumpcrete; Roller (Bituminous) | $41.55 | $19.60 | $61.15 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | POWER EQUIPMENT OPERATOR GROUP 1 DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | POWER EQUIPMENT OPERATOR GROUP 1 DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; ROLLER (ROCK) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | POWER EQUIPMENT OPERATOR GROUP 4 PUMP; ROLLER (EARTH) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260084 Heavy |
| Gallatin, Grant, Pendleton | POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.14 | $16.41 | $60.55 | KY20260084 Heavy |
| Graves | OPERATOR: BORING MACHINE | $25.35 | $13.00 | $38.35 | KY20260048 Heavy |
| Graves | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE; DRILL; GRADER/BLADE; LOADER; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260048 Heavy |
| Graves | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT; TRACTOR (50 H.P. OR OVER) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260048 Heavy |
| Graves | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260048 Heavy |
| Graves | POWER EQUIPMENT OPERATOR GROUP 4 OILER; TRACTOR (UNDER 50 H.P.) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260048 Heavy |
| Hancock | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.00 | $1.93 | $37.93 | KY20260069 Heavy |
| Hancock | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260069 Heavy |
| Hancock | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260069 Heavy |
| Hancock | OPERATOR: ROLLER | $20.21 | $13.00 | $33.21 | KY20260069 Heavy |
| Hancock | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260069 Heavy |
| Hancock | POWER EQUIPMENT OPERATOR GROUP 1 BULLDOZER; CRANE; DRILL; LOADER; MECHANIC; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260069 Heavy |
| Hancock | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; COMPRESSOR; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260069 Heavy |
| Hancock | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260069 Heavy |
| Hancock | POWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260069 Heavy |
| Hardin | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.85 | $5.00 | $25.85 | KY20260070 Heavy |
| Hardin | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.35 | $13.00 | $37.35 | KY20260091 Building |
| Hardin | OPERATOR: BULLDOZER | $25.35 | $16.74 | $42.09 | KY20260070 Heavy |
| Hardin | OPERATOR: BULLDOZER | $21.49 | $3.84 | $25.33 | KY20260091 Building |
| Hardin | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260070 Heavy |
| Hardin | OPERATOR: LOADER | $26.50 | $13.00 | $39.50 | KY20260070 Heavy |
| Hardin | OPERATOR: MECHANIC | $25.81 | $13.00 | $38.81 | KY20260070 Heavy |
| Hardin | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260091 Building |
| Hardin | OPERATOR: ROLLER | $23.39 | $13.00 | $36.39 | KY20260070 Heavy |
| Hardin | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260091 Building |
| Hardin | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260070 Heavy |
| Hardin | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260091 Building |
| Hardin | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260091 Building |
| Hardin | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260070 Heavy |
| Hardin | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260070 Heavy |
| Hardin | POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260070 Heavy |
| Hardin | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260091 Building |
| Hardin | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260091 Building |
| Hardin | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260091 Building |
| Hardin, Larue | OPERATOR: BACKHOE | $21.50 | $1.79 | $23.29 | KY20260016 Residential |
| Hardin, Larue | OPERATOR: BULLDOZER | $21.50 | $1.79 | $23.29 | KY20260016 Residential |
| Hardin, Larue | OPERATOR: ROLLER | $20.41 | $5.72 | $26.13 | KY20260016 Residential |
| Hardin, Larue | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANES (FRENCH, GERMAN AND OTHER TYPES) CRANE WITH BOOM 150 FEET & OVER, INCLUDING JIB SHALL RECEIVE $.75 ABOVE RATE ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE RATE REGARDLESS OF BOOM LENGTH | $33.90 | $17.85 | $51.75 | KY20260016 Residential |
| Harrison | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.42 | $12.70 | $39.12 | KY20260049 Heavy |
| Harrison | OPERATOR: BULLDOZER | $29.96 | $13.00 | $42.96 | KY20260049 Heavy |
| Harrison | OPERATOR: LOADER | $25.35 | $13.00 | $38.35 | KY20260049 Heavy |
| Harrison | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; GRADER/BLADE; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $9.50 | $51.05 | KY20260049 Heavy |
| Harrison | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $9.50 | $48.19 | KY20260049 Heavy |
| Harrison | POWER EQUIPMENT OPERATOR GROUP 4 OILER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $9.50 | $47.87 | KY20260049 Heavy |
| Henderson | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.05 | $19.10 | $59.15 | KY20260071 Heavy |
| Henderson | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.40 | $9.60 | $36.00 | KY20260092 Building |
| Henderson | OPERATOR: BULLDOZER | $23.63 | $10.98 | $34.61 | KY20260071 Heavy |
| Henderson | OPERATOR: BULLDOZER | $24.51 | $12.72 | $37.23 | KY20260092 Building |
| Henderson | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260071 Heavy |
| Henderson | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260071 Heavy |
| Henderson | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260092 Building |
| Henderson | OPERATOR: ROLLER | $20.21 | $13.00 | $33.21 | KY20260071 Heavy |
| Henderson | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260092 Building |
| Henderson | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260071 Heavy |
| Henderson | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260092 Building |
| Henderson | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260092 Building |
| Henderson | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; LOADER; MECHANIC; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260071 Heavy |
| Henderson | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260071 Heavy |
| Henderson | POWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260071 Heavy |
| Henderson | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260092 Building |
| Henderson | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260092 Building |
| Henderson | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260092 Building |
| Henderson, Webster | OPERATOR: BACKHOE | $21.50 | $1.79 | $23.29 | KY20260017 Residential |
| Henderson, Webster | OPERATOR: BULLDOZER | $21.50 | $1.79 | $23.29 | KY20260017 Residential |
| Henderson, Webster | OPERATOR: ROLLER | $21.50 | $1.79 | $23.29 | KY20260017 Residential |
| Henderson, Webster | POWER EQUIPMENT OPERATOR: CRANE (ALL OTHER TYPES), TRUCK CRANE, TOWER CRANE (FRENCH, GERMAN AND OTHER TYPES) CRANE WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.00 ABOVE RATE; 225 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE RATE. CRANE USING PILING LEADS SHALL RECEIVE $1.00 ABOVE RATE, REGARDLESS OF BOOM LENGTH EQUIPMENT $1.00 PREMIUM LEVEL B PERSONAL PROTECTIVE EQUIPMENT $ .75 PREMIUM LEVEL C PERSONAL PROTECTIVE EQUIPMENT $ .50 PREMIUM LEVEL D PERSONAL PROTECTIVE EQUIPMENT - NO PREMIUM | $34.43 | $17.85 | $52.28 | KY20260017 Residential |
| Henry, Oldham | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.27 | $3.72 | $25.99 | KY20260104 Building |
| Henry, Oldham | OPERATOR: BULLDOZER | $21.49 | $3.84 | $25.33 | KY20260104 Building |
| Henry, Oldham | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260104 Building |
| Henry, Oldham | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260104 Building |
| Henry, Oldham | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260104 Building |
| Henry, Oldham | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260104 Building |
| Henry, Oldham | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260104 Building |
| Henry, Oldham | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260104 Building |
| Henry, Oldham | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260104 Building |
| Henry, Spencer, Trimble | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.43 | $13.00 | $39.43 | KY20260085 Heavy |
| Henry, Spencer, Trimble | OPERATOR: BULLDOZER | $24.73 | $15.19 | $39.92 | KY20260085 Heavy |
| Henry, Spencer, Trimble | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260085 Heavy |
| Henry, Spencer, Trimble | OPERATOR: LOADER | $26.50 | $13.00 | $39.50 | KY20260085 Heavy |
| Henry, Spencer, Trimble | OPERATOR: MECHANIC | $25.81 | $13.00 | $38.81 | KY20260085 Heavy |
| Henry, Spencer, Trimble | OPERATOR: ROLLER | $23.39 | $13.00 | $36.39 | KY20260085 Heavy |
| Henry, Spencer, Trimble | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260085 Heavy |
| Henry, Spencer, Trimble | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260085 Heavy |
| Henry, Spencer, Trimble | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260085 Heavy |
| Henry, Spencer, Trimble | POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260085 Heavy |
| Hopkins | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.30 | $10.73 | $38.03 | KY20260024 Building |
| Hopkins | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260024 Building |
| Hopkins | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260024 Building |
| Hopkins | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260024 Building |
| Hopkins | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260024 Building |
| Hopkins | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $1.00 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $1.00 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260024 Building |
| Hopkins | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260024 Building |
| Jefferson | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.76 | $13.00 | $39.76 | KY20260072 Heavy |
| Jefferson | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.27 | $3.72 | $25.99 | KY20260093 Building |
| Jefferson | OPERATOR: BULLDOZER | $24.60 | $15.64 | $40.24 | KY20260072 Heavy |
| Jefferson | OPERATOR: BULLDOZER | $21.49 | $3.84 | $25.33 | KY20260093 Building |
| Jefferson | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260072 Heavy |
| Jefferson | OPERATOR: LOADER | $26.50 | $13.00 | $39.50 | KY20260072 Heavy |
| Jefferson | OPERATOR: MECHANIC | $25.81 | $13.00 | $38.81 | KY20260072 Heavy |
| Jefferson | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260093 Building |
| Jefferson | OPERATOR: ROLLER | $23.39 | $13.00 | $36.39 | KY20260072 Heavy |
| Jefferson | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260093 Building |
| Jefferson | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260072 Heavy |
| Jefferson | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260093 Building |
| Jefferson | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260093 Building |
| Jefferson | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260072 Heavy |
| Jefferson | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260072 Heavy |
| Jefferson | POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260072 Heavy |
| Jefferson | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260093 Building |
| Jefferson | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260093 Building |
| Jefferson | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260093 Building |
| Jessamine | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.05 | $12.65 | $37.70 | KY20260094 Building |
| Jessamine | OPERATOR: BULLDOZER | $19.69 | $4.71 | $24.40 | KY20260094 Building |
| Jessamine | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260094 Building |
| Jessamine | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260094 Building |
| Jessamine | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260094 Building |
| Jessamine | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260094 Building |
| Jessamine | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260094 Building |
| Jessamine | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260094 Building |
| Jessamine | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260094 Building |
| Johnson | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.97 | $10.25 | $36.22 | KY20260050 Heavy |
| Johnson | OPERATOR: LOADER | $30.35 | $0.00 | $30.35 | KY20260050 Heavy |
| Johnson | POWER EQUIPMENT OPERATOR GROUP 1 BULLDOZER; CRANE; DRILL; GRADER/BLADE; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260050 Heavy |
| Johnson | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260050 Heavy |
| Johnson | POWER EQUIPMENT OPERATOR GROUP 4 OILER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260050 Heavy |
| Kenton | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.66 | $10.81 | $35.47 | KY20260095 Building |
| Kenton | OPERATOR: BULLDOZER | $28.04 | $13.00 | $41.04 | KY20260073 Heavy |
| Kenton | OPERATOR: BULLDOZER | $19.69 | $4.71 | $24.40 | KY20260095 Building |
| Kenton | OPERATOR: LOADER | $29.37 | $10.13 | $39.50 | KY20260073 Heavy |
| Kenton | OPERATOR: MECHANIC | $28.60 | $11.83 | $40.43 | KY20260073 Heavy |
| Kenton | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260073 Heavy |
| Kenton | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260095 Building |
| Kenton | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260095 Building |
| Kenton | OPERATOR: TRENCHER | $26.27 | $12.37 | $38.64 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260095 Building |
| Kenton | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260095 Building |
| Kenton | POWER EQUIPMENT OPERATOR GROUP 1 Crane Forklift | $41.55 | $19.60 | $61.15 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR GROUP 1 Drill Pumpcrete Roller | $41.55 | $19.60 | $61.15 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR GROUP 1 Drill; Pumpcrete; Roller (Bituminous) | $41.55 | $19.60 | $61.15 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR GROUP 1 DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR GROUP 1 DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; ROLLER (ROCK) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR GROUP 4 PUMP; ROLLER (EARTH) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.14 | $16.41 | $60.55 | KY20260073 Heavy |
| Kenton | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 | KY20260095 Building |
| Kenton | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260095 Building |
| Kenton | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260095 Building |
| Larue, Meade | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.85 | $5.00 | $25.85 | KY20260086 Heavy |
| Larue, Meade | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.35 | $13.00 | $37.35 | KY20260105 Building |
| Larue, Meade | OPERATOR: BULLDOZER | $25.35 | $16.74 | $42.09 | KY20260086 Heavy |
| Larue, Meade | OPERATOR: BULLDOZER | $21.49 | $3.84 | $25.33 | KY20260105 Building |
| Larue, Meade | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260086 Heavy |
| Larue, Meade | OPERATOR: LOADER | $26.50 | $13.00 | $39.50 | KY20260086 Heavy |
| Larue, Meade | OPERATOR: MECHANIC | $25.81 | $13.00 | $38.81 | KY20260086 Heavy |
| Larue, Meade | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260105 Building |
| Larue, Meade | OPERATOR: ROLLER | $23.39 | $13.00 | $36.39 | KY20260086 Heavy |
| Larue, Meade | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260105 Building |
| Larue, Meade | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260086 Heavy |
| Larue, Meade | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260105 Building |
| Larue, Meade | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260105 Building |
| Larue, Meade | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260086 Heavy |
| Larue, Meade | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260086 Heavy |
| Larue, Meade | POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260086 Heavy |
| Larue, Meade | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260105 Building |
| Larue, Meade | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260105 Building |
| Larue, Meade | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260105 Building |
| Laurel | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.11 | $13.00 | $34.11 | KY20260025 Building |
| Laurel | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260025 Building |
| Laurel | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260025 Building |
| Laurel | POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 | KY20260025 Building |
| Laurel | POWER EQUIPMENT OPERATOR: BULLDOZER | $41.98 | $19.60 | $61.58 | KY20260025 Building |
| Laurel | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260025 Building |
| Laurel | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260025 Building |
| Lawrence | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.56 | $11.05 | $34.61 | KY20260026 Building |
| Lawrence | OPERATOR: BULLDOZER | $25.36 | $13.00 | $38.36 | KY20260026 Building |
| Lawrence | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260026 Building |
| Lawrence | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260026 Building |
| Lawrence | POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 | KY20260026 Building |
| Lawrence | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 | KY20260026 Building |
| Lawrence | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260026 Building |
| Lyon | OPERATOR: BORING MACHINE | $25.35 | $13.00 | $38.35 | KY20260051 Heavy |
| Lyon | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE; DRILL; GRADER/BLADE; LOADER; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260051 Heavy |
| Lyon | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT; TRACTOR (50 H.P. OR OVER) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260051 Heavy |
| Lyon | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260051 Heavy |
| Lyon | POWER EQUIPMENT OPERATOR GROUP 4 OILER; TRACTOR (UNDER 50 H.P.) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260051 Heavy |
| Madison | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.55 | $10.61 | $35.16 | KY20260027 Building |
| Madison | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260027 Building |
| Madison | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260027 Building |
| Madison | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260027 Building |
| Madison | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260027 Building |
| Madison | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260027 Building |
| Madison | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260027 Building |
| Marshall | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260028 Building |
| Marshall | OPERATOR: BORING MACHINE | $25.35 | $13.00 | $38.35 | KY20260052 Heavy |
| Marshall | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260028 Building |
| Marshall | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260028 Building |
| Marshall | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260028 Building |
| Marshall | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE; DRILL; GRADER/BLADE; LOADER; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260052 Heavy |
| Marshall | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT; TRACTOR (50 H.P. OR OVER) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260052 Heavy |
| Marshall | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260052 Heavy |
| Marshall | POWER EQUIPMENT OPERATOR GROUP 4 OILER; TRACTOR (UNDER 50 H.P.) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260052 Heavy |
| Marshall | POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.65 | $19.60 | $60.25 | KY20260028 Building |
| Marshall | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $1.00 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $1.00 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260028 Building |
| Marshall | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260028 Building |
| Mason | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.55 | $10.61 | $35.16 | KY20260029 Building |
| Mason | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260029 Building |
| Mason | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260029 Building |
| Mason | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260029 Building |
| Mason | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260029 Building |
| Mason | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260029 Building |
| Mason | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260029 Building |
| McCracken | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.30 | $10.73 | $38.03 | KY20260030 Building |
| McCracken | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260030 Building |
| McCracken | OPERATOR: BORING MACHINE | $25.35 | $13.00 | $38.35 | KY20260053 Heavy |
| McCracken | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260030 Building |
| McCracken | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260030 Building |
| McCracken | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260030 Building |
| McCracken | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE; DRILL; GRADER/BLADE; LOADER; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260053 Heavy |
| McCracken | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT; TRACTOR (50 H.P. OR OVER) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260053 Heavy |
| McCracken | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260053 Heavy |
| McCracken | POWER EQUIPMENT OPERATOR GROUP 4 OILER; TRACTOR (UNDER 50 H.P.) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260053 Heavy |
| McCracken | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $1.00 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $1.00 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260030 Building |
| McCracken | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260030 Building |
| McCreary + 14 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.11 | $13.00 | $34.11 | KY20260042 Building |
| McCreary + 14 more | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260042 Building |
| McCreary + 14 more | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260042 Building |
| McCreary + 14 more | POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 | KY20260042 Building |
| McCreary + 14 more | POWER EQUIPMENT OPERATOR: BULLDOZER | $41.98 | $19.60 | $61.58 | KY20260042 Building |
| McCreary + 14 more | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260042 Building |
| McCreary + 14 more | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260042 Building |
| McCreary + 18 more | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.60 | $12.65 | $36.25 | KY20260058 Heavy |
| McCreary + 18 more | OPERATOR: BULLDOZER | $21.72 | $7.45 | $29.17 | KY20260058 Heavy |
| McCreary + 18 more | OPERATOR: LOADER | $30.35 | $0.00 | $30.35 | KY20260058 Heavy |
| McCreary + 18 more | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; GRADER/BLADE; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $9.50 | $51.05 | KY20260058 Heavy |
| McCreary + 18 more | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $9.50 | $48.19 | KY20260058 Heavy |
| McCreary + 18 more | POWER EQUIPMENT OPERATOR GROUP 4 OILER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $9.50 | $47.87 | KY20260058 Heavy |
| McCreary + 41 more | POWER EQUIPMENT OPERATOR: GROUP 1 AUTO PATROL, BATCHER PLANT, BITUMINOUS PAVER, CABLE-WAY, CLAMSHELL, CONCRETE MIXER (21 CU FT OR OVER), CONCRETE PUMP, CRANE, CRUSHER PLANT, DERRICK, DERRICK BOAT, DITCHING AND TRENCHING MACHINE, DRAGLINE, DREDGE ENGINEER, ELEVATOR (REGARDLESS OF OWNERSHIP WHEN USED FOR HOISTING ANY BUILDING MATERIAL), ELEVATING GRADER AND ALL TYPES OF LOADERS, HOE-TYPE MACHINE, HOISTING ENGINE, LOCOMOTIVE, LETOURNEAU OR CARRY-ALL SCOOP, BULLDOZER, MECHANIC, ORANGEPEEL BUCKET, PILEDRIVER, POWER BLADE, ROLLER (BITUMINOUS), ROLLER (EARTH), ROLLER (ROCK), SCARIFIER, SHOVEL, TRACTOR SHOVEL, TRUCK CRANE, WELL POINT, WINCH TRUCK, PUSH DOZER, GROUT PUMP, HIGH LIFT, FORK LIFT (REGARDLESS OF LIFT HEIGHT), ALL TYPES OF BOOM CATS, MULTIPLE OPERATOR, CORE DRILL, TOW OR PUSH BOAT, A-FRAME WINCH TRUCK, CONCRETE PAVER, GRADE-ALL, HOIST, HYSTER, MATERIAL PUMP, PUMPCRETE, ROSS CARRIER, SHEEPFOOT, SIDEBOOM, THROTTLE-VALVE MAN, ROTARY DRILL, POWER GENERATOR, MUCKING MACHINE, ROCK SPREADER ATTACHED TO EQUIPMENT, SCOOPMOBILE, KECAL LOADER, TOWER CRANES (FRENCH, GERMAN AND OTHER TYPES), HYDOCRANE, TUGGER, BACKFILLER GURRIES, SELF-PROPELLED COMPACTOR, SELF-CONTAINED HYDRAULIC PERCUSSION DRILL | $29.95 | $14.40 | $44.35 | KY20260107 Highway |
| McCreary + 41 more | POWER EQUIPMENT OPERATOR: GROUP 2 ALL AIR COMPRESSORS (200 CU FT/MIN OR GREATER), BITUMINOUS MIXER, CONCRETE MIXER (21 CU. FT. OR OVER), WELDING MACHINE, FORM GRADER, TRACTOR (50 HP AND OVER), BULL FLOAT, FINISH MACHINE, OUTBOARD MOTOR BOAT, BRAKEMAN, MECHANIC TENDER, WHIRLY OILER, TRACT-AIR, ROAD WIDENING TRENCHER, ARTICULATING TRUCKS | $29.95 | $14.40 | $44.35 | KY20260107 Highway |
| McCreary + 41 more | POWER EQUIPMENT OPERATOR: GROUP 3 GREASER ON GREASE FACILITIES SERVICING HEAVY EQUIPMENT | $27.26 | $14.40 | $41.66 | KY20260107 Highway |
| McCreary + 41 more | POWER EQUIPMENT OPERATOR: GROUP 4 BITUMINOUS DISTRIBUTOR, CEMENT GUN, CONVEYOR, MUD JACK, PAVING JOINT MACHINE, PUMP, TAMPING MACHINE, TRACTOR (UNDER 50 HP), VIBRATOR, OILER, AIR COMPRESSOR (UNDER 200 CU FT PER MINUTE), CONCRETE SAW, BURLAP AND CURING MACHINE, HYDRO SEEDER, POWER FORM HANDLING EQUIPMENT, DECKHAND OILER, HYDRAULIC POST DRIVER | $26.96 | $14.40 | $41.36 | KY20260107 Highway |
| McLean | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.81 | $13.00 | $42.81 | KY20260074 Heavy |
| McLean | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260074 Heavy |
| McLean | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260074 Heavy |
| McLean | OPERATOR: ROLLER | $20.21 | $13.00 | $33.21 | KY20260074 Heavy |
| McLean | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260074 Heavy |
| McLean | POWER EQUIPMENT OPERATOR GROUP 1 BULLDOZER; CRANE; DRILL; LOADER; MECHANIC; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260074 Heavy |
| McLean | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; COMPRESSOR; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260074 Heavy |
| McLean | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260074 Heavy |
| McLean | POWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260074 Heavy |
| Mercer | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.55 | $10.61 | $35.16 | KY20260031 Building |
| Mercer | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260031 Building |
| Mercer | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260031 Building |
| Mercer | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260031 Building |
| Mercer | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260031 Building |
| Mercer | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260031 Building |
| Mercer | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260031 Building |
| Monroe | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.60 | $12.65 | $36.25 | KY20260054 Heavy |
| Monroe | OPERATOR: BULLDOZER | $20.99 | $6.33 | $27.32 | KY20260054 Heavy |
| Monroe | OPERATOR: LOADER | $30.35 | $0.00 | $30.35 | KY20260054 Heavy |
| Monroe | POWER EQUIPMENT OPERATOR GROUP 1 Crane; Drill; Grader/Blade; Mechanic; Scraper Operators on cranes with booms 150 feet and over (including jib) shall receive $1.00 above Group 1 rate; 250 feet and over including jib shall receive $1.50 above Class 1 rate. Combination Rate: All crane operators operating cranes, where the length of the boom in combination with the length of the piling leads equal or exceeds 150 feet, shall receive $1.00 above the Group 1 rate | $41.55 | $9.50 | $51.05 | KY20260054 Heavy |
| Monroe | POWER EQUIPMENT OPERATOR GROUP 2 Bobcat/Skid Steer/Skid Loader; Forklift | $38.69 | $9.50 | $48.19 | KY20260054 Heavy |
| Monroe | POWER EQUIPMENT OPERATOR GROUP 4 Oiler | $38.37 | $9.50 | $47.87 | KY20260054 Heavy |
| Montgomery | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.55 | $10.61 | $35.16 | KY20260032 Building |
| Montgomery | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260032 Building |
| Montgomery | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260032 Building |
| Montgomery | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260032 Building |
| Montgomery | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260032 Building |
| Montgomery | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260032 Building |
| Montgomery | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260032 Building |
| Nelson | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.35 | $13.00 | $38.35 | KY20260075 Heavy |
| Nelson | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.27 | $3.72 | $25.99 | KY20260096 Building |
| Nelson | OPERATOR: BULLDOZER | $24.73 | $15.19 | $39.92 | KY20260075 Heavy |
| Nelson | OPERATOR: BULLDOZER | $21.49 | $3.84 | $25.33 | KY20260096 Building |
| Nelson | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260075 Heavy |
| Nelson | OPERATOR: LOADER | $26.50 | $13.00 | $39.50 | KY20260075 Heavy |
| Nelson | OPERATOR: MECHANIC | $25.81 | $13.00 | $38.81 | KY20260075 Heavy |
| Nelson | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260096 Building |
| Nelson | OPERATOR: ROLLER | $23.39 | $13.00 | $36.39 | KY20260075 Heavy |
| Nelson | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260096 Building |
| Nelson | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260075 Heavy |
| Nelson | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260096 Building |
| Nelson | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260096 Building |
| Nelson | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260075 Heavy |
| Nelson | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260075 Heavy |
| Nelson | POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260075 Heavy |
| Nelson | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260096 Building |
| Nelson | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260096 Building |
| Nelson | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260096 Building |
| Oldham | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.43 | $13.00 | $39.43 | KY20260076 Heavy |
| Oldham | OPERATOR: BULLDOZER | $24.73 | $15.19 | $39.92 | KY20260076 Heavy |
| Oldham | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260076 Heavy |
| Oldham | OPERATOR: LOADER | $26.50 | $13.00 | $39.50 | KY20260076 Heavy |
| Oldham | OPERATOR: MECHANIC | $25.81 | $13.00 | $38.81 | KY20260076 Heavy |
| Oldham | OPERATOR: ROLLER | $23.39 | $13.00 | $36.39 | KY20260076 Heavy |
| Oldham | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260076 Heavy |
| Oldham | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260076 Heavy |
| Oldham | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260076 Heavy |
| Oldham | POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260076 Heavy |
| Owen | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.42 | $12.70 | $39.12 | KY20260055 Heavy |
| Owen | OPERATOR: BULLDOZER | $29.96 | $13.00 | $42.96 | KY20260055 Heavy |
| Owen | OPERATOR: LOADER | $25.35 | $13.00 | $38.35 | KY20260055 Heavy |
| Owen | POWER EQUIPMENT OPERATOR GROUP 1 Crane; Drill; Grader/Blade; Mechanic; Scraper Operators on cranes with booms 150 feet and over (including jib) shall receive $1.00 above Group 1 rate; 250 feet and over including jib shall receive $1.50 above Class 1 rate. Combination Rate: All crane operators operating cranes, where the length of the boom in combination with the length of the piling leads equal or exceeds 150 feet, shall receive $1.00 above the Group 1 rate | $41.55 | $9.50 | $51.05 | KY20260055 Heavy |
| Owen | POWER EQUIPMENT OPERATOR GROUP 2 Bobcat/Skid Steer/Skid Loader; Forklift | $38.69 | $9.50 | $48.19 | KY20260055 Heavy |
| Owen | POWER EQUIPMENT OPERATOR GROUP 4 Oiler | $38.37 | $9.50 | $47.87 | KY20260055 Heavy |
| Pike | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.56 | $11.05 | $34.61 | KY20260033 Building |
| Pike | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.23 | $0.00 | $27.23 | KY20260056 Heavy |
| Pike | OPERATOR: BULLDOZER | $25.36 | $13.00 | $38.36 | KY20260033 Building |
| Pike | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260033 Building |
| Pike | OPERATOR: LOADER | $30.35 | $0.00 | $30.35 | KY20260056 Heavy |
| Pike | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260033 Building |
| Pike | POWER EQUIPMENT OPERATOR GROUP 1 BULLDOZER; CRANE; DRILL; GRADER/BLADE; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260056 Heavy |
| Pike | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260056 Heavy |
| Pike | POWER EQUIPMENT OPERATOR GROUP 4 OILER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260056 Heavy |
| Pike | POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 | KY20260033 Building |
| Pike | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 | KY20260033 Building |
| Pike | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260033 Building |
| Pulaski | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.11 | $13.00 | $34.11 | KY20260034 Building |
| Pulaski | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260034 Building |
| Pulaski | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260034 Building |
| Pulaski | POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 | KY20260034 Building |
| Pulaski | POWER EQUIPMENT OPERATOR: BULLDOZER | $41.98 | $19.60 | $61.58 | KY20260034 Building |
| Pulaski | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260034 Building |
| Pulaski | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260034 Building |
| Rowan | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.55 | $10.61 | $35.16 | KY20260035 Building |
| Rowan | OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 | KY20260035 Building |
| Rowan | OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 | KY20260035 Building |
| Rowan | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260035 Building |
| Rowan | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260035 Building |
| Rowan | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260035 Building |
| Rowan | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260035 Building |
| Shelby | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.43 | $13.00 | $39.43 | KY20260077 Heavy |
| Shelby | OPERATOR: BULLDOZER | $24.73 | $15.19 | $39.92 | KY20260077 Heavy |
| Shelby | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260077 Heavy |
| Shelby | OPERATOR: LOADER | $26.50 | $13.00 | $39.50 | KY20260077 Heavy |
| Shelby | OPERATOR: MECHANIC | $25.81 | $13.00 | $38.81 | KY20260077 Heavy |
| Shelby | OPERATOR: ROLLER | $23.39 | $13.00 | $36.39 | KY20260077 Heavy |
| Shelby | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260077 Heavy |
| Shelby | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260077 Heavy |
| Shelby | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260077 Heavy |
| Shelby | POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260077 Heavy |
| Shelby, Spencer, Trimble | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.27 | $3.72 | $25.99 | KY20260106 Building |
| Shelby, Spencer, Trimble | OPERATOR: BULLDOZER | $21.49 | $3.84 | $25.33 | KY20260106 Building |
| Shelby, Spencer, Trimble | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260106 Building |
| Shelby, Spencer, Trimble | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260106 Building |
| Shelby, Spencer, Trimble | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260106 Building |
| Shelby, Spencer, Trimble | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260106 Building |
| Shelby, Spencer, Trimble | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260106 Building |
| Shelby, Spencer, Trimble | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260106 Building |
| Shelby, Spencer, Trimble | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260106 Building |
| Trigg | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.76 | $13.00 | $36.76 | KY20260078 Heavy |
| Trigg | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.05 | $10.34 | $39.39 | KY20260097 Building |
| Trigg | OPERATOR: BULLDOZER | $23.14 | $15.51 | $38.65 | KY20260078 Heavy |
| Trigg | OPERATOR: BULLDOZER | $24.51 | $12.72 | $37.23 | KY20260097 Building |
| Trigg | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260078 Heavy |
| Trigg | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260078 Heavy |
| Trigg | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260097 Building |
| Trigg | OPERATOR: ROLLER | $20.21 | $13.00 | $33.21 | KY20260078 Heavy |
| Trigg | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260097 Building |
| Trigg | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260078 Heavy |
| Trigg | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260097 Building |
| Trigg | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; LOADER; MECHANIC; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260078 Heavy |
| Trigg | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260078 Heavy |
| Trigg | POWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260078 Heavy |
| Trigg | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260097 Building |
| Trigg | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260097 Building |
| Trigg | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260097 Building |
| Union | OPERATOR: BORING MACHINE | $25.35 | $13.00 | $38.35 | KY20260057 Heavy |
| Union | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE; DRILL; GRADER/BLADE; LOADER; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260057 Heavy |
| Union | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT; TRACTOR (50 H.P. OR OVER) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260057 Heavy |
| Union | POWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | KY20260057 Heavy |
| Union | POWER EQUIPMENT OPERATOR GROUP 4 OILER; TRACTOR (UNDER 50 H.P.) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260057 Heavy |
| Warren | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.18 | $8.41 | $30.59 | KY20260079 Heavy |
| Warren | OPERATOR: BULLDOZER | $25.35 | $8.87 | $34.22 | KY20260079 Heavy |
| Warren | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260079 Heavy |
| Warren | OPERATOR: MECHANIC | $22.43 | $11.75 | $34.18 | KY20260079 Heavy |
| Warren | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260079 Heavy |
| Warren | OPERATOR: ROLLER | $20.21 | $13.00 | $33.21 | KY20260079 Heavy |
| Warren | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260079 Heavy |
| Warren | POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; LOADER; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260079 Heavy |
| Warren | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260079 Heavy |
| Warren | POWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260079 Heavy |
| Webster | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.40 | $9.60 | $36.00 | KY20260098 Building |
| Webster | OPERATOR: BULLDOZER | $23.63 | $10.98 | $34.61 | KY20260080 Heavy |
| Webster | OPERATOR: BULLDOZER | $24.51 | $12.72 | $37.23 | KY20260098 Building |
| Webster | OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | KY20260080 Heavy |
| Webster | OPERATOR: OILER | $24.34 | $13.00 | $37.34 | KY20260080 Heavy |
| Webster | OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | KY20260098 Building |
| Webster | OPERATOR: ROLLER | $20.21 | $13.00 | $33.21 | KY20260080 Heavy |
| Webster | OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | KY20260098 Building |
| Webster | OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | KY20260080 Heavy |
| Webster | POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | KY20260098 Building |
| Webster | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260098 Building |
| Webster | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; DRILL; LOADER; MECHANIC; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | KY20260080 Heavy |
| Webster | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | KY20260080 Heavy |
| Webster | POWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | KY20260080 Heavy |
| Webster | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | KY20260098 Building |
| Webster | POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | KY20260098 Building |
| Webster | POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | KY20260098 Building |
| Whitley | OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.11 | $13.00 | $34.11 | KY20260036 Building |
| Whitley | OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 | KY20260036 Building |
| Whitley | POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | KY20260036 Building |
| Whitley | POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 | KY20260036 Building |
| Whitley | POWER EQUIPMENT OPERATOR: BULLDOZER | $41.98 | $19.60 | $61.58 | KY20260036 Building |
| Whitley | POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 | KY20260036 Building |
| Whitley | POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 | KY20260036 Building |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Kentucky trades.