Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
| BOILERMAKER | $43.85 | $28.44 | $72.29 |
| MILLWRIGHT | $35.54 | $29.13 | $64.67 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION ONLY) | $37.04 | $26.57 | $63.61 |
| POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 |
| IRONWORKER, REINFORCING | $35.63 | $26.49 | $62.12 |
| LABORER (CARPENTER TENDER, GRADE CHECKER) | $28.13 | $17.38 | $45.51 |
| LABORER (PIPELAYER, TAMPER - HAND HELD) | $28.53 | $17.38 | $45.91 |
| LABORER (GROUTING) | $28.73 | $17.38 | $46.11 |
| PAINTER (DRYWALL FINISHING/TAPING AND SPRAY ONLY) | $34.29 | $23.95 | $58.24 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $41.00 | $21.66 | $62.66 |
| SPRINKLER FITTER | $44.15 | $26.08 | $70.23 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $40.32 | $25.66 | $65.98 |
| TRUCK DRIVER: DUMP TRUCK | $17.07 | $6.25 | $23.32 |
| TILE SETTER | $25.77 | $6.10 | $31.87 |
| TILE FINISHER | $17.67 | $7.45 | $25.12 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $27.74 | $13.20 | $40.94 |
| ROOFER | $22.31 | $7.41 | $29.72 |
| PLUMBER | $30.36 | $13.62 | $43.98 |
| PAINTER (BRUSH AND ROLLER) | $21.28 | $11.14 | $32.42 |
| OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.55 | $10.61 | $35.16 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.17 | $10.05 | $33.22 |
| LABORER: MASON TENDER - BRICK | $22.36 | $10.76 | $33.12 |
| LABORER: COMMON OR GENERAL | $20.67 | $7.65 | $28.32 |
| IRONWORKER, STRUCTURAL | $25.09 | $18.07 | $43.16 |
| ELECTRICIAN | $29.53 | $12.94 | $42.47 |
| CEMENT MASON/CONCRETE FINISHER | $20.92 | $10.90 | $31.82 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $22.53 | $10.25 | $32.78 |
| CARPENTER (FORM WORK ONLY) | $19.97 | $9.54 | $29.51 |
| BRICKLAYER | $23.53 | $11.62 | $35.15 |
| IRONWORKER: ORNAMENTAL | $36.21 | $26.42 | $62.63 |
| LABORER: POWER TOOL OPERATOR | $26.73 | $16.72 | $43.45 |
| OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 |