Wage determination KY20260022 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KY20260022 on · latest revision 1 · verify at sam.gov/wage-determination/KY20260022/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 | $68.92 |
| BOILERMAKER | $43.85 | $28.44 | $72.29 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $37.04 | $26.57 | $63.61 |
| ELECTRICIAN | $41.15 | $29.35 | $70.50 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 |
| IRONWORKER, STRUCTURAL AND REINFORCING: ZONE 3 ZONE 3 - (ADD $2.00 PER HOUR TO BASE RATE) 50 MILE RADIUS & OVER OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY | $41.70 | $29.59 | $71.29 |
| IRONWORKER, STRUCTURAL AND REINFORCING: ZONE 2 ZONE 2 - (ADD $0.40 PER HOUR TO BASE RATE) 10 TO 50 MILE RADIUS OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY | $40.10 | $29.59 | $69.69 |
| IRONWORKER, STRUCTURAL AND REINFORCING: ZONE 1 ZONE 1 - (NO BASE RATE INCREASE) UP TO 10 MILE RADIUS OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY | $39.70 | $29.59 | $69.29 |
| LABORER: PIPELAYER | $28.53 | $17.38 | $45.91 |
| LABORER: MASON TENDER - BRICK | $28.16 | $17.55 | $45.71 |
| PAINTER (SPRAY ONLY) | $34.29 | $23.95 | $58.24 |
| GLAZIER | $32.89 | $14.33 | $47.22 |
| CEMENT MASON/CONCRETE FINISHER | $33.60 | $16.05 | $49.65 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $42.75 | $25.76 | $68.51 |
| SPRINKLER FITTER | $44.15 | $26.08 | $70.23 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $40.32 | $25.66 | $65.98 |
| TRUCK DRIVER: DUMP TRUCK | $17.07 | $6.25 | $23.32 |
| TILE SETTER | $25.77 | $6.10 | $31.87 |
| TILE FINISHER | $17.67 | $7.45 | $25.12 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $22.86 | $13.00 | $35.86 |
| ROOFER | $22.31 | $7.41 | $29.72 |
| PLUMBER | $32.60 | $18.78 | $51.38 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $25.63 | $20.94 | $46.57 |
| PAINTER (BRUSH AND ROLLER) | $18.36 | $7.07 | $25.43 |
| OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 |
| OPERATOR: BULLDOZER | $25.36 | $13.00 | $38.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.08 | $13.00 | $38.08 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.27 | $10.42 | $32.69 |
| LABORER: COMMON OR GENERAL | $20.36 | $11.20 | $31.56 |
| CARPENTER, EXCLUDES DRYWALL HANGING, METAL STUD INSTALLATION, AND FORM WORK | $25.25 | $12.07 | $37.32 |
| CARPENTER (FORM WORK ONLY) | $20.69 | $9.05 | $29.74 |
| BRICKLAYER | $24.61 | $11.88 | $36.49 |
| IRONWORKER: ORNAMENTAL | $36.73 | $27.05 | $63.78 |
| LABORER: POWER TOOL OPERATOR | $28.73 | $19.36 | $48.09 |