Building construction wages: Campbell, Kentucky
Wage determination KY20260088 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KY20260088 on · latest revision 2 · verify at sam.gov/wage-determination/KY20260088/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
| BOILERMAKER | $43.85 | $28.44 | $72.29 |
| BRICKLAYER | $35.00 | $17.13 | $52.13 |
| TILE SETTER | $33.41 | $17.51 | $50.92 |
| TILE FINISHER | $28.87 | $17.46 | $46.33 |
| CARPENTER (EXCLUDES FORM WORK) | $32.26 | $19.24 | $51.50 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $38.05 | $22.97 | $61.02 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 | $95.85 |
| POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $37.77 | $23.90 | $61.67 |
| IRONWORKER, REINFORCING | $38.27 | $23.90 | $62.17 |
| LABORER (COMMON OR GENERAL) | $27.30 | $18.75 | $46.05 |
| LABORER: POWER TOOL OPERATOR | $31.35 | $23.18 | $54.53 |
| PAINTER: BRUSH AND ROLLER | $28.29 | $14.01 | $42.30 |
| GLAZIER | $31.95 | $16.65 | $48.60 |
| CEMENT MASON/CONCRETE FINISHER | $33.60 | $16.05 | $49.65 |
| PLUMBER | $41.00 | $21.66 | $62.66 |
| PIPEFITTER | $41.00 | $21.66 | $62.66 |
| ROOFER | $34.38 | $19.94 | $54.32 |
| SPRINKLER FITTER | $44.15 | $26.08 | $70.23 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $33.53 | $26.71 | $60.24 |
| TRUCK DRIVER: DUMP TRUCK | $24.35 | $14.59 | $38.94 |
| PAINTER: SPRAY | $22.81 | $11.87 | $34.68 |
| OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 |
| OPERATOR: BULLDOZER | $19.69 | $4.71 | $24.40 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.66 | $10.81 | $35.47 |
| LABORER: PIPELAYER | $20.36 | $9.90 | $30.26 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $25.10 | $13.67 | $38.77 |
| LABORER: MASON TENDER - BRICK | $22.65 | $9.04 | $31.69 |
| CARPENTER (FORM WORK ONLY) | $23.87 | $9.66 | $33.53 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.