Building construction wages: Daviess, Hancock, McLean, Kentucky
Wage determination KY20260103 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KY20260103 on · latest revision 2 · verify at sam.gov/wage-determination/KY20260103/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.85 | $28.44 | $72.29 |
| ELECTRICIAN | $37.10 | $20.03 | $57.13 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 |
| IRONWORKER: ORNAMENTAL | $37.77 | $23.90 | $61.67 |
| LABORER: MASON TENDER - BRICK | $28.89 | $19.20 | $48.09 |
| LABORER: CONCRETE SAW - HAND HELD/WALK BEHIND, GRADE CHECKER, JACK HAMMER, MASON TENDER - CEMENT/CONCRETE | $28.16 | $17.55 | $45.71 |
| LABORER: CARPENTER TENDER, DEMOLIOTION, FORM STRIPPING | $27.16 | $17.55 | $44.71 |
| LABORER: POWER TOOL OPERATOR | $31.35 | $23.18 | $54.53 |
| PAINTER: SPRAY | $30.62 | $20.30 | $50.92 |
| GLAZIER | $32.86 | $19.44 | $52.30 |
| PLUMBER | $44.26 | $20.28 | $64.54 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $38.41 | $22.26 | $60.67 |
| ROOFER | $30.97 | $13.91 | $44.88 |
| SPRINKLER FITTER | $44.15 | $26.08 | $70.23 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $40.19 | $27.33 | $67.52 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $40.32 | $25.66 | $65.98 |
| TRUCK DRIVER: DUMP TRUCK | $23.60 | $8.03 | $31.63 |
| TILE SETTER | $20.96 | $0.00 | $20.96 |
| TILE FINISHER | $15.42 | $7.24 | $22.66 |
| PAINTER (BRUSH AND ROLLER) | $18.79 | $5.88 | $24.67 |
| OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 |
| OPERATOR: BULLDOZER | $24.51 | $12.72 | $37.23 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.38 | $9.10 | $36.48 |
| LABORER: PIPELAYER | $15.00 | $4.08 | $19.08 |
| LABORER: COMMON OR GENERAL | $18.71 | $7.08 | $25.79 |
| IRONWORKER, STRUCTURAL | $29.44 | $9.01 | $38.45 |
| IRONWORKER, REINFORCING | $27.31 | $16.86 | $44.17 |
| CEMENT MASON/CONCRETE FINISHER | $20.56 | $9.56 | $30.12 |
| CARPENTER, EXCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND FORM WORK | $20.57 | $13.25 | $33.82 |
| CARPENTER (FORM WORK ONLY) | $24.29 | $8.21 | $32.50 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $22.10 | $14.47 | $36.57 |
| BRICKLAYER | $25.09 | $10.05 | $35.14 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.94 | $21.99 | $52.93 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.