Building construction wages: Carroll, Kentucky
Wage determination KY20260021 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KY20260021 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/KY20260021/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.00 | $20.89 | $50.89 |
| BOILERMAKER | $43.85 | $28.44 | $72.29 |
| MILLWRIGHT | $35.54 | $29.13 | $64.67 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION ONLY) | $37.04 | $26.57 | $63.61 |
| POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 |
| IRONWORKER, REINFORCING | $35.63 | $26.49 | $62.12 |
| LABORER (CARPENTER TENDER, GRADE CHECKER) | $28.13 | $17.38 | $45.51 |
| LABORER (PIPELAYER, TAMPER - HAND HELD) | $28.53 | $17.38 | $45.91 |
| LABORER (GROUTING) | $28.73 | $17.38 | $46.11 |
| PAINTER (DRYWALL FINISHING/TAPING AND SPRAY ONLY) | $34.29 | $23.95 | $58.24 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $41.00 | $21.66 | $62.66 |
| SPRINKLER FITTER | $44.15 | $26.08 | $70.23 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $40.32 | $25.66 | $65.98 |
| TRUCK DRIVER: DUMP TRUCK | $17.07 | $6.25 | $23.32 |
| TILE SETTER | $25.77 | $6.10 | $31.87 |
| TILE FINISHER | $17.67 | $7.45 | $25.12 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $27.74 | $13.20 | $40.94 |
| ROOFER | $22.31 | $7.41 | $29.72 |
| PLUMBER | $30.36 | $13.62 | $43.98 |
| PAINTER (BRUSH AND ROLLER) | $21.28 | $11.14 | $32.42 |
| OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.64 | $13.00 | $37.64 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.55 | $10.61 | $35.16 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.17 | $10.05 | $33.22 |
| LABORER: MASON TENDER - BRICK | $22.36 | $10.76 | $33.12 |
| LABORER: COMMON OR GENERAL | $20.67 | $7.65 | $28.32 |
| IRONWORKER, STRUCTURAL | $25.25 | $15.78 | $41.03 |
| ELECTRICIAN | $29.53 | $12.94 | $42.47 |
| CEMENT MASON/CONCRETE FINISHER | $20.92 | $10.90 | $31.82 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $22.53 | $10.25 | $32.78 |
| CARPENTER (FORM WORK ONLY) | $19.97 | $9.54 | $29.51 |
| BRICKLAYER | $23.53 | $11.62 | $35.15 |
| IRONWORKER: ORNAMENTAL | $36.21 | $26.42 | $62.63 |
| LABORER: POWER TOOL OPERATOR | $26.73 | $16.72 | $43.45 |
| OPERATOR: BULLDOZER | $40.05 | $19.10 | $59.15 |