Building construction wages: Webster, Kentucky
Wage determination KY20260098 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KY20260098 on · latest revision 2 · verify at sam.gov/wage-determination/KY20260098/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.85 | $28.44 | $72.29 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.35 | $21.67 | $53.02 |
| ELECTRICIAN | $37.10 | $20.03 | $57.13 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 |
| IRONWORKER: ORNAMENTAL | $37.77 | $23.90 | $61.67 |
| LABORER (COMMON OR GENERAL) | $28.89 | $19.20 | $48.09 |
| LABORER: MASON TENDER - BRICK, MASON TENDER - CEMENT/CONCRETE | $28.80 | $18.77 | $47.57 |
| LABORER: POWER TOOL OPERATOR | $31.35 | $23.18 | $54.53 |
| PAINTER: SPRAY | $30.62 | $20.30 | $50.92 |
| PLUMBER | $44.26 | $20.28 | $64.54 |
| PIPEFITTER | $38.41 | $22.26 | $60.67 |
| ROOFER | $30.97 | $13.91 | $44.88 |
| SPRINKLER FITTER | $44.15 | $26.08 | $70.23 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $40.19 | $27.33 | $67.52 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $40.32 | $25.66 | $65.98 |
| TRUCK DRIVER: DUMP TRUCK | $23.60 | $8.03 | $31.63 |
| TILE SETTER | $20.96 | $0.00 | $20.96 |
| TILE FINISHER | $15.42 | $7.24 | $22.66 |
| PAINTER (BRUSH AND ROLLER) | $18.79 | $5.88 | $24.67 |
| OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 |
| OPERATOR: BULLDOZER | $24.51 | $12.72 | $37.23 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.40 | $9.60 | $36.00 |
| LABORER: PIPELAYER | $15.00 | $4.08 | $19.08 |
| IRONWORKER, STRUCTURAL | $25.41 | $7.63 | $33.04 |
| IRONWORKER, REINFORCING | $27.31 | $16.86 | $44.17 |
| CEMENT MASON/CONCRETE FINISHER | $20.56 | $9.56 | $30.12 |
| CARPENTER (EXCLUDING DRYWALL HANGING AND METAL STUD INSTALLATION) | $19.86 | $4.64 | $24.50 |
| BRICKLAYER | $25.09 | $10.05 | $35.14 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.94 | $21.99 | $52.93 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.