| ELECTRICIAN | $40.96 | $22.44 | $63.40 |
| POWER EQUIPMENT OPERATOR GROUP 1 Crane Forklift | $41.55 | $19.60 | $61.15 |
| POWER EQUIPMENT OPERATOR GROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 |
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; DRILL; PUMPCRETE; ROLLER (BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 |
| POWER EQUIPMENT OPERATOR GROUP 4 PUMP; ROLLER (EARTH) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 |
| POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; ROLLER (ROCK) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 |
| POWER EQUIPMENT OPERATOR GROUP 1 Backhoe/Excavator/Trackhoe; Bulldozer; Drill; Pumpcrete; Roller (Bituminous) | $41.55 | $19.60 | $61.15 |
| IRONWORKER (STRUCTURAL AND REINFORCING) | $37.77 | $23.90 | $61.67 |
| IRONWORKER: ORNAMENTAL | $36.17 | $25.80 | $61.97 |
| LABORER: CONCRETE WORKER | $26.87 | $19.66 | $46.53 |
| LABORER: FLAGGER | $35.52 | $14.45 | $49.97 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) & PIPELAYER | $35.69 | $14.45 | $50.14 |
| TRUCK DRIVER: DUMP TRUCK | $17.82 | $3.26 | $21.08 |
| OPERATOR: TRENCHER | $26.27 | $12.37 | $38.64 |
| OPERATOR: OILER | $24.34 | $13.00 | $37.34 |
| OPERATOR: MECHANIC | $28.60 | $11.83 | $40.43 |
| OPERATOR: LOADER | $26.68 | $13.00 | $39.68 |
| LABORER: CONCRETE FINISHING | $25.75 | $8.60 | $34.35 |
| LABORER: COMMON OR GENERAL | $22.17 | $9.64 | $31.81 |
| CARPENTER (FORM WORK ONLY) | $24.80 | $8.76 | $33.56 |