Building construction wages: Boyd, Greenup, Kentucky
Wage determination KY20260101 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KY20260101 on · latest revision 2 · verify at sam.gov/wage-determination/KY20260101/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 |
| BOILERMAKER | $43.85 | $28.44 | $72.29 |
| INDUSTRIAL: BRICKLAYER - REFRACTORY BRICK REPLACEMENT | $41.05 | $21.79 | $62.84 |
| BRICKLAYER | $35.00 | $17.13 | $52.13 |
| CARPENTER | $37.04 | $26.57 | $63.61 |
| ELECTRICIAN | $41.15 | $29.35 | $70.50 |
| POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 |
| IRONWORKER: ORNAMENTAL | $37.77 | $23.90 | $61.67 |
| LABORER: POWER TOOL OPERATOR | $31.35 | $23.18 | $54.53 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $31.20 | $23.18 | $54.38 |
| LABORER: FIRE WATCH | $31.20 | $23.18 | $54.38 |
| PAINTER: BRUSH AND ROLLER | $31.96 | $23.95 | $55.91 |
| CEMENT MASON/CONCRETE FINISHER | $33.60 | $16.05 | $49.65 |
| PIPEFITTER | $42.75 | $25.76 | $68.51 |
| PLUMBER | $41.00 | $21.66 | $62.66 |
| ROOFER | $34.38 | $19.94 | $54.32 |
| SPRINKLER FITTER | $44.15 | $26.08 | $70.23 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $33.53 | $26.71 | $60.24 |
| TRUCK DRIVER: DUMP TRUCK | $24.35 | $14.59 | $38.94 |
| PAINTER: SPRAY | $22.81 | $11.87 | $34.68 |
| OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 |
| OPERATOR: BULLDOZER | $19.69 | $4.71 | $24.40 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.66 | $10.81 | $35.47 |
| LABORER: PIPELAYER | $20.36 | $9.90 | $30.26 |
| LABORER: MASON TENDER - BRICK | $21.86 | $9.31 | $31.17 |
| LABORER: COMMON OR GENERAL | $23.27 | $13.67 | $36.94 |
| IRONWORKER, STRUCTURAL | $25.62 | $18.01 | $43.63 |
| IRONWORKER, REINFORCING | $28.38 | $16.89 | $45.27 |
| BRICKLAYER: TILE SETTER | $35.11 | $18.26 | $53.37 |
| BRICKLAYER: TILE FINISHER | $35.40 | $17.66 | $53.06 |
| LABORER: CARPENTER TENDER | $30.95 | $21.83 | $52.78 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.