Building construction wages: Adair, Simpson, Kentucky
Wage determination KY20260037 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KY20260037 on · latest revision 1 · verify at sam.gov/wage-determination/KY20260037/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.24 | $18.54 | $48.78 |
| BOILERMAKER | $43.85 | $28.44 | $72.29 |
| CARPENTER (INCLUDES FORM WORK, EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $32.25 | $18.09 | $50.34 |
| ELECTRICIAN | $41.15 | $29.35 | $70.50 |
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 | $95.85 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 |
| POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $41.98 | $19.60 | $61.58 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $41.98 | $19.60 | $61.58 |
| IRONWORKER, REINFORCING ZONE 3 - (ADD $2.00 PER HOUR TO BASE RATE) 50 MILE RADIUS & OVER OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY | $41.70 | $29.59 | $71.29 |
| IRONWORKER, REINFORCING ZONE 2 - (ADD $0.40 PER HOUR TO BASE RATE) 10 TO 50 MILE RADIUS OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY | $40.10 | $29.59 | $69.69 |
| IRONWORKER, REINFORCING (ZONE 1) | $39.70 | $29.59 | $69.29 |
| LABORER: PIPELAYER | $28.53 | $17.38 | $45.91 |
| LABORER: CARPENTER TENDER | $26.69 | $13.32 | $40.01 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.89 | $13.32 | $40.21 |
| LABORER: MASON TENDER - BRICK | $28.16 | $17.55 | $45.71 |
| PAINTER (SPRAY ONLY) | $34.29 | $23.95 | $58.24 |
| PIPEFITTER | $41.00 | $21.66 | $62.66 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $44.15 | $26.08 | $70.23 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $40.32 | $25.66 | $65.98 |
| TRUCK DRIVER: DUMP TRUCK | $17.07 | $6.25 | $23.32 |
| TILE SETTER | $25.77 | $6.10 | $31.87 |
| TILE FINISHER | $17.67 | $7.45 | $25.12 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $25.91 | $8.06 | $33.97 |
| ROOFER | $22.31 | $7.41 | $29.72 |
| PLUMBER | $33.41 | $16.67 | $50.08 |
| PAINTER (BRUSH AND ROLLER) | $18.20 | $6.43 | $24.63 |
| OPERATOR: GRADER/BLADE | $24.33 | $13.00 | $37.33 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.11 | $13.00 | $34.11 |
| LABORER: COMMON OR GENERAL | $16.97 | $6.11 | $23.08 |
| IRONWORKER, STRUCTURAL | $22.31 | $15.40 | $37.71 |
| CEMENT MASON/CONCRETE FINISHER | $27.99 | $0.00 | $27.99 |
| BRICKLAYER | $24.61 | $11.88 | $36.49 |
| IRONWORKER: ORNAMENTAL | $36.73 | $27.05 | $63.78 |
| LABORER: POWER TOOL OPERATOR | $28.73 | $19.36 | $48.09 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.