Painter prevailing wages: Illinois, county by county
147 current painter rates across 65 active Illinois wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Alexander | PAINTER: BRUSH, SPRAY, DRYWALL FINISHING, AND TAPERS EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $24.52 | $18.78 | $43.30 | IL20260051 Residential |
| Alexander + 27 more | PAINTER: BLASTING, SPRAYING & PRESSURE WASHING (CRAWFORD, EFFINGHAM, JASPER, LAWRENCE, AND RICHLAND COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - $0.80 PREMIUM BRUSH & ROLLER WORK OVER 100FT ABOVE GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 100FT ABOVE GROUND LEVEL - $3.30 PREMIUM | $28.30 | $20.07 | $48.37 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $32.45 | $17.12 | $49.57 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: BRIDGES & DAMS - BLAST & SPRAY (MASSAC COUNTY) SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND ABOVE RECEIVE A $1.00 PER HOUR PREMIMUM | $31.00 | $15.40 | $46.40 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: BRIDGES & DAMS - BRUSH & ROLL (MASSAC COUNTY) SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND ABOVE RECEIVE A $1.00 PER HOUR PREMIMUM | $30.00 | $15.40 | $45.40 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: BRIDGES, DAMS (ALEXANDER, FRANKLIN, GALLATIN, HARDIN, JACKSON, JOHNSON, PERRY, POPE, PULASKI, RANDOLPH, SALINE, UNION, AND WILLIAMSON COUNTIES) | $35.51 | $18.78 | $54.29 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING (CRAWFORD, EFFINGHAM, JASPER, LAWRENCE, AND RICHLAND COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - $0.80 PREMIUM BRUSH & ROLLER WORK OVER 100FT ABOVE GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 100FT ABOVE GROUND LEVEL - $3.30 PREMIUM | $27.30 | $20.07 | $47.37 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: BRUSH & ROLLER OF MASTICS, CREOSOTE, KWINCH KOATE, AND COAL TAR EPOXY (EDWARDS, WABASH, AND WHITE COUNTIES) | $28.60 | $17.63 | $46.23 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: BRUSH, ROLLER AND PAPERHANGER (EDWARDS, WABASH, AND WHITE COUNTIES) | $27.60 | $17.63 | $45.23 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: DRYWALL FINISHERS AND PLASTERERS (EDWARDS, WABASH, AND WHITE COUNTIES) | $27.85 | $17.63 | $45.48 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: INDUSTRIAL - BLAST & SPRAY (MASSAC COUNTY) 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND ABOVE RECEIVE A $1.00 PER HOUR PREMIMUM | $26.25 | $15.40 | $41.65 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: INDUSTRIAL - BRUSH & ROLL (MASSAC COUNTY) 3500 PSI RECEIVE A $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND ABOVE RECEIVE A $1.00 PER HOUR PREMIMUM | $25.25 | $15.40 | $40.65 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: JOURNEYMAN (ALEXANDER, FRANKLIN, GALLATIN, HARDIN, JACKSON, JOHNSON, PERRY, POPE, PULASKI, RANDOLPH, SALINE, UNION, AND WILLIAMSON COUNTIES) | $33.21 | $18.78 | $51.99 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: JOURNEYMAN (CLAY, HAMILTON, JEFFERSON, MARION, AND WAYNE COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM JOURNEYMAN WORK ON BRIDGES, GRAIN ELEVATORS, WATER, RADIO & TELEVISION TOWERS, STACKS, WASTE WATER PLANTS, AND WATER TREATMENT PLANTS - $3.10 PREMIUM | $26.50 | $19.01 | $45.51 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: SPRAY OF MASTICS, CREOSOTES, KWINCH KOATE, AND COAL TAR EPOXY (EDWARDS, WABASH, AND WHITE COUNTIES) | $29.60 | $17.63 | $47.23 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, AND STEAM CLEANING (EDWARDS, WABASH, AND WHITE COUNTIES) | $28.60 | $17.63 | $46.23 | IL20260016 Heavy, Highway |
| Alexander + 27 more | PAINTER: TAPING (ALL KINDS) (CLAY, HAMILTON, JEFFERSON, MARION, AND WAYNE COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM JOURNEYMAN WORK ON BRIDGES, GRAIN ELEVATORS, WATER, RADIO & TELEVISION TOWERS, STACKS, WASTE WATER PLANTS, AND WATER TREATMENT PLANTS - $3.10 PREMIUM | $27.30 | $19.01 | $46.31 | IL20260016 Heavy, Highway |
| Alexander + 40 more | PAINTER (ALEXANDER, FRANKLIN, GALLATIN, HARDIN, JACKSON, JOHNSON, PERRY, POPE, PULASKI, SALINE, UNION, AND WILLIAMSON COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.37 | $20.02 | $51.39 | IL20260002 Building |
| Alexander + 40 more | PAINTER (CHAMPAIGN, COLES, CUMBERLAND, DOUGLAS, AND VERMILION COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $35.29 | $14.50 | $49.79 | IL20260002 Building |
| Alexander + 40 more | PAINTER (CHRISTIAN COUNTY) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $32.23 | $20.58 | $52.81 | IL20260002 Building |
| Alexander + 40 more | PAINTER (FAYETTE COUNTY) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.25 | $17.12 | $48.37 | IL20260002 Building |
| Alexander + 40 more | PAINTER (MASSAC COUNTY) SPRAY, SANDBLASTING AND WATER BLAST UNITS WITH 3500 PSI RECEIVE $.50 PER HOUR PREMIMUM. ALL WORK FORTY FEET AND ABOVE RECEIVE $1.00 PER HOUR PREMIMUM | $24.50 | $15.50 | $40.00 | IL20260002 Building |
| Alexander + 40 more | PAINTER: BLASTING, SPRAYING & PRESSURE WASHING (CLARK, CRAWFORD, EDGAR, EFFINGHAM, JASPER, LAWRENCE, AND RICHLAND COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - $0.80 PREMIUM BRUSH & ROLLER WORK OVER 100FT ABOVE GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 100FT ABOVE GROUND LEVEL - $3.30 PREMIUM | $28.37 | $21.05 | $49.42 | IL20260002 Building |
| Alexander + 40 more | PAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING (CLARK, CRAWFORD, EDGAR, EFFINGHAM, JASPER, LAWRENCE, AND RICHLAND COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - $0.80 PREMIUM BRUSH & ROLLER WORK OVER 100FT ABOVE GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 100FT ABOVE GROUND LEVEL - $3.30 PREMIUM | $27.37 | $21.05 | $48.42 | IL20260002 Building |
| Alexander + 40 more | PAINTER: BRUSH & ROLLER OF MASTICS, CREOSOTES, KWINCH KOATE, AND COAL TAR EPOXY (EDWARDS, WABASH, AND WHITE COUNTIES) | $28.30 | $20.08 | $48.38 | IL20260002 Building |
| Alexander + 40 more | PAINTER: BRUSH AND ROLLER (DE WITT, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 | IL20260002 Building |
| Alexander + 40 more | PAINTER: BRUSH, ROLLER AND PAPERHANGER (EDWARDS, WABASH, AND WHITE COUNTIES) | $27.30 | $20.08 | $47.38 | IL20260002 Building |
| Alexander + 40 more | PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260002 Building |
| Alexander + 40 more | PAINTER: BRUSH, ROLLER, TAPER (HAND), PAPERHANGER, SWING STAGE, SCAFFOLD OVER 30FT., EPOXY, TOXIC MATERIAL, SANDBLAST, SPRAY, MACHINE TAPING, AND RESIDENTIAL WORK NOT TO EXCEED TWO FAMILIES PER STRUCTURE (IROQUOIS AND KANKAKEE COUNTIES) | $41.00 | $27.80 | $68.80 | IL20260002 Building |
| Alexander + 40 more | PAINTER: DRYWALL FINISHERS AND PLASTERERS (EDWARDS, WABASH, AND WHITE COUNTIES) | $27.55 | $20.08 | $47.63 | IL20260002 Building |
| Alexander + 40 more | PAINTER: JOURNEYMAN (CLAY, HAMILTON, JEFFERSON, MARION, AND WAYNE COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $26.50 | $19.01 | $45.51 | IL20260002 Building |
| Alexander + 40 more | PAINTER: PAPERHANGER AND DRYWALL TAPING (DE WITT, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 | IL20260002 Building |
| Alexander + 40 more | PAINTER: SPRAY AND SANDBLASTING (DE WITT, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $31.25 | $22.30 | $53.55 | IL20260002 Building |
| Alexander + 40 more | PAINTER: SPRAY OF MASTICS, CREOSOTES, KWINCH KOATE, AND COAL TAR EPOXY (EDWARDS, WABASH, AND WHITE COUNTIES) | $29.55 | $20.08 | $49.63 | IL20260002 Building |
| Alexander + 40 more | PAINTER: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST, AND STEAM CLEANING (EDWARDS, WABASH, AND WHITE COUNTIES) | $28.30 | $20.08 | $48.38 | IL20260002 Building |
| Alexander + 40 more | PAINTER: TAPING (ALL KINDS) (CLAY, HAMILTON, JEFFERSON, MARION, AND WAYNE COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $27.30 | $19.01 | $46.31 | IL20260002 Building |
| Bond | PAINTER: BRUSH AND DRYWALL FINISHING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.39 | $21.58 | $52.97 | IL20260052 Residential |
| Bond + 10 more | PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $32.45 | $17.12 | $49.57 | IL20260017 Heavy, Highway |
| Boone | PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 | $74.56 | IL20260053 Residential |
| Bureau + 12 more | PAINTER, EXCLUDING DRYWALL FINISHING: BRUSH (BUREAU, FORD, LA SALLE, LIVINGSTON, AND PUTNAM COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260026 Residential |
| Bureau + 12 more | PAINTER: BRUSH ONLY, EXCLUDING DRYWALL FINISHING: NEW APARTMENTS AND CONDOMINIUMS THREE STORIES AND OVER (VERMILION COUNTY) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $35.29 | $14.50 | $49.79 | IL20260026 Residential |
| Bureau + 12 more | PAINTER: BRUSH ONLY: EXCLUDING DRYWALL FINISHING (IROQUOIS COUNTY) | $41.00 | $27.80 | $68.80 | IL20260026 Residential |
| Bureau + 12 more | PAINTER: BRUSH ONLY: EXCLUDING DRYWALL FINISHING (JO DAVIESS AND LEE COUNTIES) | $45.15 | $29.41 | $74.56 | IL20260026 Residential |
| Bureau + 12 more | PAINTER: BRUSH ONLY: EXCLUDING DRYWALL FINISHING (MARSHALL, STARK, AND WOODFORD COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260026 Residential |
| Bureau + 12 more | PAINTER: BRUSH: EXCLUDING DRYWALL FINISHING (CARROLL AND WHITESIDE COUNTIES) | $30.00 | $17.37 | $47.37 | IL20260026 Residential |
| Bureau + 45 more | PAINTER (ADAMS, BROWN, CASS, LOGAN, MENARD, MORGAN, AND SCOTT COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $32.23 | $20.58 | $52.81 | IL20260001 Building |
| Bureau + 45 more | PAINTER (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, PIKE, AND WASHINGTON COUNTIES) | $31.25 | $17.12 | $48.37 | IL20260001 Building |
| Bureau + 45 more | PAINTER (RANDOLPH COUNTY) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.21 | $18.78 | $49.99 | IL20260001 Building |
| Bureau + 45 more | PAINTER: BRUSH AND ROLLER (CARROLL, HENDERSON, HENRY, KNOX, MERCER, ROCK ISLAND, WARREN, AND WHITESIDE COUNTIES) | $30.00 | $17.37 | $47.37 | IL20260001 Building |
| Bureau + 45 more | PAINTER: BRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY (DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES) | $53.05 | $27.63 | $80.68 | IL20260001 Building |
| Bureau + 45 more | PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260001 Building |
| Bureau + 45 more | PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 | $74.56 | IL20260001 Building |
| Bureau + 45 more | PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260001 Building |
| Bureau + 45 more | PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING (CARROLL, HENDERSON, HENRY, KNOX, MERCER, ROCK ISLAND, WARREN, AND WHITESIDE COUNTIES) | $30.50 | $17.37 | $47.87 | IL20260001 Building |
| Bureau + 9 more | PAINTER: BRIDGES (CARROLL, HENRY, ROCK ISLAND, AND WHITESIDE COUNTIES) | $32.00 | $17.37 | $49.37 | IL20260012 Heavy, Highway |
| Bureau + 9 more | PAINTER: BRUSH AND ROLLER (CARROLL, HENRY, ROCK ISLAND, AND WHITESIDE COUNTIES) | $30.00 | $17.37 | $47.37 | IL20260012 Heavy, Highway |
| Bureau + 9 more | PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260012 Heavy, Highway |
| Bureau + 9 more | PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 | $74.56 | IL20260012 Heavy, Highway |
| Bureau + 9 more | PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING (CARROLL, HENRY, ROCK ISLAND, AND WHITESIDE COUNTIES) | $30.50 | $17.37 | $47.87 | IL20260012 Heavy, Highway |
| Champaign | PAINTER, INCLUDING DRYWALL FINISHING: NEW APARTMENTS AND CONDOMINIUMS THREE STORIES AND OVER PREMIMUM | $35.29 | $14.50 | $49.79 | IL20260058 Residential |
| Champaign + 23 more | PAINTER (ADAMS, BROWN, CASS, LOGAN, MENARD, MORGAN, AND SCOTT COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $32.23 | $20.58 | $52.81 | IL20260015 Heavy, Highway |
| Champaign + 23 more | PAINTER (CHAMPAIGN, COLES, CUMBERLAND, DOUGLAS, AND VERMILION COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $35.29 | $14.50 | $49.79 | IL20260015 Heavy, Highway |
| Champaign + 23 more | PAINTER (SANGAMON COUNTY) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $32.23 | $20.58 | $52.81 | IL20260015 Heavy, Highway |
| Champaign + 23 more | PAINTER: BLASTING, SPRAYING & PRESSURE WASHING (CLARK AND EDGAR COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - $0.80 PREMIUM BRUSH & ROLLER WORK OVER 100FT ABOVE GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM | $28.37 | $21.05 | $49.42 | IL20260015 Heavy, Highway |
| Champaign + 23 more | PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $32.45 | $17.12 | $49.57 | IL20260015 Heavy, Highway |
| Champaign + 23 more | PAINTER: BRUSH & ROLLER AND WALL COVERING DRYWALL PREPARING (CLARK AND EDGAR COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM BRUSH & ROLLER WORK OVER 30FT ABOVE GROUND OR FLOOR LEVEL - $0.80 PREMIUM BRUSH & ROLLER WORK OVER 100FT ABOVE GROUND OR FLOOR LEVEL - $1.80 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 30FT ABOVE GROUND LEVEL - $2.30 PREMIUM BLASTING, SPRAYING & PRESSURE WORK OVER 100FT ABOVE GROUND LEVEL - $3.30 PREMIUM | $27.37 | $21.05 | $48.42 | IL20260015 Heavy, Highway |
| Champaign + 23 more | PAINTER: BRUSH AND ROLLER (DE WITT, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 | IL20260015 Heavy, Highway |
| Champaign + 23 more | PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260015 Heavy, Highway |
| Champaign + 23 more | PAINTER: PAPERHANGING AND DRYWALL TAPING (DE WITT, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM $1.00 PREMIUM | $30.50 | $22.30 | $52.80 | IL20260015 Heavy, Highway |
| Champaign + 23 more | PAINTER: SPRAY AND SANDBLASTING (DE WITT, MACON, MOULTRIE, PIATT, AND SHELBY COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $31.25 | $22.30 | $53.55 | IL20260015 Heavy, Highway |
| Christian | PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $29.73 | $20.58 | $50.31 | IL20260059 Residential |
| Clay | PAINTER: REPAINT EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $23.60 | $19.01 | $42.61 | IL20260021 Residential |
| Clinton | PAINTER: BRUSH AND DRYWALL FINISHING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.39 | $21.58 | $52.97 | IL20260061 Residential |
| Coles | PAINTER (DRYWALL FINISHING), INCLUDING BRUSH AND TAPER: NEW APARTMENTS AND CONDOMINIUMS THREE STORIES AND OVER | $35.29 | $14.50 | $49.79 | IL20260062 Residential |
| Cook | PAINTER (INCLUDING TAPER) | $53.05 | $33.91 | $86.96 | IL20260009 Building, Heavy, Highway, Residential |
| Crawford | PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $27.30 | $20.07 | $47.37 | IL20260063 Residential |
| Cumberland | PAINTER (DRYWALL FINISHING/TAPING ONLY), INCLUDING BRUSH AND TAPER: NEW APARTMENTS AND CONDOMINIUMS THREE STORIES AND OVER | $35.29 | $14.50 | $49.79 | IL20260064 Residential |
| De Kalb | PAINTER: BRUSH ONLY: INCLUDING DRYWALL FINISHER (DE KALB COUNTY) | $51.55 | $26.68 | $78.23 | IL20260065 Residential |
| De Kalb + 7 more | PAINTER: BRUSH ONLY (LAKE AND WILL COUNTIES) | $53.05 | $33.91 | $86.96 | IL20260011 Heavy, Highway |
| De Kalb + 7 more | PAINTER: BRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY (DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES) | $53.05 | $27.63 | $80.68 | IL20260011 Heavy, Highway |
| De Kalb + 7 more | PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 | $74.56 | IL20260011 Heavy, Highway |
| Douglas, Edgar, Clark | PAINTER (CLARK AND EDGAR COUNTIES) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $27.30 | $20.07 | $47.37 | IL20260060 Residential |
| Douglas, Edgar, Clark | PAINTER: BRUSH ONLY, INCLUDING DRYWALL FINISHER AND TAPER: NEW APARTMENTS AND CONDOMINIUMS THREE STORIES AND OVER (DOUGLAS COUNTY) EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $35.29 | $14.50 | $49.79 | IL20260060 Residential |
| Du Page + 6 more | PAINTER: BRUSH, DECORATOR, AND PAPERHANGER (GRUNDY, LAKE, AND WILL COUNTIES) | $53.05 | $33.91 | $86.96 | IL20260008 Building, Residential |
| Du Page + 6 more | PAINTER: BRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY (DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES) | $53.05 | $27.63 | $80.68 | IL20260008 Building, Residential |
| Edwards | PAINTER: BRUSH, ROLLER AND PAPERHANGER | $27.30 | $18.98 | $46.28 | IL20260067 Residential |
| Edwards | PAINTER: DRYWALL FINISHERS AND PLASTERERS | $27.55 | $18.98 | $46.53 | IL20260067 Residential |
| Edwards | PAINTER: SPRAY | $28.30 | $18.98 | $47.28 | IL20260067 Residential |
| Effingham | PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $27.30 | $20.07 | $47.37 | IL20260068 Residential |
| Fayette | PAINTER: BRUSH AND DRYWALL FINISHING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.39 | $21.58 | $52.97 | IL20260069 Residential |
| Ford + 9 more | PAINTER (GRUNDY COUNTY) | $53.05 | $33.91 | $86.96 | IL20260013 Heavy, Highway |
| Ford + 9 more | PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260013 Heavy, Highway |
| Ford + 9 more | PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260013 Heavy, Highway |
| Franklin | PAINTER: BRUSH, SPRAY, DRYWALL FINISHING, AND TAPERS EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $24.52 | $18.78 | $43.30 | IL20260050 Residential |
| Fulton + 9 more | PAINTER: BRIDGES (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES) | $32.00 | $17.37 | $49.37 | IL20260014 Heavy, Highway |
| Fulton + 9 more | PAINTER: BRUSH AND ROLLER (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES) | $30.00 | $17.37 | $47.37 | IL20260014 Heavy, Highway |
| Fulton + 9 more | PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260014 Heavy, Highway |
| Fulton + 9 more | PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260014 Heavy, Highway |
| Fulton + 9 more | PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES) | $30.50 | $17.37 | $47.87 | IL20260014 Heavy, Highway |
| Hamilton | PAINTER: REPAINT EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $23.60 | $19.01 | $42.61 | IL20260022 Residential |
| Henry | PAINTER (HENRY COUNTY) | $30.00 | $17.37 | $47.37 | IL20260025 Residential |
| Jackson | PAINTER: BRUSH, SPRAY, DRYWALL FINISHING, AND TAPERS EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $24.52 | $18.78 | $43.30 | IL20260027 Residential |
| Jasper | PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $27.30 | $20.07 | $47.37 | IL20260028 Residential |
| Jefferson | PAINTER: REPAINT EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $23.60 | $19.01 | $42.61 | IL20260029 Residential |
| Jersey | PAINTER: BRUSH AND DRYWALL FINISHING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.39 | $21.58 | $52.97 | IL20260030 Residential |
| Johnson | PAINTER: BRUSH, SPRAY, DRYWALL FINISHING, AND TAPERS EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $24.52 | $18.78 | $43.30 | IL20260032 Residential |
| Kankakee | PAINTER: BRUSH, ROLLER, TAPER (HAND), PAPERHANGER, SWING STAGE, SCAFFOLD OVER 30FT., EPOXY, TOXIC MATERIAL, SANDBLAST, SPRAY, MACHINE TAPING, AND RESIDENTIAL WORK NOT TO EXCEED TWO FAMILIES PER STRUCTURE (IROQUOIS AND KANKAKEE COUNTIES) | $41.00 | $27.80 | $68.80 | IL20260006 Building, Residential |
| Lawrence | PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $27.30 | $20.07 | $47.37 | IL20260034 Residential |
| Macon | PAINTER: BRUSH AND ROLLER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 | IL20260005 Building, Residential |
| Macon | PAINTER: PAPERHANGING AND DRYWALL TAPING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 | IL20260005 Building, Residential |
| Macon | PAINTER: SPRAY AND SANDBLASTING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $31.25 | $22.30 | $53.55 | IL20260005 Building, Residential |
| Macoupin | PAINTER: BRUSH AND DRYWALL FINISHING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.39 | $21.58 | $52.97 | IL20260042 Residential |
| Madison, St Clair | PAINTER: BUILDING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.25 | $17.12 | $48.37 | IL20260007 Building, Residential |
| Madison, St Clair | PAINTER: RESIDENTIAL EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $29.95 | $17.12 | $47.07 | IL20260007 Building, Residential |
| Marion | PAINTER: REPAINT EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $23.60 | $19.01 | $42.61 | IL20260043 Residential |
| Massac | PAINTER | $21.50 | $15.50 | $37.00 | IL20260046 Residential |
| McLean | PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260041 Residential |
| Menard | PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $29.73 | $20.58 | $50.31 | IL20260047 Residential |
| Monroe | PAINTER: BRUSH AND DRYWALL FINISHING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $29.95 | $17.12 | $47.07 | IL20260057 Residential |
| Montgomery | PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.39 | $21.58 | $52.97 | IL20260049 Residential |
| Moultrie | PAINTER: BRUSH & ROLLER; PAPERHANGER & DRYWALL TAPING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 | IL20260056 Residential |
| Moultrie | PAINTER: SPRAY AND SANDBLASTING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $31.25 | $22.30 | $53.55 | IL20260056 Residential |
| Ogle | PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 | $74.56 | IL20260055 Residential |
| Peoria, Tazewell | PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260003 Building, Residential |
| Perry, Randolph | PAINTER: BRUSH, SPRAY, DRYWALL FINISHING, AND TAPERS EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $24.52 | $18.78 | $43.30 | IL20260054 Residential |
| Pope, Gallatin, Hardin | PAINTER: BRUSH, SPRAY, DRYWALL FINISHING, AND TAPERS EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $24.52 | $18.78 | $43.30 | IL20260066 Residential |
| Pulaski | PAINTER: BRUSH, SPRAY, DRYWALL FINISHING, AND TAPERS EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $24.52 | $18.78 | $43.30 | IL20260045 Residential |
| Richland | PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $27.30 | $20.07 | $47.37 | IL20260044 Residential |
| Rock Island | PAINTER (INCLUDES DRYWALL FINISHING) | $30.00 | $17.37 | $47.37 | IL20260048 Residential |
| Rock Island | PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $27.30 | $20.07 | $47.37 | IL20260048 Residential |
| Saline | PAINTER: BRUSH, SPRAY, DRYWALL FINISHING, AND TAPERS EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $24.52 | $18.78 | $43.30 | IL20260070 Residential |
| Sangamon | PAINTER: BUILDING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $32.23 | $20.58 | $52.81 | IL20260004 Building, Residential |
| Sangamon | PAINTER: RESIDENTIAL EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $29.73 | $20.58 | $50.31 | IL20260004 Building, Residential |
| Shelby | PAINTER: BRUSH & ROLLER; PAPERHANGER & DRYWALL TAPING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 | IL20260039 Residential |
| Shelby | PAINTER: SPRAY AND SANDBLASTING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $31.25 | $22.30 | $53.55 | IL20260039 Residential |
| Union | PAINTER: BRUSH, SPRAY, DRYWALL FINISHING, AND TAPERS EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $24.52 | $18.78 | $43.30 | IL20260037 Residential |
| Wabash | PAINTER: BRUSH, ROLLER AND PAPERHANGER | $27.30 | $18.98 | $46.28 | IL20260036 Residential |
| Wabash | PAINTER: DRYWALL FINISHERS AND PLASTERERS | $27.55 | $18.98 | $46.53 | IL20260036 Residential |
| Wabash | PAINTER: SPRAY | $28.30 | $18.98 | $47.28 | IL20260036 Residential |
| Washington | PAINTER: BRUSH AND DRYWALL FINISHING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.39 | $21.58 | $52.97 | IL20260035 Residential |
| Wayne | PAINTER: REPAINT EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $23.60 | $19.01 | $42.61 | IL20260033 Residential |
| White | PAINTER: BRUSH, ROLLER AND PAPERHANGER | $27.30 | $18.98 | $46.28 | IL20260031 Residential |
| White | PAINTER: DRYWALL FINISHERS AND PLASTERERS | $27.55 | $18.98 | $46.53 | IL20260031 Residential |
| White | PAINTER: SPRAY | $28.30 | $18.98 | $47.28 | IL20260031 Residential |
| Williamson | PAINTER: BRUSH, SPRAY, DRYWALL FINISHING, AND TAPERS EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $24.52 | $18.78 | $43.30 | IL20260024 Residential |
| Winnebago | PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 | $74.56 | IL20260010 Residential |
| Woodford | PAINTER: BRUSH ONLY: EXCLUDING DRYWALL FINISHING (MARSHALL, STARK, AND WOODFORD COUNTIES) | $40.00 | $26.90 | $66.90 | IL20260040 Residential |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Illinois trades.