Heavy, Highway construction wages: Bond + 10 more counties, Illinois
Wage determination IL20260017 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IL20260017 on July 24, 2026 · latest revision 4 · verify at sam.gov/wage-determination/IL20260017/4
BondCalhounClintonJerseyMadisonMonroeSt ClairWashingtonGreeneMacoupinMontgomery
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 4 | 2026-05-18 | diff vs rev 3 |
| rev 3 | 2026-05-17 | diff vs rev 2 |
| rev 2 | 2026-01-30 | diff vs rev 1 |
| rev 1 | 2026-01-23 | diff vs rev 0 |
| rev 0 | 2026-01-16 | original |
Current rates (rev 4)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| PILEDRIVERMAN:MACOUPIN and MONTGOMERY COUNTIES | $33.15 | $25.97 | $59.12 |
| CARPENTER:MACOUPIN and MONTGOMERY COUNTIES | $32.15 | $25.97 | $58.12 |
| PILEDRIVERMAN (GREENE COUNTY) | $35.05 | $28.57 | $63.62 |
| CARPENTER (GREENE COUNTY) | $35.05 | $28.57 | $63.62 |
| CARPENTER & PILEDRIVERMEN (CLINTON, MONROE, AND WASHINGTON COUNTIES) | $41.36 | $18.90 | $60.26 |
| CARPENTER AND PILEDRIVER (ST. CLAIR COUNTY) | $41.36 | $18.90 | $60.26 |
| CARPENTER AND PILEDRIVER (MADISON COUNTY) | $41.36 | $18.90 | $60.26 |
| CARPENTER (BOND, CALHOUN, AND JERSEY COUNTIES) | $41.36 | $18.90 | $60.26 |
| ELECTRICIAN (MONTGGOMERY COUNTY (EAST OF BUTLER GROVE, GRISHAM, HILLSBORO & RAYMOND TWPS)) | $41.00 | $20.68 | $61.68 |
| ELECTRICIAN (MACOUPIN (BARR, GIRARD, NILWOOD, NORTH & SOUTH OTTER, NORTH & SOUTH PALMYRA AAND VIRDEN TWPS), AND MONTGOMERY (BOIS D' ARC, HARVEL AND PITMAN TWPS) COUNTIES) | $39.80 | $23.08 | $62.88 |
| LINE CONSTRUCTION: LINEMAN & SUBSTATION TECH (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES) | $62.90 | $26.06 | $88.96 |
| LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (WITHOUT WINCH) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES) | $40.36 | $19.41 | $59.77 |
| LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER (WITH WINCH, MAY OPERATE DIGGERS, 5TH WHEEL TYPE TRUCKS, CRAWLER-TYPE EQUIPMENT, D-4 AND SMALLER, BACKHOE 3/4 YARD AND UNDER, RUBBER TIRE AND CRAWLER W/END LOADER, AND MAY DRIVE BUCKET TRUCK AND LIVE BOOM TYPE LINE TRUCKS) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES) | $42.85 | $20.14 | $62.99 |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT OPERATORS, DREDGES, ASPHALT SPREADING MACHINES, SCREWS ON ASPHALT SPREADING MACHINES, ALL LOCOMOTIVES, CABLE WAYS OR TOWER MACHINES, HOISTS, HYDRAULIC BACKHOES, DITCHING MACHINES, OR BACKFILLER, CHERRYPICKERS, OVERHEAD CRANES, ROLLER, STEAM OR GAS, CONCRETE PAVERS, EXCAVATOR CONCRETE BREAKERS, CONCRETE PUMPS, BULK CEMENT PLANTS, CEMENT PUMPS, DERRICKTYPE DRILLS, BOAT OPERATORS, MOTOR GRADERS OR PUSHCATS, SCOOPS OR TOUMAPULLS, BULLDOZERS, ENDLOADERS OR FORK LIFTS, POWER BLADE OR ELEVATING GRADERS, WINCH CATS, BOOM OR WINCH TRUCKS OR BOOM TRACTORS, PIPE WRAPPING OR PAINTING MACHINES, ASPHALT PLANT ENGINEER, JOURNEYMAN LUBRICATING ENGINEER, DRILLS (OTHER THAN DERRICK TYPE), MUD JACKS, OR WELL DRILLING MACHINES, BORING MACHINES OR TRACK JACKS, MIXERS, CONVEYORS (TWO), AIR COMPRESSORS (TWO) WATER PUMPS, REGARDLESS OF SIZE (TWO), WELDING MACHINES (TWO), SIPHONS OR JETS (TWO), WINCH HEAD OR APPARATUSES (TWO), LIGHT PLANTS (TWO), WATERBLASTERS (TWO), ALL TRACTORS, REGARDLESS OF SIZE (STRAIGHT TRACTOR ONLY), FIREMAN ON STATIONARY BOILERS, AUTOMATIC ELEVATORS, FORM GRADING MACHINES, FINISHING MACHINES, POWER SUB-GRADER OR RIBBON MACHINES, LONGITUDINAL FLOATS, DISTRIBUTOR OPERATORS ON TRUCKS, WINCH HEADS OR APPARATUSES (ONE), MOBIL TRACK AIR AND HEATERS (TWO TO FIVE), HEAVY EQUIPMENT GREASER, RELIEF OPERATOR, ASSISTANT MASTER MECHANIC AND HEAVY DUTY MECHANIC, CONCRETE SAWS OF ALL TYPES AND SIZES WITH THEIR ATTACHMENTS, GOBHOPPERS, EXCAVATORS ALL SIZES, THE REPAIR, GREASING, AND FUELING OF ALL DIESEL HAMMERS, THE OPERATION, SET-UP AND CLEANING OFBIDWELLS, CONCRETE PLACEMENT BOOMS, THE ALTERATIONS, REPAIR OF ALL BARGES, WATER BLASTERS OF ALL SIZES AND THEIR CLUTCHES, MOBILE LIFTS, HYDRAULIC JACKS WHERE USED FOR HOISTING, DIESEL OR GAS POWERED FLASHING SINGS USED FOR TRAFFIC CONTROL, MICRO PAVERS, LOG SKIDERS, ICEOLATORS USED ON AND OFF OF PIPELINE, CONDOR CRANES, DRILL RIGS OF ALL SIZES, BOW BOATS, SURVEY BOATS, ROSS CARRIERS, BOB-CATS AND ALL THEIR ATTACHMENTS, SKID STEER LOADERS AND ALL THEIR ATTACHMENTS, CRETER CRANE, DIRECT DRIVE ELECTRIC MOTORS THE BOLTING AND UNBOLTING THE ADJUSTING AND SHIMMING, (DEWATERINGJOBS, WHIRLEY CRANE, CONVEYOR BELTS) ETC., BATCH PLANTS (ALL SIZES), ROTO MILLS, CONVEYORS SYSTEMS OF ANY SIZE AND ANY CONFIGURATION, HYDROSEEDERS AND STRAWBLOWERS ALL SIZES, OPERATION, REPAIR, SERVICE OF ALL VIBRATORY HAMMERS, ALL POWER PACS AND THEIR CONTROLS REGARDLESS OF LOCATION, CURTAINS OR BRUSH BURNING MACHINES, STUMP CUTTER MACHINES, GROUT MACHINES REGARDLESS OF SIZE, NAIL LAUNCHERS WHEN MOUNTED ON A MACHINE OR SELF-PROPELLED, CON-COVER MACHINES, GOLDHOFER AND SIMILAR S.P.M.T. (SELF-PROPELLED MODULAR TRANSPMIERS) HEAVY TRANSPORT UNITS AND ALL OPERATORS (EXCEPT THOSE LISTED BELOW) | $42.45 | $34.95 | $77.40 |
| POWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 12 LICENSED BOAT PILOT | $45.45 | $34.95 | $80.40 |
| POWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 11 MASTER MECHANIC | $44.45 | $34.95 | $79.40 |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT | $45.45 | $34.95 | $80.40 |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC | $44.45 | $34.95 | $79.40 |
| POWER EQUIPMENT OPERATOR GROUP 10 CERTIFIED CRANE OPERATORS 17.5 TONS AND ABOVE, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $46.75 | $34.95 | $81.70 |
| POWER EQUIPMENT OPERATOR GROUP 12 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $50.20 | $39.10 | $89.30 |
| POWER EQUIPMENT OPERATOR GROUP 11 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $49.20 | $39.10 | $88.30 |
| POWER EQUIPMENT OPERATOR GROUP 09 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $48.20 | $39.10 | $87.30 |
| POWER EQUIPMENT OPERATOR GROUP 06 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $49.75 | $39.10 | $88.85 |
| POWER EQUIPMENT OPERATOR GROUP 05 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $41.65 | $39.10 | $80.75 |
| POWER EQUIPMENT OPERATOR GROUP 04 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $41.65 | $39.10 | $80.75 |
| POWER EQUIPMENT OPERATOR GROUP 03 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $41.59 | $39.10 | $80.69 |
| POWER EQUIPMENT OPERATOR GROUP 02 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $46.07 | $39.10 | $85.17 |
| POWER EQUIPMENT OPERATOR GROUP 01 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $47.20 | $39.10 | $86.30 |
| IRONWORKER (GREENE (NORTHERN HALF), MACOUPIN (NORTH OF SUMMERVILLE), AND MONTGOMERY (NORTH OF LITCHFIELD & HILLSBORO) COUNTIES) | $37.60 | $32.94 | $70.54 |
| IRONWORKER (BOND, CALHOUN, CLINTON, GREENE (SOUTHERN HALF), JERSEY, MACOUPIN (SUMMERVILLE & SOUTH THEREOF), MADISON, MONROE, MONTGOMERY (LITCHFIELD, HILLSBORO, & SOUTH THEREOF), ST. CLAIR, AND WASHINGTON COUNTIES) | $41.65 | $31.18 | $72.83 |
| IRONWORKER (BRIDGES, LOCKS, AND DAMS ON THE MISSISSIPPI RIVER) | $44.27 | $31.65 | $75.92 |
| LABORER GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY (SOUTHWEST)) | $33.85 | $32.38 | $66.23 |
| LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER; MASON AND PLASTERER TENDER (MADISON COUNTY (SOUTHWEST)) | $32.85 | $32.38 | $65.23 |
| LABORER GROUP 1 GENERAL LABORER (MADISON COUNTY (SOUTHWEST)) | $32.35 | $32.38 | $64.73 |
| LABORER GROUP 3 DYNAMITE AND POWDER MEN. (MADISON COUNTY (GLEN CARBON)) | $33.85 | $32.38 | $66.23 |
| LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS; ASBESTOS ABATEMENT WORKER, HAZARDOUS WASTE WORKER (MADISON COUNTY (GLEN CARBON)) | $32.85 | $32.38 | $65.23 |
| LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY (GLEN CARBON)) | $32.35 | $32.38 | $64.73 |
| LABORERS, GROUP 3 DYNAMITE MAN (ST CLAIR COUNTY (EAST ST. LOUIS,ALCOA, BROOKLYN,CAHOKIA, CASEYVILLE,CENTREVILLE, DUPO, FAIRMONT CITY, FRENCH VILLAGE, MIDWAY, MAPLEWOOD, NATIONAL CITY)) | $36.88 | $29.35 | $66.23 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER, HOD CARRIER (ST CLAIR COUNTY (EAST ST. LOUIS,ALCOA, BROOKLYN,CAHOKIA, CASEYVILLE,CENTREVILLE, DUPO, FAIRMONT CITY, FRENCH VILLAGE, MIDWAY, MAPLEWOOD, NATIONAL CITY)) | $35.88 | $29.35 | $65.23 |
| LABORERS, GROUP 1 GENERAL LABORER (ST CLAIR COUNTY (EAST ST. LOUIS,ALCOA, BROOKLYN,CAHOKIA, CASEYVILLE,CENTREVILLE, DUPO, FAIRMONT CITY, FRENCH VILLAGE, MIDWAY, MAPLEWOOD, NATIONAL CITY)) | $35.38 | $29.35 | $64.73 |
| LABORERS, GROUP 3 DYNAMITE MAN (ST CLAIR (O'FALLON, SCOTT AIR FORCE BASE, SHILOH, LEBANON & VINCINITY), CLINTON (TRENTON & VICINITY), AND MADISON (TROY) COUNTIES) | $36.88 | $29.35 | $66.23 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST CLAIR (O'FALLON, SCOTT AIR FORCE BASE, SHILOH, LEBANON & VINCINITY), CLINTON (TRENTON & VICINITY), AND MADISON (TROY) COUNTIES) | $35.88 | $29.35 | $65.23 |
| LABORERS, GROUP 1 GENERAL LABORER (ST CLAIR (O'FALLON, SCOTT AIR FORCE BASE, SHILOH, LEBANON & VINCINITY), CLINTON (TRENTON & VICINITY), AND MADISON (TROY) COUNTIES) | $35.38 | $29.35 | $64.73 |
| LABORER GROUP 3 DYNAMITE AND POWDER MEN. (MADISON COUNTY (ST. JACOB)) | $36.88 | $29.35 | $66.23 |
| LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (MADISON COUNTY (ST. JACOB)) | $35.88 | $29.35 | $65.23 |
| LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY (ST. JACOB)) | $35.38 | $29.35 | $64.73 |
| LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (MONROE COUNTY) | $34.31 | $31.92 | $66.23 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MONROE COUNTY) | $33.31 | $31.92 | $65.23 |
| LABORERS, GROUP 1 GENERAL LABORER (MONROE COUNTY) | $32.81 | $31.92 | $64.73 |
| LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (BOND (GREENEVILLE), CALHOUN (HARDIN), GREENE (ROADHOUSE), JERSEY (JERSEYVILLE), AND MADISON (ALTON) COUNTIES) | $34.34 | $27.89 | $62.23 |
| LABORERS, GROUP 2ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND (GREENEVILLE), CALHOUN (HARDIN), GREENE (ROADHOUSE), JERSEY (JERSEYVILLE), AND MADISON (ALTON) COUNTIES) | $33.34 | $27.89 | $61.23 |
| LABORERS, GROUP 1 GENERAL LABORER (BOND (GREENEVILLE), CALHOUN (HARDIN), GREENE (ROADHOUSE), JERSEY (JERSEYVILLE), AND MADISON (ALTON) COUNTIES) | $32.84 | $27.89 | $60.73 |
| LABORER GROUP 3 DYNAMITE AND POWDER MEN. (JERSEY COUNTY (JERSEYVILLE)) | $34.34 | $27.89 | $62.23 |
| LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (JERSEY COUNTY (JERSEYVILLE)) | $33.34 | $27.89 | $61.23 |
| LABORER GROUP 1 GENERAL LABORERS. (JERSEY COUNTY (JERSEYVILLE)) | $32.84 | $27.89 | $60.73 |
| LABORER GROUP 3 DYNAMITE AND POWDER MEN. (GREENE COUNTY (ROADHOUSE)) | $34.34 | $27.89 | $62.23 |
| LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (GREENE COUNTY (ROADHOUSE)) | $33.34 | $27.89 | $61.23 |
| LABORER GROUP 1 GENERAL LABORERS. (GREENE COUNTY (ROADHOUSE)) | $32.84 | $27.89 | $60.73 |
| LABORER GROUP 3 DYNAMITE AND POWDER MEN. (CALHOUN COUNTY (HARDIN)) | $34.34 | $27.89 | $62.23 |
| LABORER GROUP 2 BRICK MASON AND PLASTERER TENDERS. (CALHOUN COUNTY (HARDIN)) | $33.34 | $27.89 | $61.23 |
| LABORER GROUP 1 GENERAL LABORERS. (CALHOUN COUNTY (HARDIN)) | $32.84 | $27.89 | $60.73 |
| LABORER: GROUP 3 :: CALHOUN COUNTY (Hardin) LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite and Powder Men | $34.34 | $27.89 | $62.23 |
| LABORER: GROUP 2 :: CALHOUN COUNTY (Hardin) LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite and Powder Men | $33.34 | $27.89 | $61.23 |
| LABORER: GROUP 1 :: CALHOUN COUNTY (Hardin) LABORERS CLASSIFICATIONS GROUP 1 - General Laborers. GROUP 2 - Brick Mason and Plasterer Tenders GROUP 3 - Dynamite and Powder Men | $32.84 | $27.89 | $60.73 |
| LABORERS, GROUP 3 DYNAMITE MAN AND POWDER MAN (MADISON COUNTY (WOOD RIVER)) | $35.64 | $30.59 | $66.23 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY (WOOD RIVER)) | $34.64 | $30.59 | $65.23 |
| LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY (WOOD RIVER)) | $34.14 | $30.59 | $64.73 |
| LABORERS, GROUP 3 DYNAMITE MAN (MADISON COUNTY (SOUTHEAST)) | $34.93 | $27.30 | $62.23 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY (SOUTHEAST)) | $33.93 | $27.30 | $61.23 |
| LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY (SOUTHEAST)) | $33.43 | $27.30 | $60.73 |
| LABORERS, GROUP 3 DYNAMITE MAN (MADISON COUNTY (GRANITE CITY AND VICINITY)) | $35.08 | $27.30 | $62.38 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (MADISON COUNTY (GRANITE CITY AND VICINITY)) | $34.08 | $27.30 | $61.38 |
| LABORERS, GROUP 1 GENERAL LABORER (MADISON COUNTY (GRANITE CITY AND VICINITY)) | $33.58 | $27.30 | $60.88 |
| LABORER: GROUP 2 BRICK MASON AND PLASTERER TENDERS. MADISON COUNTY (EDWARDSVILLE, MARINE, AND LIVINGSTON) | $34.08 | $27.30 | $61.38 |
| LABORER GROUP 3 BRICK MASON AND PLASTERER TENDERS. (MADISON COUNTY (EDWARDSVILLE, MARINE, AND LIVINGSTON)) | $35.08 | $27.30 | $62.38 |
| LABORER GROUP 1 GENERAL LABORERS. (MADISON COUNTY (EDWARDSVILLE, MARINE, AND LIVINGSTON)) | $33.58 | $27.30 | $60.88 |
| LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR COUNTY (SOUTH)) | $35.64 | $30.59 | $66.23 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR COUNTY (SOUTH)) | $34.64 | $30.59 | $65.23 |
| LABORERS, GROUP 1 GENERAL LABORER (ST. CLAIR COUNTY (SOUTH)) | $34.14 | $30.59 | $64.73 |
| HOD CARRIER (ST. CLAIR COUNTY (BELLEVILLE)) | $34.14 | $30.59 | $64.73 |
| LABORERS, GROUP 3 DYNAMITE AND POWDER MAN (CLINTON COUNTY (CARLYLE)) | $32.50 | $33.73 | $66.23 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (CLINTON COUNTY (CARLYLE)) | $31.50 | $33.73 | $65.23 |
| LABORERS, GROUP 1 GENERAL LABORER (CLINTON COUNTY (CARLYLE)) | $31.00 | $33.73 | $64.73 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND COUNTY (GREENVILLE)) | $30.15 | $35.08 | $65.23 |
| LABORERS, GROUP 1 GENERAL LABORER (BOND COUNTY (GREENVILLE)) | $29.65 | $35.08 | $64.73 |
| LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR (CLASS I, ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES) | $56.61 | $24.20 | $80.81 |
| LINE CONSTRUCTION: GROUNDMAN (CLASS A) (MACOUPIN (TOWNSHIPS OF SCOTTVILLE, NORTH PALMYRA, NORTH OTTER, VIRDEN, GIRARD, BARR, SOUTH PALMYRA, SOUTH OTTER, AND NILWOOD) AND MONTGOMERY (TOWNSHIPS OF BOIS D'ARC, PITMAN, AND HARVEL) COUNTIES) | $38.38 | $18.82 | $57.20 |
| LINE CONSTRUCTION: LINEMAN (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNTIES) | $64.83 | $29.01 | $93.84 |
| LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNTIES) | $46.03 | $20.60 | $66.63 |
| LINE CONSTRUCTION: GROUNDMAN EQUIPMENT OPERATOR (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNT | $56.38 | $25.23 | $81.61 |
| LINE CONSTRUCTION: GROUNDMAN (BOND (WESTSIDE), CLINTON, GREENE (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT NORTH 1/3 & SOUTHWEST CORNER), MADISON (EXCEPT EAST ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (EAST OF ROUNDTREE, IRVING & EAST FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, AND WASHINGTON (OKAWVILLE & VENEDY TWPS.) COUNTIES) | $42.10 | $18.84 | $60.94 |
| ELECTRICIAN (BOND (WESTERN HALF), CLINTON (EXCLUDES HUEY, HOFFMAN, & VIC.), MACOUPIN (EXCLUDES BRIGHTON TWP., ATHENVILLE, SCOTTVILLE, GIRARD & AREA N. THEREOF), MADISON (EXCLUDES ALTON, E. ALTON, HARTFORD & WOOD RIVER), MONROE, MONTGOMERY (WEST OF BUTLER GROVE, GRISHAM, HILLSBOROUGH & RAYMOND TWPS), ST. CLAIR AND WASHINGTON (VENEDY TWP) COUNTIES) | $52.41 | $30.27 | $82.68 |
| LINE CONSTRUCTION: LINEMAN; AND LINEMAN HOLE BORING MACHINE OPERATOR (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $66.70 | $30.84 | $97.54 |
| LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER WO/WINCH (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $37.67 | $22.42 | $60.09 |
| LINE CONSTRUCTION: GROUNDMAN - TRUCK DRIVER W/WINCH (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $42.66 | $23.87 | $66.53 |
| LINE CONSTRUCTION: GROUNDMAN (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $36.67 | $22.13 | $58.80 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $57.12 | $28.06 | $85.18 |
| LINE CONSTRUCTION: BLASTER (CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES) | $66.70 | $30.84 | $97.54 |
| ELECTRICIAN (CALHOUN, GREEN, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND MADISON (ALTON, E. ALTON, HARTFORD & WOOD RIVER) COUNTIES) | $54.53 | $29.46 | $83.99 |
| LABORERS, GROUP 3 DYNAMITE MAN (BOND COUNTY (GREENVILLE)) | $31.15 | $35.08 | $66.23 |
| LINE CONSTRUCTION: HEAVY - EQUIPMENT OPERATOR CLASS I (ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT | $52.13 | $23.97 | $76.10 |
| LINE CONSTRUCTION: GROUNDMAN - EQUIPMENT OPERATOR CLASS II (ALL OTHER EQUIPMENT) (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND | $46.49 | $22.33 | $68.82 |
| LINE CONSTRUCTION: GROUNDMAN - CLASS A (ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN, FAYETTE (EXCLUDES PORTION NORTH AVENA), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (EXCEPT RED BUD TWPS), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON COUNTIES; CLARK, COLES (SOUTHERN HALF), CUMBERLAND, MOULTRIE (WHITLEY TWP), AND SHELBY (EXCEPT WEST OF HOLLAND, PRAIRIE, RICHLAND, & WINDSOR TWPS) COU | $38.18 | $19.92 | $58.10 |
| ELECTRICIAN (BOND (EASTERN HALF), CLINTON (HUEY, HOFFMAN, & VICINITY), AND WASHINGTON (EXCEPT VENEDY TWP) COUNTIES) | $52.14 | $29.14 | $81.28 |
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $46.25 | $34.95 | $81.20 |
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $46.25 | $34.95 | $81.20 |
| POWER EQUIPMENT OPERATOR: GROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES | $45.60 | $34.95 | $80.55 |
| POWER EQUIPMENT OPERATOR: GROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT | $45.30 | $34.95 | $80.25 |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $45.00 | $34.95 | $79.95 |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT | $45.00 | $34.95 | $79.95 |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $44.45 | $34.95 | $79.40 |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS | $44.45 | $34.95 | $79.40 |
| POWER EQUIPMENT OPERATOR: GROUP 04 FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILER; HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE OVER 65 TONS CAPACITY; CONCRETE PLANT OILER AND BLACK TOP PLANT OILER | $43.45 | $34.95 | $78.40 |
| POWER EQUIPMENT OPERATOR: GROUP 04 FIREMAN ON WHIRLIES AND HEAVY EQUIPMENT OILERS, TRUCK CRANES, DREDGES, MONIGANS, LARGE CRANES - (OVER 65-TON RATED CAPACITY) CONCRETE PLANT OILER, BLACKTOP PLANT OILER AND CRETER CRANE OILER (WHEN REQUIRED), BARGE TENDERS, OILERS ON DRILL RIGS USED FOR CAISSON OR FOR PILE DRIVING. INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $43.45 | $34.95 | $78.40 |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSORS (ONE), WATER PUMPS, REGARDLESS OF SIZE (ONE), WATER-BLASTERS (ONE), WELDING MACHINE (ONE), MIXERS (ONE BAG), CONVEYOR (ONE), SIPHON OR JET (ONE), LIGHT PLANT (ONE), HEATER (ONE), IMMOBILE TRACK AIR (ONE), AND SELF-PROPELLED WALK BEHIND ROLLERS. INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $36.84 | $34.95 | $71.79 |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON OR JET; LIGHT PLANT ONE; HEATER ONE; IMMOBILE TRACK AIR ONE | $36.84 | $34.95 | $71.79 |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $41.32 | $34.95 | $76.27 |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS | $41.32 | $34.95 | $76.27 |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT OPERATORS, DREDGES, ASPHALT SPREADING MACHINES, SCREWS ON ASPHALT SPREADING MACHINES, ALL LOCOMOTIVES, CABLE WAYS OR TOWER MACHINES, HOISTS, HYDRAULIC BACKHOES, DITCHING MACHINES, OR BACKFILLER, CHERRYPICKERS, OVERHEAD CRANES, ROLLER, STEAM OR GAS, CONCRETE PAVERS, EXCAVATOR CONCRETE BREAKERS, CONCRETE PUMPS, BULK CEMENT PLANTS, CEMENT PUMPS, DERRICK-TYPE DRILLS, BOAT OPERATORS, MOTOR GRADERS OR PUSHCATS, SCOOPS OR TOURNAPULLS, BULLDOZERS, ENDLOADERS OR FORK LIFTS, POWER BLADE OR ELEVATING GRADERS, WINCH CATS, BOOM OR WINCH TRUCKS OR BOOM TRACTORS, PIPE WRAPPING OR PAINTING MACHINES, ASPHALT PLANT ENGINEER, JOURNEYMAN LUBRICATING ENGINEER, DRILLS (OTHER THAN DERRICK TYPE), MUD JACKS, OR WELL DRILLING MACHINES, BORING MACHINES OR TRACK JACKS, MIXERS, CONVEYORS (TWO), AIR COMPRESSORS (TWO) WATER PUMPS, REGARDLESS OF SIZE (TWO), WELDING MACHINES (TWO), SIPHONS OR JETS (TWO), WINCH HEAD OR APPARATUSES (TWO), LIGHT PLANTS (TWO), WATERBLASTERS (TWO), ALL TRACTORS, REGARDLESS OF SIZE (STRAIGHT TRACTOR ONLY), FIREMAN ON STATIONARY BOILERS, AUTOMATIC ELEVATORS, FORM GRADING MACHINES, FINISHING MACHINES, POWER SUB-GRADER OR RIBBON MACHINES, LONGITUDINAL FLOATS, DISTRIBUTOR OPERATORS ON TRUCKS, WINCH HEADS OR APPARATUSES (ONE), MOBIL TRACK AIR AND HEATERS (TWO TO FIVE), HEAVY EQUIPMENT GREASER, RELIEF OPERATOR, ASSISTANT MASTER MECHANIC AND HEAVY DUTY MECHANIC, CONCRETE SAWS OF ALL TYPES AND SIZES WITH THEIR ATTACHMENTS, GOB-HOPPERS, EXCAVATORS ALL SIZES, THE REPAIR, GREASING, AND FUELING OF ALL DIESEL HAMMERS, THE OPERATION, SET-UP AND CLEANING OF BIDWELLS, CONCRETE PLACEMENT BOOMS, THE ALTERATIONS, REPAIR OF ALL BARGES, WATER BLASTERS OF ALL SIZES AND THEIR CLUTCHES, MOBILE LIFTS, HYDRAULIC JACKS WHERE USED FOR HOISTING, DIESEL OR GAS POWERED FLASHING SIGNS USED FOR TRAFFIC CONTROL, MICRO PAVERS, LOG SKIDERS, ICEOLATORS USED ON AND OFF OF PIPELINE, CONDOR CRANES, DRILL RIGS OF ALL SIZES, BOW BOATS, SURVEY BOATS, ROSS CARRIERS, BOB-CATS AND ALL THEIR ATTACHMENTS, SKID STEER LOADERS AND ALL THEIR ATTACHMENTS, CRETER CRANE, DIRECT DRIVE ELECTRIC MOTORS THE BOLTING AND UNBOLTING THE ADJUSTING AND SHIMMING, (DEWATERINGJOBS, WHIRLEY CRANE, CONVEYOR BELTS) ETC., BATCH PLANTS (ALL SIZES), ROTO MILLS, CONVEYORS SYSTEMS OF ANY SIZE AND ANY CONFIGURATION, HYDROSEEDERS AND STRAW-BLOWERS ALL SIZES, OPERATION, REPAIR, SERVICE OF ALL VIBRATORY HAMMERS, ALL POWER PACS AND THEIR CONTROLS REGARDLESS OF LOCATION, CURTAINS OR BRUSH BURNING MACHINES, STUMP CUTTER MACHINES, GROUT MACHINES REGARDLESS OF SIZE, NAIL LAUNCHERS WHEN MOUNTED ON A MACHINE OR SELF-PROPELLED, CON-COVER MACHINES, GOLDHOFER AND SIMILAR S.P.M.T. (SELF-PROPELLED MODULAR TRANSPORTERS) HEAVY TRANSPORT UNITS AND ALL OPERATORS (EXCEPT THOSE LISTED BELOW). INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $42.45 | $34.95 | $77.40 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND COUNTY (EXCEPT THE NORTHSIDE)) | $30.15 | $35.08 | $65.23 |
| LABORERS, GROUP 1 GENERAL LABORER (BOND COUNTY (EXCEPT THE NORTHSIDE)) | $29.65 | $35.08 | $64.73 |
| LABORERS, GROUP 3 DYNAMITE MAN (BOND COUNTY (EXCEPT THE NORTHSIDE)) | $31.15 | $35.08 | $66.23 |
| LABORERS, GROUP 3 DYNAMITE MAN (ST. CLAIR (MASCOUTAH) AND CLINTON (NEW BADEN) COUNTIES) | $30.76 | $31.47 | $62.23 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (ST. CLAIR (MASCOUTAH) AND CLINTON (NEW BADEN) COUNTIES) | $29.76 | $31.47 | $61.23 |
| LABORERS, GROUP 1 GENERAL LABORER (ST. CLAIR (MASCOUTAH) AND CLINTON (NEW BADEN) COUNTIES) | $29.26 | $31.47 | $60.73 |
| LABORERS, GROUP 3 DYNAMITE MAN (BOND (SORENTO) AND MONTGOMERY COUNTIES) | $33.91 | $32.32 | $66.23 |
| LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER (BOND (SORENTO) AND MONTGOMERY COUNTIES) | $32.91 | $32.32 | $65.23 |
| LABORERS, GROUP 1 GENERAL LABORER (BOND (SORENTO) AND MONTGOMERY COUNTIES) | $32.41 | $32.32 | $64.73 |
| PAINTER: BRIDGE EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $32.45 | $17.12 | $49.57 |
| CEMENT MASON/CONCRETE FINISHER (BOND, CALHOUN, CLINTON (WESTERN HALF EAST TO BUT NOT INCLUDE CARYLE), GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY, AND ST. CLAIR COUNTIES) | $39.00 | $30.60 | $69.60 |
| CEMENT MASON/CONCRETE FINISHER (CLINTON COUNTY) | $39.00 | $30.60 | $69.60 |
| CEMENT MASON/CONCRETE FINISHER (WASHINGTON COUNTY) | $36.43 | $20.87 | $57.30 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) | $47.71 | $25.72 | $73.43 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) | $46.60 | $25.72 | $72.32 |
| TRUCK DRIVER, GROUP 3 (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) | $46.25 | $25.72 | $71.97 |
| TRUCK DRIVER, GROUP 2 (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) | $45.93 | $25.72 | $71.65 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (BOND. CLINTON, MONROE, ST CLAIR, WASHINGTON COUNTIES) | $45.35 | $25.72 | $71.07 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) | $47.71 | $25.72 | $73.43 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) | $46.60 | $25.72 | $72.32 |
| TRUCK DRIVER, GROUP 3 (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) | $46.25 | $25.72 | $71.97 |
| TRUCK DRIVER, GROUP 2 (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) | $45.93 | $25.72 | $71.65 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (CALHOUN, GREENE (SOUTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY), JERSEY, MACOUPIN, MADISON, MONTGOMERY COUNTIES) | $45.35 | $25.72 | $71.07 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) | $47.71 | $25.72 | $73.43 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) | $46.60 | $25.72 | $72.32 |
| TRUCK DRIVER, GROUP 3 (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) | $46.25 | $25.72 | $71.97 |
| TRUCK DRIVER, GROUP 2 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBIATION UNITS. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) | $45.93 | $25.72 | $71.65 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (GREENE (NORTH OF A DIRECT LINE THAT EXTENDS EAST FROM PIKE COUNTY THROUGH HILLVIEW/WHITEHALL TO MACOUPIN COUNTY) COUNTY) | $45.35 | $25.72 | $71.07 |