Residential construction wages: Ogle, Illinois
Wage determination IL20260055 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IL20260055 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/IL20260055/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $45.49 | $25.72 | $71.21 |
| TERRAZZO WORKER/SETTER | $44.38 | $25.84 | $70.22 |
| CARPENTER: (INCLUDING DRYWALL HANGING AND BATT INSULATION) RATE B - SINGLE FAMILY HOME, DUPLEX AND A MULTI-UNIT BUILDING UP TO AND INCLUDING EIGHT (8) UNITS SUCH AS A ROWHOUSE, TOWNHOUSE AND CONDOMINIUM | $24.61 | $15.94 | $40.55 |
| CARPENTER: (INCLUDING DRYWALL HANGING AND BATT INSULATION) RATE A - MULTI-UNIT BUILDING/STRUCTURE CONTAINING MORE THAN EIGHT (8) UNITS USED EXCLUSIVELY AS INDIVIDUAL RESIDENCES WHETHER THEY BE LEASED OR RENTED | $31.32 | $26.23 | $57.55 |
| CARPENTER: INCLUDING SOFT FLOOR LAYER AND BATT/BLOWN INSULATION (OGLE COUNTY (NORTHERN HALF)) | $37.19 | $26.60 | $63.79 |
| ELECTRICIAN | $30.61 | $28.17 | $58.78 |
| OPERATOR: POWER EQUIPMENT, GROUP 4 OILERS (OGLE COUNTY) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | $51.60 | $51.05 | $102.65 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 PUMPS OVER 3" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, (OGLE COUNTY) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | $53.60 | $51.05 | $104.65 |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BULLDOZERS; GREASER ENGINEER;HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; ROLLERS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); (OGLE COUNTY) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA | $56.05 | $51.05 | $107.10 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 BACKHOES WITH CAISSON ATTACHMENT*: COMBINATION BACKHOE FRONT ENDLOADER CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*;CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY);CRETER CRANE; FORMLESS CURB AND GUTTER MACHINE*; GRADER, HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HYDRAULIC BACKHOES*; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; PUMPS GYPSUM BULKER AND PUMP; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*. (OGLE COUNTY) | $56.75 | $51.05 | $107.80 |
| LABORERS: COMMON AND LANDSCAPE | $19.88 | $11.87 | $31.75 |
| PAINTER: BRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 | $74.56 |
| CEMENT MASON/CONCRETE FINISHER | $27.43 | $22.21 | $49.64 |
| PLUMBER/PIPEFITTER | $55.54 | $31.43 | $86.97 |
| ROOFER | $50.25 | $30.43 | $80.68 |
| SHEET METAL WORKER (INCLUNDING HVAC) | $39.47 | $31.55 | $71.02 |
| LABORERS: PLANTSMAN | $9.00 | $0.00 | $9.00 |
| TRUCK DRIVER: 6 AXLES (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) | $45.38 | $0.30 | $45.68 |
| TRUCK DRIVER: 5 AXLES (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) | $45.18 | $0.30 | $45.48 |
| TRUCK DRIVER: 4 AXLES (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) | $44.98 | $0.30 | $45.28 |
| TRUCK DRIVER: 2-3 AXLES (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) | $44.83 | $0.30 | $45.13 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $47.64 | $25.42 | $73.06 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS. (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $46.54 | $25.42 | $71.96 |
| TRUCK DRIVER, GROUP 3 (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $46.15 | $25.42 | $71.57 |
| TRUCK DRIVER, GROUP 2 (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $45.88 | $25.42 | $71.30 |
| TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $45.29 | $25.42 | $70.71 |