Residential construction wages: Shelby, Illinois
Wage determination IL20260039 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/IL20260039 on · latest revision 1 · verify at sam.gov/wage-determination/IL20260039/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER (MOULTRIE AND SHELBY COUNTIES) | $33.49 | $24.93 | $58.42 |
| CARPENTER (INCLUDING DRYWALL AND BATT INSULATION) | $30.34 | $28.25 | $58.59 |
| ELECTRICIAN | $28.05 | $16.73 | $44.78 |
| POWER EQUIPMENT OPERATOR: BACKHOE | $40.71 | $28.75 | $69.46 |
| LABORER, UNSKILLED | $32.19 | $28.90 | $61.09 |
| PAINTER: SPRAY AND SANDBLASTING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $31.25 | $22.30 | $53.55 |
| PAINTER: BRUSH & ROLLER; PAPERHANGER & DRYWALL TAPING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 |
| CEMENT MASON/CONCRETE FINISHER (SHELBY COUNTY (EXCLUDES THE TOWNS OF COWDEN, HERRICK, LAKEWOOD, MOWEAQUA, OCONEE, SHELBYVILLE, TOWER HILL, AND WESTERVELT)) | $22.50 | $9.75 | $32.25 |
| CEMENT MASON/CONCRETE FINISHER (SHELBY COUNTY (INCLUDING THE TOWNS OF COWDEN, HERRICK, LAKEWOOD, MOWEAQUA, OCONEE, SHELBYVILLE, TOWERHILL, & WESTERVELT)) | $32.60 | $18.91 | $51.51 |
| PLUMBER (EXCLUDING HVAC) | $37.88 | $25.71 | $63.59 |
| SHEET METAL WORKER (INCLUDING HVAC) | $21.00 | $10.19 | $31.19 |
| ROOFER | $12.67 | $0.00 | $12.67 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.