Residential construction wages: De Kalb, Illinois

Wage determination IL20260065 · Active · Standard · verify on SAM.gov

De Kalb

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
TILE SETTER$45.49$25.72$71.21
TERRAZZO WORKER/SETTER$44.38$25.84$70.22
CARPENTER (BATT AND BLOWN INSULATION) (INCLUDES SOFT FLOOR LAYER)$38.40$26.23$64.63
ELECTRICIAN (DEKALB COUNTY (EXCEPT SANDWICH TWP))$30.61$28.17$58.78
ELECTRICIAN (DE KALB COUNTY (SANDWICH TWP))$48.98$32.73$81.71
OPERATOR: POWER EQUIPMENT: GROUP 4 OILERS; PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. TRUCK MOUNTED CONCRETE PUMPS: WHEN THE TRUCK MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA$51.60$51.05$102.65
OPERATOR: POWER EQUIPMENT: GROUP 3 PUMPS OVER 3" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CANNOT BE COMBINED. CRANE MOUNTED EARTH AUGER, RAISED AND BLIND HOLE DRILLS, AND TRUCK MOUNTED DRILL RIGS RECEIVE AN EXTRA $.50 PER HOUR. CRETER CRANES: WHEN THE CRETER CRANE IS EQUIPPED WITH A CONVEYOR SYSTEM CAPABLE OF EXTENDING 70' OR MORE, THE ENGINEER SHALL RECEIVE AN EXTRA $.50 PER HOUR. MOUNTED CONCRETE PUMP IS EQUIPPED WITH A BOOM, WHICH IS CAPABLE OF EXTENDING 90' OR MORE, THE ENGINEER SHALL RECEIVE $.50 PER HOUR EXTRA$53.60$51.05$104.65
OPERATOR: POWER EQUIPMENT: GROUP 2 BULLDOZERS; GREASER ENGINEER; FRONT END LOADERS UNDER 2 1/4 CU YD; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR);$56.05$51.05$107.10
OPERATOR: POWER EQUIPMENT: GROUP 1 MECHANIC; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*: COMBINATION BACKHOE FRONT ENDLOADER MACHINE; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; FRONT ENDLOADER 2 1/4 YD. AND OVER; HYDRAULIC BACKHOES*; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); PUMP CRETES; SQUEEZE CRETES- SCREW TYPE PUMPS GYPSUM BULKER AND PUMP; SCOOPS-TRACTOR DRAWN; SLIP-FORM PAVER*; TRACTOR WITH BOOM, AND SIDE BOOM; AND TRENCHING MACHINES*.$56.75$51.05$107.80
LABORER (INCLUDING LANDSCAPING)$19.88$11.87$31.75
PAINTER: BRUSH ONLY: INCLUDING DRYWALL FINISHER (DE KALB COUNTY)$51.55$26.68$78.23
CEMENT MASON/CONCRETE FINISHER (DE KALB COUNTY)$50.70$40.60$91.30
PLUMBER/PIPEFITTER$41.20$29.15$70.35
ROOFER$50.25$30.43$80.68
SHEET METAL WORKER (INCLUNDING HVAC)$39.47$31.55$71.02
LABORERS: PLANTSMAN$9.00$0.00$9.00
TRUCK DRIVER: 6 AXLES$45.38$0.30$45.68
TRUCK DRIVER: 5 AXLES$45.18$0.30$45.48
TRUCK DRIVER: 4 AXLES$44.98$0.30$45.28
TRUCK DRIVER: 2-3 AXLES$44.83$0.30$45.13