| BOILERMAKER | $45.50 | $35.30 | $80.80 |
| MARBLE, TILE & TERRAZZO WORKERS | $32.20 | $18.51 | $50.71 |
| MARBLE, TILE & TERRAZZO FINISHER | $30.70 | $18.51 | $49.21 |
| CARPENTER AND LATHER (BUILDING) | $33.36 | $28.60 | $61.96 |
| CARPENTER - PILEDRIVER (BUILDING) | $34.36 | $28.60 | $62.96 |
| CARPENTER (RESIDENTIAL) | $30.02 | $28.60 | $58.62 |
| MILLWRIGHT | $33.06 | $29.36 | $62.42 |
| ELECTRICIAN (RESIDENTIAL) | $28.05 | $16.73 | $44.78 |
| ELECTRICIAN (BUILDING) | $48.00 | $24.16 | $72.16 |
| ELEVATOR MECHANIC | $57.99 | $38.44 | $96.43 |
| POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE PREMIUM PAY- CRANES WITH BOOMS-120-200 FT.- 1.00 PER HOUR; 150 FT. .02 PER FOOT FOR EACH FOOT ABOVE 200; MULTIPLE UNIT MACHINES- 1.00 PER HOUR; UNDERGROUND WORK- 1.00 PER HOUR; UNDER AIR PRESSURE- 1.00 PER HOUR; LONG BOOMS ON STATIONARY CRANES- 1.00 PER HOUR. ABOVE LONG BOOM SCALE HAZARDOUS WASTE/ASBESTOS REMOVAL WORKERS RECEIVE THE FOLLOWING WAGES AND FRINGE BENEFITS: LEVEL A (HIGHEST LEVEL OF RESPIRATORY, SKIN, AND EYE PROTECTION) RECEIVES $2.00 PER HOUR ABOVE JOURNEYMAN. LEVEL B (SAME AS LEVEL B, BUT A LOWER LEVEL OF SKIN PROTECTION) RECEIVES $1.50 PER HOUR ABOVE JOURNEYMAN. LEVEL C (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) RECEIVES $1.00 PER HOUR ABOVE JOURNEYMAN | $42.32 | $28.75 | $71.07 |
| POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIERS (EXCEPT PLANT, PAVER, TOWER) FIREMENT, GENERATORS; GREASERS; LIGHT PLANTS; MECHANICAL THEATER; OILERS; POWER FROM GRADERS; POWER SUB-GRADER; PUG MILL, WHEN USED OTHER THAN ASPHALT OPERATION; ROOLERS (EXCEPT BITUMIN OUS); TRACTORS W/O POWER ATTACHMENTS REGARDLESS OF SIZE OR TYPE; TRUCK CRANE OILER; & DRIVER ( ONE MAN ); VIBRATORY HAMMER; WAT ER PUMP; WELDING MACHINE ( ONE 300 AMP OR OVER) COMBINATIONS OF FIVE OF ANY AIR COMPRESSORS; CONVEYORS, WELDING MACHINES, WATER PUMPS; LIGHT PLANTS OR GENERATORS SHALL BE IN BATTERIES OR WITH IN 300 FT. PREMIUM PAY- CRANES WITH BOOMS-120-200 FT.- 1.00 PER HOUR; 150 FT. .02 PER FOOT FOR EACH FOOT ABOVE 200; MULTIPLE UNIT MACHINES- 1.00 PER HOUR; UNDERGROUND WORK- 1.00 PER HOUR; UNDER AIR PRESSURE- 1.00 PER HOUR; LONG BOOMS ON STATIONARY CRANES- 1.00 PER HOUR. ABOVE LONG BOOM SCALE HAZARDOUS WASTE/ASBESTOS REMOVAL WORKERS RECEIVE THE FOLLOWING WAGES AND FRINGE BENEFITS: LEVEL A (HIGHEST LEVEL OF RESPIRATORY, SKIN, AND EYE PROTECTION) RECEIVES $2.00 PER HOUR ABOVE JOURNEYMAN. LEVEL B (SAME AS LEVEL B, BUT A LOWER LEVEL OF SKIN PROTECTION) RECEIVES $1.50 PER HOUR ABOVE JOURNEYMAN. LEVEL C (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) RECEIVES $1.00 PER HOUR ABOVE JOURNEYMAN | $34.30 | $28.75 | $63.05 |
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN; BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONCRETE FINSHING MACHINE; CONCRETE SAW, SELF PROPELLED; CONCRETE SPREADER MACHINE; GRAVEL OR STONE SPREADER, POWER OPERATED; HOIST AUTOMATIC; HOIST WITH ONE DRUM & ONE LOAD LINE; OILER ON 2 PAVING MIXERS WHEN USED IN TANDEM BOOM OR WINCH TRUCK; POST HOLE DIGGERS; MECHANICAL; ROAD OR STREET SWEEPER, SELF-PROPELLED; SCISSORS HOIST; SEAMAN TILLER; STRAW MACHINE; VIBRATORY COMPACTOR; WELL DRILL MACHINE; & MUD JACKS. PREMIUM PAY- CRANES WITH BOOMS-120-200 FT.- 1.00 PER HOUR; 150 FT. .02 PER FOOT FOR EACH FOOT ABOVE 200; MULTIPLE UNIT MACHINES- 1.00 PER HOUR; UNDERGROUND WORK- 1.00 PER HOUR; UNDER AIR PRESSURE- 1.00 PER HOUR; LONG BOOMS ON STATIONARY CRANES- 1.00 PER HOUR. ABOVE LONG BOOM SCALE HAZARDOUS WASTE/ASBESTOS REMOVAL WORKERS RECEIVE THE FOLLOWING WAGES AND FRINGE BENEFITS: LEVEL A (HIGHEST LEVEL OF RESPIRATORY, SKIN, AND EYE PROTECTION) RECEIVES $2.00 PER HOUR ABOVE JOURNEYMAN. LEVEL B (SAME AS LEVEL B, BUT A LOWER LEVEL OF SKIN PROTECTION) RECEIVES $1.50 PER HOUR ABOVE JOURNEYMAN. LEVEL C (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) RECEIVES $1.00 PER HOUR ABOVE JOURNEYMAN | $38.18 | $28.75 | $66.93 |
| POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONTRETE; ATHEY LOADERS; CABLEWAYS; CHERRY PICKER; CLAMSHELL; C.M.I. & SIMILAR TYPE AUTOGRADE FORMLESS PAVER,AUTGRADE PLACER & FINISHER; CONCRETE BREAKER;CONCRETE PLANT OPER; CONCRETE PUMPS; CRANES; DERRICKS; DERRICK BOATS; DRAGLINES; EARTH AUGER BORING MACHINE, ELEVATING GRADERS; ENGINEERS ON DREDGE; GRAVEL PROCESSING MACHINES; HEAD EQUIPMENT GREASER; HIGH LIFT OR FORK LIFT; HOIST WITH TWO DRUMS OR 2 OR MORE LOADLINES; LOCOMOTIVE; MECHANICS; MOTOR GRADERS OR AUTO PATROLS; OPERATORS OR LEVELMAN ON DREDGES; POWER BOAT OPER; PUG MILL OPER; (ASPHALT PLAT); ORANGE PEELS; OVERHEAD CRANES; PAVING MIXER; PILEDRIVERS; PIPE WRAPER & PAINTING MACHINES; PUSH DOZERS, OR PUSH CATS; ROCK CRUSHER; ROSS CARRIER OR SIMILAR MACHINE; SCOOPS; SKIMMERS 2 CU YD CAPACITY & UNDER: SHEEP FOOT ROLLER (SELF PROPELLED);SHOVELS; SKIMMER; SCOOPS; TEST HOLE DRILLING MACHINES; TOWER MACHINE; TOWER MIXER; TRACK TUPE & LOADERS; TRACK TYPE FORKLIFTS OR HIGH LIFTS; TRACK JACKS & TAMPERS; TRACKORS; SIDEBOOM; TRENCHING MACHINE; DITCHING MACHINE; TUNNEL LUGGER; WHEEL TYPE END LOADER; WINCH CAT; SCOOPS (ALLOR TOURNAPULL) PREMIUM PAY- CRANES WITH BOOMS-120-200 FT.- 1.00 PER HOUR; 150 FT. .02 PER FOOT FOR EACH FOOT ABOVE 200; MULTIPLE UNIT MACHINES- 1.00 PER HOUR; UNDERGROUND WORK- 1.00 PER HOUR; UNDER AIR PRESSURE- 1.00 PER HOUR; LONG BOOMS ON STATIONARY CRANES- 1.00 PER HOUR. ABOVE LONG BOOM SCALE HAZARDOUS WASTE/ASBESTOS REMOVAL WORKERS RECEIVE THE FOLLOWING WAGES AND FRINGE BENEFITS: LEVEL A (HIGHEST LEVEL OF RESPIRATORY, SKIN, AND EYE PROTECTION) RECEIVES $2.00 PER HOUR ABOVE JOURNEYMAN. LEVEL B (SAME AS LEVEL B, BUT A LOWER LEVEL OF SKIN PROTECTION) RECEIVES $1.50 PER HOUR ABOVE JOURNEYMAN. LEVEL C (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) RECEIVES $1.00 PER HOUR ABOVE JOURNEYMAN | $40.71 | $28.75 | $69.46 |
| IRONWORKER (REMAINDER OF COUNTY) | $36.20 | $31.35 | $67.55 |
| IRONWORKER (MACON COUNTY (EAST OF DECATUR)) | $37.71 | $29.65 | $67.36 |
| LABORER (GENERAL LABORER) | $32.19 | $29.24 | $61.43 |
| LABORER (ABESTOS ABATEMENT WORKER) | $35.19 | $29.24 | $64.43 |
| PAINTER: SPRAY AND SANDBLASTING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $31.25 | $22.30 | $53.55 |
| PAINTER: PAPERHANGING AND DRYWALL TAPING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 |
| PAINTER: BRUSH AND ROLLER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM WORK OVER 50 FT. ABOVE GROUND OR FLOOR LEVEL - $1.00 PREMIUM | $30.50 | $22.30 | $52.80 |
| GLAZIER | $39.77 | $22.73 | $62.50 |
| PLASTERER | $30.00 | $27.01 | $57.01 |
| CEMENT MASON/CONCRETE FINISHER | $30.69 | $23.29 | $53.98 |
| PLUMBER, PIPEFITTER, STEAMFITTER (RESIDENTIAL CONSTRUCTION) | $37.88 | $25.71 | $63.59 |
| ROOFER | $35.07 | $27.41 | $62.48 |
| SHEET METAL WORKER | $36.80 | $30.20 | $67.00 |
| TRUCK DRIVER: GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $45.61 | $27.56 | $73.17 |
| TRUCK DRIVER: GROUP 4: LOW BOY AND OIL DISTRIBUTORS | $44.53 | $27.56 | $72.09 |
| TRUCK DRIVER: GROUP 3- 2, 3 OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS | $44.15 | $27.56 | $71.71 |
| TRUCK DRIVER: GROUP 2- 2 OR 3 AXLES HUALING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBIATION UNITS | $43.86 | $27.56 | $71.42 |
| TRUCK DRIVER: GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY | $43.28 | $27.56 | $70.84 |