| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.48 | $27.24 | $70.72 |
| BOILERMAKER | $45.50 | $35.30 | $80.80 |
| BRICKLAYER, CAULKER, CLEANER, POINTER & STONEMASON | $33.49 | $24.93 | $58.42 |
| MARBLE, TILE & TERRAZZO WORKERS | $32.20 | $18.51 | $50.71 |
| CARPENTER AND LATHER (BUILDING) | $31.64 | $25.74 | $57.38 |
| CARPENTER - PILEDRIVER (BUILDING) | $32.64 | $25.74 | $58.38 |
| CARPENTER (RESIDENTIAL) | $28.48 | $25.74 | $54.22 |
| MILLWRIGHT | $33.06 | $29.36 | $62.42 |
| ELECTRICIAN Residential Construction (up to and including 4 stories) | $24.83 | $17.12 | $41.95 |
| ELEVATOR MECHANIC | $57.99 | $38.44 | $96.43 |
| POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE PREMIUM PAY- CRANES WITH BOOMS - 120-200 FT. 1.00 PER HOUR; $.02 PER FOOT FOR EACH FOOT ABOVE 200; MULTIPLE UNIT MACHINES- 1.00 PER HOUR; UNDERGROUND WORK- 1.00 PER HOUR; UNDER AIR PRESSURE- 1.00 PER HOUR; LONG BOOMS ON STATIONARY TOWER CRANES-1.00 PER HOUR. ABOVE LONG BOOM SCALE HAZARDOUS WASTE/ASBESTOS REMOVAL WORKERS RECEIVE THE FOLLOWING WAGES AND FRINGE BENEFITS: LEVEL A (HIGHEST LEVEL OF RESPIRATORY, SKIN, AND EYE PROTECTION) RECEIVES $2.00 PER HOUR ABOVE JOURNEYMAN. LEVEL B (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) RECEIVES $1.50 PER HOUR ABOVE JOURNEYMAN. LEVEL C (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) RECEIVES $1.00 PER HOUR ABOVE JOURNEYMAN | $42.32 | $28.75 | $71.07 |
| TRUCK DRIVER: GROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY | $45.35 | $25.72 | $71.07 |
| POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIERS (EXCEPT PLANT,PAVER,TOWER) FIREMENT, GENERATORS; GREASERS; FROM GRADERS; POWER SUB-GRADER; PUG MILL, WHEN USED OTHER THAN ASPHALT OPERATION; ROLLERS (EXCEPT BITUMIN OUS); TRACTORS W/O POWER ATTACHMENTS REGARDLESS OF SIZE OR TYPE; TRUCK CRANE OILER; & DRIVER ( ONE MAN ); VIBRATORY HAMMER; WAT ER PUMP; WELDING MACHINE ( ONE 300 AMP OR OVER) COMBINATIONS OF FIVE OF ANY AIR COMPRESSORS; CONVEYORS, WELDING MACHINES, WATER PUMPS; LIGHT PLANTS OR GENERATORS SHALL BE IN BATTERIES OR WITH IN 300 FT. PREMIUM PAY- CRANES WITH BOOMS - 120-200 FT. 1.00 PER HOUR; $.02 PER FOOT FOR EACH FOOT ABOVE 200; MULTIPLE UNIT MACHINES- 1.00 PER HOUR; UNDERGROUND WORK- 1.00 PER HOUR; UNDER AIR PRESSURE- 1.00 PER HOUR; LONG BOOMS ON STATIONARY TOWER CRANES-1.00 PER HOUR. ABOVE LONG BOOM SCALE HAZARDOUS WASTE/ASBESTOS REMOVAL WORKERS RECEIVE THE FOLLOWING WAGES AND FRINGE BENEFITS: LEVEL A (HIGHEST LEVEL OF RESPIRATORY, SKIN, AND EYE PROTECTION) RECEIVES $2.00 PER HOUR ABOVE JOURNEYMAN. LEVEL B (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) RECEIVES $1.50 PER HOUR ABOVE JOURNEYMAN. LEVEL C (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) RECEIVES $1.00 PER HOUR ABOVE JOURNEYMAN | $34.30 | $28.75 | $63.05 |
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONCRETE FINSHING MACHINE; CONCRETE SAW, SELF PROPELLED; CONCRETE SPREADER MACHINE; GRAVEL OR STONE SPREADER, POWER OPERATED; HOIST AUTOMATIC; HOIST WITH ONE DRUM & ONE LOAD LINE; OILER ON 2 PAVING MIXERS WHEN USED IN TANDEM BOOM OR WINCH TRUCK; POST HOLE DIGGERS; MECHANICAL; ROAD OR STREET SWEEPER, SELF-PROPELLED; SCISSORS HOIST; SEAMAN TILLER; STRAW MACHINE; VIBRATORY COMPACTOR; WELL DRILL MACHINE; & MUD JACKS. PREMIUM PAY- CRANES WITH BOOMS - 120-200 FT. 1.00 PER HOUR; $.02 PER FOOT FOR EACH FOOT ABOVE 200; MULTIPLE UNIT MACHINES- 1.00 PER HOUR; UNDERGROUND WORK- 1.00 PER HOUR; UNDER AIR PRESSURE- 1.00 PER HOUR; LONG BOOMS ON STATIONARY TOWER CRANES-1.00 PER HOUR. ABOVE LONG BOOM SCALE HAZARDOUS WASTE/ASBESTOS REMOVAL WORKERS RECEIVE THE FOLLOWING WAGES AND FRINGE BENEFITS: LEVEL A (HIGHEST LEVEL OF RESPIRATORY, SKIN, AND EYE PROTECTION) RECEIVES $2.00 PER HOUR ABOVE JOURNEYMAN. LEVEL B (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) RECEIVES $1.50 PER HOUR ABOVE JOURNEYMAN. LEVEL C (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) RECEIVES $1.00 PER HOUR ABOVE JOURNEYMAN | $38.18 | $28.75 | $66.93 |
| POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONTRETE; ATHEY LOADERS; CABLEWAYS; CHERRY PICKER; CLAMSHELL; C.M.I. & SIMILAR TYPE AUTOGRADE FORMLESS PAVER,AUTGRADE PLACER & FINISHER; CONCRETE BREAKER;CONCRETE PLANT OPER; CONCRETE PUMPS; CRANES; DERRICKS;DERRICK BOATS; DRAGLINES; EARTH AUGER BORING MACHINE, ELEVATING GRADERS; ENGINEERS ON DREDGE; GRAVEL PROCESSING MACHINES;HEAD EQUIPMENT GREASER;HIGH LIFT OR FORK LIFT;HOIST WITH TWO DRUMS OR 2 OR MORE LOADLINES; LOCOMOTIVE;MECHANICS; MOTOR GRADERS OR AUTO PATROLS; OPERATORS OR LEVELMAN ON DREDGES; POWER BOAT OPER; PUG MILL OPER; (ASPHALT PLAT); ORANGE PEELS; OVERHEAD CRANES; PAVING MIXER; PILEDRIVERS; PIPE WRAPER & PAINTING MACHINES; PUSH DOZERS, OR PUSH CATS; ROCK CRUSHER; ROSS CARRIER OR SIMILAR MACHINE; SCOOPS; SKIMMERS 2 CU YD CAPACITY & UNDER: SHEEP FOOT ROLLER (SELF PROPELLED);SHOVELS; SKIMMER; SCOOPS; TEST HOLE DRILLING MACHINES; TOWER MACHINE; TOWER MIXER; TRACK TUPE & LOADERS; TRACK TYPE FORKLIFTS OR HIGH LIFTS; TRACK JACKS & TAMPERS; TRACKORS; SIDEBOOM; TRENCHING MACHINE; DITCHING MACHINE; TUNNEL LUGGER; WHEEL TYPE END LOADER; WINCH CAT; SCOOPS (ALLOR TOURNAPULL) PREMIUM PAY- CRANES WITH BOOMS - 120-200 FT. 1.00 PER HOUR; $.02 PER FOOT FOR EACH FOOT ABOVE 200; MULTIPLE UNIT MACHINES- 1.00 PER HOUR; UNDERGROUND WORK- 1.00 PER HOUR; UNDER AIR PRESSURE- 1.00 PER HOUR; LONG BOOMS ON STATIONARY TOWER CRANES-1.00 PER HOUR. ABOVE LONG BOOM SCALE HAZARDOUS WASTE/ASBESTOS REMOVAL WORKERS RECEIVE THE FOLLOWING WAGES AND FRINGE BENEFITS: LEVEL A (HIGHEST LEVEL OF RESPIRATORY, SKIN, AND EYE PROTECTION) RECEIVES $2.00 PER HOUR ABOVE JOURNEYMAN. LEVEL B (SAME AS LEVEL A, BUT A LOWER LEVEL OF SKIN PROTECTION) RECEIVES $1.50 PER HOUR ABOVE JOURNEYMAN. LEVEL C (SAME AS LEVEL B, BUT A LOWER LEVEL OF RESPIRATORY PROTECTION) RECEIVES $1.00 PER HOUR ABOVE JOURNEYMAN | $40.71 | $28.75 | $69.46 |
| IRONWORKER | $36.20 | $31.35 | $67.55 |
| LABORER (GENERAL LABORER) | $32.90 | $29.26 | $62.16 |
| LABORER (ASBESTOS ABATEMENT WORKER) | $35.90 | $29.26 | $65.16 |
| PAINTER: RESIDENTIAL EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $29.73 | $20.58 | $50.31 |
| PAINTER: BUILDING EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM ALL WORK OVER 40 FT. ABOVE FLOOR OR GROUND LEVEL - $1.00 PREMIUM | $32.23 | $20.58 | $52.81 |
| GLAZIER | $39.77 | $22.73 | $62.50 |
| PLASTERER | $28.50 | $19.12 | $47.62 |
| CEMENT MASON/CONCRETE FINISHER | $28.51 | $21.93 | $50.44 |
| PLASTERER | $28.50 | $19.12 | $47.62 |
| CEMENT MASON/CONCRETE FINISHER | $28.51 | $21.93 | $50.44 |
| PLUMBER, PIPEFITTER, STEAMFITTER (RESIDENTIAL) | $37.88 | $25.71 | $63.59 |
| PLUMBER, PIPEFITTER, STEAMFITTER (BUILDING) | $43.89 | $25.71 | $69.60 |
| ROOFER | $36.00 | $26.36 | $62.36 |
| SHEET METAL WORKER (RESIDENTIAL) | $26.73 | $26.48 | $53.21 |
| SHEET METAL WORKER (BUILDING) | $38.54 | $30.37 | $68.91 |
| TRUCK DRIVER: GROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $47.71 | $25.72 | $73.43 |
| TRUCK DRIVER: GROUP 4: LOW BOY AND OIL DISTRIBUTORS | $46.60 | $25.72 | $72.32 |
| TRUCK DRIVER: GROUP 3- 2, 3 OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS | $46.25 | $25.72 | $71.97 |
| TRUCK DRIVER: GROUP 2- 2 OR 3 AXLES HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBIATION UNITS | $45.93 | $25.72 | $71.65 |