Bricklayer prevailing wages: New Jersey, county by county

45 current bricklayer rates across 43 active New Jersey wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.

County / areaClassificationRateFringeTotalDetermination
AtlanticBRICKLAYER$49.60$37.96$87.56NJ20260005 Residential
BergenBRICKLAYER$49.60$37.96$87.56NJ20260006 Residential
BergenBRICKLAYER (INCLUDING CAULKING, CLEANING AND Work on high stacks: 22% per hour additional$49.60$37.96$87.56NJ20260026 Building
BergenBRICKLAYER (WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL.)$49.60$37.96$87.56NJ20260047 Heavy
BurlingtonBRICKLAYER$49.60$37.96$87.56NJ20260007 Residential
BurlingtonBRICKLAYER Work on high stacks: 22% per hour additional$45.20$33.26$78.46NJ20260027 Building
Burlington + 9 moreBRICKLAYER (HUNTERDON COUNTY (SOUTH AND EAST OF A LINE DRAWN FROM CLOVER HILL, THROUGH REAVILLE, THROUGH FLEMINGTON, THROUGH HIGH BRIDGE, THROUGH CALIFON, THROUGH FAIRMONT, TO POTTERSVILLE); MIDDLESEX COUNTY (DOES NOT INCLUDE THE BOROUGH OF DUNELLEN; TOWNSHIP OF EDISON (TOWN OF OAK TREE); TOWNSHIP OF PISCATAWAY (TOWN OF NEW MARKET); BOROUGH OF SOUTH PLAINFIELD); SOMERSET COUNTY (SOUTH OF A LINE DRAWN FROM THE POINT WHERE THE LAMINGTON RIVER LEAVES THE BOUNDARY LINE BETWEEN HUNTERDON AND SOMERSET COUNTIES; THEN, CONTINUING ALONG THE LAMINGTON RIVER TO WHERE IT BECOMES THE NORTH BRANCH OF THE RARITAN RIVER; THEN, CONTINUING ALONG THE NORTH BRANCH OF THE RARITAN RIVER TO WHERE IT BECOMES CHAMBERS BROOK; THEN, CONTINUING ALONG CHAMBERS BROOK UNTIL IT BECOMES THE BOUNDARY LINE BETWEEN THE TOWNSHIPS OF BERNARDS AND BRIDGEWATER; THEN, CONTINUING ALONG THE BOUNDARY LINE BETWEEN THE TOWNSHIPS OF BERNARDS AND BRIDGEWATER, UNTIL THAT BOUNDARY LINE INTERSECTS WITH ROUTE 78; THEN, CONTINUING ALONG ROUTE 78 UNTIL ROUTE 78 INTERSECTS WITH ROUTE 525; THEN, CONTINUING ALONG ROUTE 525 UNTIL ROUTE 525 INTERSECTS WITH THE BOUNDARY LINE BETWEEN THE TOWNSHIPS OF BRIDGEWATER AND WARREN; THEN, CONTINUING ALONG THE BOUNDARY LINE BETWEEN THE TOWNSHIPS OF BRIDGEWATER AND WARREN UNTIL THAT BOUNDARY LINE INTERSECTS WITH ROUTE 22; THEN, CONTINUING ALONG ROUTE 22 UNTIL ROUTE 22 INTERSECTS WITH SEBRINGS MILLS RD. (ALSO KNOWN AS KING GEORGE RD.); THEN, CONTINUING SOUTH ALONG SEBRINGS MILLS RD. UNTIL IT GOES OVER GREEN BROOK, WHICH IS THE MIDDLESEX COUNTY LINE)) WORK 100 DEGREES F. AND OVER: TO BE PAID AT THE RATE OF DOUBLE TIME. WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL. WORK 100 DEGREES F. AND OVER: TO BE PAID AT THE RATE OF DOUBLE TIME. WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL$49.57$37.06$86.63NJ20260001 Highway
Burlington + 9 moreBRICKLAYER WORK 100 DEGREES F. AND OVER: TO BE PAID AT THE RATE OF DOUBLE TIME. WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL$57.70$45.92$103.62NJ20260001 Highway
CamdenBRICKLAYER$49.60$37.96$87.56NJ20260008 Residential
CamdenBRICKLAYER Work on high stacks: 22% per hour additional$45.20$33.26$78.46NJ20260028 Building
Cape MayBRICKLAYER$49.60$37.96$87.56NJ20260009 Residential
Cape MayBRICKLAYER Work on high stacks: 22% per hour additional$45.20$33.26$78.46NJ20260029 Building
CumberlandBRICKLAYER$49.60$37.96$87.56NJ20260010 Residential
CumberlandBRICKLAYER Work on high stacks: 22% per hour additional$45.20$33.26$78.46NJ20260030 Building
EssexBRICKLAYER$49.60$37.96$87.56NJ20260011 Residential
EssexBRICKLAYER (INCLUDING CAULKING, CLEANING AND Work on high stacks: 22% per hour additional$49.60$37.96$87.56NJ20260031 Building
GloucesterBRICKLAYER$49.60$37.96$87.56NJ20260012 Residential
HudsonBRICKLAYER$49.60$37.96$87.56NJ20260013 Residential
HudsonBRICKLAYER (INCLUDING CAULKING, CLEANING AND Work on high stacks: 22% per hour additional$49.60$37.96$87.56NJ20260033 Building
HudsonBRICKLAYER WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL$49.60$37.96$87.56NJ20260054 Heavy
HunterdonBRICKLAYER Work on high stacks: 22% per hour additional$45.20$33.26$78.46NJ20260034 Building
Hunterdon, MiddlesexBRICKLAYER$49.60$37.96$87.56NJ20260024 Residential
MercerBRICKLAYER$49.60$37.96$87.56NJ20260014 Residential
MercerBRICKLAYER Work on high stacks: 22% per hour additional$45.20$33.26$78.46NJ20260035 Building
MiddlesexBRICKLAYER Work on high stacks: 22% per hour additional$43.56$32.50$76.06NJ20260036 Building
MonmouthBRICKLAYER$49.60$37.96$87.56NJ20260015 Residential
MonmouthBRICKLAYER Work on high stacks: 22% per hour additional$45.20$33.26$78.46NJ20260037 Building
MorrisBRICKLAYER$49.60$37.96$87.56NJ20260016 Residential
MorrisBRICKLAYER (INCLUDING CAULKING, CLEANING AND Work on high stacks: 22% per hour additional$49.60$37.96$87.56NJ20260038 Building
Morris + 10 moreBRICKLAYER (BERGEN, ESSEX AND HUDSON COUNTIES; HUNTERDON COUNTY (NORTH AND WEST OF A LINE DRAWN FROM CLOVER HILL, THROUGH REAVILLE, THROUGH FLEMINGTON, THROUGH HIGH BRIDGE, THROUGH CALIFON, THROUGH FAIRMONT, TO POTTERSVILLE); MIDDLESEX COUNTY (BOROUGH OF DUNELLEN; TOWNSHIP OF EDISON (TOWN OF OAK TREE ONLY); TOWNSHIP OF PISCATAWAY (TOWN OF NEW MARKET ONLY); BOROUGH OF SOUTH PLAINFIELD); MORRIS AND PASSAIC COUNTIES; SOMERSET COUNTY (NORTH OF A LINE DRAWN FROM THE POINT WHERE THE LAMINGTON RIVER leaves the boundary line between Hunterdon and Somerset Counties; then, continuing along the Lamington River to where it becomes the North Branch of the Raritan River; then, continuing along the North Branch of the Raritan River to where it becomes Chambers Brook; then, continuing along Chambers Brook until it becomes the boundary line between the Townships of Bernards and Bridgewater; then, continuing along the boundary line between the Townships of Bernards and Bridgewater, until that boundary line intersects with Route 78; then, continuing along Route 78 until Route 78 intersects with Route 525; then, continuing along Route 525 until Route 525 intersects with the boundary line between the Townships of Bridgewater and Warren; then, continuing along the boundary line between the Townships of Bridgewater and Warren until that boundary line intersects with Route 22; then, following Route 22 until Route 22 intersects with Sebrings Mills Rd. (also known as King George Rd.); then, continuing south on Sebrings Mills Rd. until it goes over Green Brook, which is the Middlesex County line); SUSSEX, UNION AND WARREN Work 100 degrees F. and over: to be paid at the rate of double Work on high stacks: 22% per hour additional$49.60$37.96$87.56NJ20260002 Highway
Morris + 10 moreBRICKLAYER (HUNTERDON COUNTY (south and east of a line drawn from Clover Hill, through Reaville, through Flemington, through High Bridge, through Califon, through Fairmont, to Pottersville); MIDDLESEX COUNTY (does not include the Borough of Dunellen; Township of Edison (Town of Oak Tree); Township of Piscataway (Town of New Market); Borough of South Plainfield); SOMERSET COUNTY (south of a line drawn from the point where the Lamington River leaves the boundary line between Hunterdon and Somerset Counties; then, continuing along the Lamington River to where it becomes the North Branch of the Raritan River; then, continuing along the North Branch of the Raritan River to where it becomes Chambers Brook; then, continuing along Chambers Brook until it becomes the boundary line between the Townships of Bernards and Bridgewater; then, continuing along the boundary line between the Townships of Bernards and Bridgewater, until that boundary line intersects with Route 78; then, continuing along Route 78 until Route 78 intersects with Route 525; then, continuing along Route 525 until Route 525 intersects with the boundary line between the Townships of Bridgewater and Warren; then, continuing along the boundary line between the Townships of Bridgewater and Warren until that boundary line intersects with Route 22; then, continuing along Route 22 until Route 22 intersects with Sebrings Mills Rd. (also known as King George Rd.); then, continuing south along Sebrings Mills Rd. until it goes over Green Brook, which is the Middlesex County Work 100 degrees F. and over: to be paid at the rate of double Work on high stacks: 22% per hour additional$43.56$32.50$76.06NJ20260002 Highway
OceanBRICKLAYER$49.60$37.96$87.56NJ20260017 Residential
OceanBRICKLAYER Work on high stacks: 22% per hour additional$45.20$33.26$78.46NJ20260039 Building
PassaicBRICKLAYER$49.60$37.96$87.56NJ20260018 Residential
PassaicBRICKLAYER: INCLUDING CAULKING, CLEANING AND POINTING (WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL.)$49.60$37.96$87.56NJ20260040 Building
SalemBRICKLAYER$49.60$37.96$87.56NJ20260019 Residential
SalemBRICKLAYER WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL$45.20$33.26$78.46NJ20260041 Building
SomersetBRICKLAYER$49.60$37.96$87.56NJ20260020 Residential
SomersetBRICKLAYER (WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL.)$45.20$33.26$78.46NJ20260042 Building
SussexBRICKLAYER$49.60$37.96$87.56NJ20260021 Residential
SussexBRICKLAYER: INCLUDING CAULKING, CLEANING AND POINTING (WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL.)$49.60$37.96$87.56NJ20260043 Building
UnionBRICKLAYER$49.60$37.96$87.56NJ20260022 Residential
UnionBRICKLAYER: INCLUDING CAULKING, CLEANING AND POINTING (WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL)$49.60$37.96$87.56NJ20260044 Building
WarrenBRICKLAYER$49.60$37.96$87.56NJ20260023 Residential
WarrenBRICKLAYER: INCLUDING CAULKING, CLEANING AND POINTING (WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL.)$49.60$37.96$87.56NJ20260045 Building

Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All New Jersey trades.