Laborer prevailing wages: Wisconsin, county by county
201 current laborer rates across 38 active Wisconsin wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Ashland | LABORER: COMMON OR GENERAL | $14.38 | $0.00 | $14.38 | WI20260017 Residential |
| Ashland + 51 more | LABORER, GENERAL (ASHLAND & BAYFIELD (EAST OF COUNTY TRUNK A EXCLUSIVE OF THE IRON RIVER NATIONAL FISH HATCHERY AND GREAT LAKES TRANSMISSION CO., STATION 6) COUNTIES) | $34.59 | $23.47 | $58.06 | WI20260011 Building |
| Ashland + 51 more | LABORER, GENERAL (BAYFIELD (WEST OF COUNTY TRUNK A INCLUDING THE IRON RIVER NATIONAL FISH HATCHERY AND GREAT LAKES TRANSMISSION CO., STATION 6) COUNTY) | $36.04 | $23.47 | $59.51 | WI20260011 Building |
| Ashland + 51 more | LABORER, GENERAL (BUFFALO, CRAWFORD, GRANT, JACKSON, JUNEAU, MONROE, RICHLAND, TREMPEALEAU (SOUTHERN PART), AND VERNON COUNTIES) | $37.70 | $19.97 | $57.67 | WI20260011 Building |
| Ashland + 51 more | LABORER, GENERAL: ADAMS COUNTY (ADAMS, COLUMBIA, GREEN, IOWA, JEFFERSON, LAFAYETTE, SAUK, AND WALWORTH COUNTIES) | $37.05 | $19.97 | $57.02 | WI20260011 Building |
| Ashland + 51 more | LABORER, GENERAL: AREA 1 (AREA 1: BARRON, CLARK (WEST 1/3), DUNN, PEPIN, POLK, RUSK TAYLOR (WEST 1/3) AREA 2: CLARK (EAST 2/3), LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR (EAST 2/3), VILAS, WOOD AREA 3: BURNETT, IRON, SAWYER, WASHBURN) | $37.70 | $19.97 | $57.67 | WI20260011 Building |
| Ashland + 51 more | LABORER, GENERAL: AREA 2 (AREA 1: BARRON, CLARK (WEST 1/3), DUNN, PEPIN, POLK, RUSK TAYLOR (WEST 1/3) AREA 2: CLARK (EAST 2/3), LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR (EAST 2/3), VILAS, WOOD AREA 3: BURNETT, IRON, SAWYER, WASHBURN) | $37.05 | $19.97 | $57.02 | WI20260011 Building |
| Ashland + 51 more | LABORER, GENERAL: AREA 3 (AREA 1: BARRON, CLARK (WEST 1/3), DUNN, PEPIN, POLK, RUSK TAYLOR (WEST 1/3) AREA 2: CLARK (EAST 2/3), LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR (EAST 2/3), VILAS, WOOD AREA 3: BURNETT, IRON, SAWYER, WASHBURN) | $36.35 | $19.97 | $56.32 | WI20260011 Building |
| Ashland + 51 more | LABORER, GENERAL: REMAINING AREA (ADAMS, COLUMBIA, GREEN, IOWA, JEFFERSON, LAFAYETTE, SAUK, AND WALWORTH COUNTIES) | $37.70 | $19.97 | $57.67 | WI20260011 Building |
| Ashland + 51 more | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER | $36.65 | $19.97 | $56.62 | WI20260011 Building |
| Ashland + 51 more | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (BUFFALO, CRAWFORD, GRANT, JACKSON, JUNEAU, MONROE, RICHLAND, TREMPEALEAU (SOUTHERN PART), AND VERNON COUNTIES) | $36.65 | $19.97 | $56.62 | WI20260011 Building |
| Ashland + 51 more | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (ADAMS, COLUMBIA, GREEN, IOWA, JEFFERSON, LAFAYETTE, SAUK, AND WALWORTH COUNTIES) (Adams County) | $36.65 | $19.97 | $56.62 | WI20260011 Building |
| Ashland + 51 more | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (ADAMS, COLUMBIA, GREEN, IOWA, JEFFERSON, LAFAYETTE, SAUK, AND WALWORTH COUNTIES) (Remaining Area) | $36.65 | $19.97 | $56.62 | WI20260011 Building |
| Ashland + 51 more | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (DODGE, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, PORTAGE, SHAWANO, WAUPACA,WAUSHARA) | $36.65 | $19.97 | $56.62 | WI20260011 Building |
| Ashland + 51 more | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (ASHLAND & BAYFIELD (EAST OF COUNTY TRUNK A EXCLUSIVE OF THE IRON RIVER NATIONAL FISH HATCHERY AND GREAT LAKES TRANSMISSION CO., STATION 6) COUNTIES) | $35.59 | $23.47 | $59.06 | WI20260011 Building |
| Ashland + 51 more | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (BAYFIELD (WEST OF COUNTY TRUNK A INCLUDING THE IRON RIVER NATIONAL FISH HATCHERY AND GREAT LAKES TRANSMISSION CO., STATION 6) COUNTY) | $37.04 | $23.47 | $60.51 | WI20260011 Building |
| Ashland + 51 more | LABORERS, GENERAL (DODGE, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, PORTAGE, SHAWANO, WAUPACA,WAUSHARA) | $37.05 | $19.97 | $57.02 | WI20260011 Building |
| Ashland + 51 more | LANDSCAPE LABORER | $21.52 | $18.94 | $40.46 | WI20260011 Building |
| Ashland + 71 more | LABORER GROUP 1 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $43.77 | $19.97 | $63.74 | WI20260010 Highway |
| Ashland + 71 more | LABORER GROUP 1 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $43.77 | $19.97 | $63.74 | WI20260015 Heavy |
| Ashland + 71 more | LABORER GROUP 2 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $43.87 | $19.97 | $63.84 | WI20260010 Highway |
| Ashland + 71 more | LABORER GROUP 2 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $43.87 | $19.97 | $63.84 | WI20260015 Heavy |
| Ashland + 71 more | LABORER GROUP 3 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $43.92 | $19.97 | $63.89 | WI20260010 Highway |
| Ashland + 71 more | LABORER GROUP 3 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $43.92 | $19.97 | $63.89 | WI20260015 Heavy |
| Ashland + 71 more | LABORER GROUP 4 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $44.12 | $19.97 | $64.09 | WI20260010 Highway |
| Ashland + 71 more | LABORER GROUP 4 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $44.12 | $19.97 | $64.09 | WI20260015 Heavy |
| Ashland + 71 more | LABORER GROUP 5 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $43.97 | $19.97 | $63.94 | WI20260010 Highway |
| Ashland + 71 more | LABORER GROUP 5 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $43.97 | $19.97 | $63.94 | WI20260015 Heavy |
| Ashland + 71 more | LABORER GROUP 6 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $40.40 | $19.97 | $60.37 | WI20260010 Highway |
| Ashland + 71 more | LABORER GROUP 6 (ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA, JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST. CRO | $40.40 | $19.97 | $60.37 | WI20260015 Heavy |
| Ashland + 71 more | LABORER, SEWER & WATER: GROUP 1 (ADAMS, ASHLAND, BARRON, BROWN, BUFFALO, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE,FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LACROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, ST CROIX, SAUK, SAWYER, SHAWANO, SHEBOYGAN, TAYLOR, TREMM | $36.98 | $19.97 | $56.95 | WI20260008 Heavy |
| Ashland + 71 more | LABORER, SEWER & WATER: GROUP 2 (ADAMS, ASHLAND, BARRON, BROWN, BUFFALO, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE,FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LACROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, ST CROIX, SAUK, SAWYER, SHAWANO, SHEBOYGAN, TAYLOR, TREMM | $38.83 | $19.97 | $58.80 | WI20260008 Heavy |
| Ashland + 71 more | LABORER, SEWER & WATER: GROUP 3 (ADAMS, ASHLAND, BARRON, BROWN, BUFFALO, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE,FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LACROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, ST CROIX, SAUK, SAWYER, SHAWANO, SHEBOYGAN, TAYLOR, TREMM | $39.13 | $19.97 | $59.10 | WI20260008 Heavy |
| Ashland + 71 more | LABORER, SEWER & WATER: GROUP 4 (ADAMS, ASHLAND, BARRON, BROWN, BUFFALO, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE,FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LACROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, ST CROIX, SAUK, SAWYER, SHAWANO, SHEBOYGAN, TAYLOR, TREMM | $39.78 | $19.97 | $59.75 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: GROUP 1 FLAGPERSON (DANE AND DOUGLAS COUNTIES) FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0 - 15 LBS ADD $1.00, 15- 30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $36.88 | $19.97 | $56.85 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: GROUP 1 GENERAL LABORER; TREE TRIMMER; CONDUIT LAYER; DEMOLITION AND WRECKING LABORER; GUARD RAIL, FENCE, AND BRIDGE BUILDER; LANDSCAPER; MULTIPLATE CULVERT ASSEMBLER; STONE HANDLER; BITUMINOUS WORKER (SHOVELER, LOADER, AND UTILITY MAN); BATCH TRUCK DUMPER OR CEMENT HANDLER; BITUMINIOUS WORKER (DUMPER, IRONER, SMOOTHER, AND TAMPER); CONCRETE HANDLER - (DANE COUNTY) | $44.05 | $19.97 | $64.02 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 1 GENERAL LABORER; TREE TRIMMER; CONDUIT LAYER; DEMOLITION AND WRECKING LABORER; GUARD RAIL, FENCE, AND BRIDGE BUILDER; LANDSCAPER; MULTIPLATE CULVERT ASSEMBLER; STONE HANDLER; BITUMINOUS WORKER (SHOVELER, LOADER, AND UTILITY MAN); BATCH TRUCK DUMPER OR CEMENT HANDLER; BITUMINIOUS WORKER (DUMPER, IRONER, SMOOTHER, AND TAMPER); CONCRETE HANDLER - (DANE COUNTY) | $44.05 | $19.97 | $64.02 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 1 GENERAL LABORER; TREE TRIMMER; CONDUIT LAYER; DEMOLITION AND WRECKING LABORER; GUARD RAIL, FENCE, AND BRIDGE BUILDER; LANDSCAPER; MULTIPLATE CULVERT ASSEMBLER; STONE HANDLER; BITUMINOUS WORKER (SHOVELER, LOADER, AND UTILITY MAN); BATCH TRUCK DUMPER OR CEMENT HANDLER; BITUMINOUS WORKER (DUMPER, IRONER, SMOOTHER, AND TAMPER); CONCRETE HANDLER - (KENOSHA AND RACINE COUNTIES) | $37.87 | $25.53 | $63.40 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 1 GENERAL LABORER; TREE TRIMMER; CONDUIT LAYER; DEMOLITION AND WRECKING LABORER; GUARD RAIL, FENCE, AND BRIDGE BUILDER; LANDSCAPER; MULTIPLATE CULVERT ASSEMBLER; STONE HANDLER; BITUMINOUS WORKER (SHOVELER, LOADER, AND UTILITY MAN); BATCH TRUCK DUMPER OR CEMENT HANDLER; BITUMINOUS WORKER (DUMPER, IRONER, SMOOTHER, AND TAMPER); CONCRETE HANDLER - (KENOSHA AND RACINE COUNTIES) | $37.87 | $25.53 | $63.40 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 1 GENERAL LABORER; TREE TRIMMER; CONDUIT LAYER; DEMOLITION AND WRECKING LABORER; GUARD RAIL, FENCE, AND BRIDGE BUILDER; LANDSCAPER; MULTIPLATE CULVERT ASSEMBLER; STONE HANDLER; BITUMINOUS WORKER (SHOVELER, LOADER, AND UTILITY MAN); BATCH TRUCK DUMPER OR CEMENT HANDLER; BITUMINOUS WORKER (DUMPER, IRONER, SMOOTHER, AND TAMPER); CONCRETE HANDLER - (MILWAUKEE AND WAUKESHA COUNTIES) | $38.81 | $25.53 | $64.34 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 1 GENERAL LABORER; TREE TRIMMER; CONDUIT LAYER; DEMOLITION AND WRECKING LABORER; GUARD RAIL, FENCE, AND BRIDGE BUILDER; LANDSCAPER; MULTIPLATE CULVERT ASSEMBLER; STONE HANDLER; BITUMINOUS WORKER (SHOVELER, LOADER, AND UTILITY MAN); BATCH TRUCK DUMPER OR CEMENT HANDLER; BITUMINOUS WORKER (DUMPER, IRONER, SMOOTHER, AND TAMPER); CONCRETE HANDLER - (MILWAUKEE AND WAUKESHA COUNTIES) | $38.81 | $25.53 | $64.34 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 1 GENERAL LABORER; TREE TRIMMER; CONDUIT LAYER; DEMOLITION AND WRECKING LABORER; GUARD RAIL, FENCE, AND BRIDGE BUILDER; LANDSCAPER; MULTIPLATE CULVERT ASSEMBLER; STONE HANDLER; BITUMINOUS WORKER (SHOVELER, LOADER, AND UTILITY MAN); BATCH TRUCK DUMPER OR CEMENT HANDLER; BITUMINOUS WORKER (DUMPER, IRONER, SMOOTHER, AND TAMPER); CONCRETE HANDLER - (OZAUKEE AND WASHINGTON COUNTIES) | $38.06 | $25.53 | $63.59 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 1 GENERAL LABORER; TREE TRIMMER; CONDUIT LAYER; DEMOLITION AND WRECKING LABORER; GUARD RAIL, FENCE, AND BRIDGE BUILDER; LANDSCAPER; MULTIPLATE CULVERT ASSEMBLER; STONE HANDLER; BITUMINOUS WORKER (SHOVELER, LOADER, AND UTILITY MAN); BATCH TRUCK DUMPER OR CEMENT HANDLER; BITUMINOUS WORKER (DUMPER, IRONER, SMOOTHER, AND TAMPER); CONCRETE HANDLER - (OZAUKEE AND WASHINGTON COUNTIES) | $38.06 | $25.53 | $63.59 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 2 AIR TOOL OPERATOR; JOINT SAWER AND FILLER (PAVEMENT); VIBRATOR OR TAMPER OPERATOR (MECHANICAL HAND OPERATED); CHAIN SAW OPERATOR; DEMOLITION BURNING TORCH LABORER - (DANE COUNTY) | $44.15 | $19.97 | $64.12 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 2 AIR TOOL OPERATOR; JOINT SAWER AND FILLER (PAVEMENT); VIBRATOR OR TAMPER OPERATOR (MECHANICAL HAND OPERATED); CHAIN SAW OPERATOR; DEMOLITION BURNING TORCH LABORER - (DANE COUNTY) | $44.15 | $19.97 | $64.12 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 2 AIR TOOL OPERATOR; JOINT SAWER AND FILLER (PAVEMENT); VIBRATOR OR TAMPER OPERATOR (MECHANICAL HAND OPERATED); CHAIN SAW OPERATOR; DEMOLITION BURNING TORCH LABORER - (KENOSHA AND RACINE COUNTIES) | $38.02 | $25.53 | $63.55 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 2 AIR TOOL OPERATOR; JOINT SAWER AND FILLER (PAVEMENT); VIBRATOR OR TAMPER OPERATOR (MECHANICAL HAND OPERATED); CHAIN SAW OPERATOR; DEMOLITION BURNING TORCH LABORER - (KENOSHA AND RACINE COUNTIES) | $38.02 | $25.53 | $63.55 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 2 AIR TOOL OPERATOR; JOINT SAWER AND FILLER (PAVEMENT); VIBRATOR OR TAMPER OPERATOR (MECHANICAL HAND OPERATED); CHAIN SAW OPERATOR; DEMOLITION BURNING TORCH LABORER - (MILWAUKEE AND WAUKESHA COUNTIES) | $38.96 | $25.53 | $64.49 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 2 AIR TOOL OPERATOR; JOINT SAWER AND FILLER (PAVEMENT); VIBRATOR OR TAMPER OPERATOR (MECHANICAL HAND OPERATED); CHAIN SAW OPERATOR; DEMOLITION BURNING TORCH LABORER - (MILWAUKEE AND WAUKESHA COUNTIES) | $38.96 | $25.53 | $64.49 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 2 AIR TOOL OPERATOR; JOINT SAWER AND FILLER (PAVEMENT); VIBRATOR OR TAMPER OPERATOR (MECHANICAL HAND OPERATED); CHAIN SAW OPERATOR; DEMOLITION BURNING TORCH LABORER (OZAUKEE AND WASHINGTON COUNTIES) | $38.16 | $25.53 | $63.69 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 2 AIR TOOL OPERATOR; JOINT SAWER AND FILLER (PAVEMENT); VIBRATOR OR TAMPER OPERATOR (MECHANICAL HAND OPERATED); CHAIN SAW OPERATOR; DEMOLITION BURNING TORCH LABORER (OZAUKEE AND WASHINGTON COUNTIES) | $38.16 | $25.53 | $63.69 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 2 GENERAL LABORER; WELLPOINT INSTALLATION; CONCRETE WORKER; FORM STRIPPER; STRIKE OFF WORKER (DANE AND DOUGLAS COUNTIES) FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0 - 15 LBS ADD $1.00, 15- 30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $39.08 | $19.97 | $59.05 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: GROUP 3 BITUMINOUS WORKER (RAKER AND LUTEMAN); FORMSETTER (CURB, SIDEWALK, AND PAVEMENT); STRIKE OFF MAN - (DANE COUNTY) | $44.20 | $19.97 | $64.17 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 3 BITUMINOUS WORKER (RAKER AND LUTEMAN); FORMSETTER (CURB, SIDEWALK, AND PAVEMENT); STRIKE OFF MAN - (DANE COUNTY) | $44.20 | $19.97 | $64.17 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 3 BITUMINOUS WORKER (RAKER AND LUTEMAN); FORMSETTER (CURB, SIDEWALK, AND PAVEMENT); STRIKE OFF MAN - (KENOSHA AND RACINE COUNTIES) | $38.22 | $25.53 | $63.75 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 3 BITUMINOUS WORKER (RAKER AND LUTEMAN); FORMSETTER (CURB, SIDEWALK, AND PAVEMENT); STRIKE OFF MAN - (KENOSHA AND RACINE COUNTIES) | $38.22 | $25.53 | $63.75 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 3 BITUMINOUS WORKER (RAKER AND LUTEMAN); FORMSETTER (CURB, SIDEWALK, AND PAVEMENT); STRIKE OFF MAN - (MILWAUKEE AND WAUKESHA COUNTIES) | $39.16 | $25.53 | $64.69 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 3 BITUMINOUS WORKER (RAKER AND LUTEMAN); FORMSETTER (CURB, SIDEWALK, AND PAVEMENT); STRIKE OFF MAN - (MILWAUKEE AND WAUKESHA COUNTIES) | $39.16 | $25.53 | $64.69 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 3 BITUMINOUS WORKER (RAKER AND LUTEMAN); FORMSETTER (CURB, SIDEWALK, AND PAVEMENT); STRIKE OFF MAN - (OZAUKEE AND WASHINGTON COUNTIES) | $38.21 | $25.53 | $63.74 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 3 BITUMINOUS WORKER (RAKER AND LUTEMAN); FORMSETTER (CURB, SIDEWALK, AND PAVEMENT); STRIKE OFF MAN - (OZAUKEE AND WASHINGTON COUNTIES) | $38.21 | $25.53 | $63.74 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 3 SHEETING FORMSETTING; PATCH FINISHER; BOTTOM MAN; JOINT SAWER; GUNNITE MAN; MANHOLE BUILDER; WELDER; TORCHMAN; BLASTER; CAULKER BRACER; BULL FLOAT; MUCKER AND CAR PUSHER; RAKER AND LUTEMAN; HYDRAULIC JACKING OF SHIELDS, SHIELD DIRVERS; MINING MACHINE; LOCK TENDERS; MUCKING MACHINE OPERATORS; MOTOR MEN AND GAUGE TENDERS; POWER TOOL OPERATORS (DANE AND DOUGLAS COUNTIES) FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0 - 15 LBS ADD $1.00, 15- 30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $39.38 | $19.97 | $59.35 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: GROUP 4 LINE AND GRADE SPECIALIST (DANE COUNTY) | $44.40 | $19.97 | $64.37 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 4 LINE AND GRADE SPECIALIST (DANE COUNTY) | $44.40 | $19.97 | $64.37 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 4 LINE AND GRADE SPECIALIST (KENOSHA AND RACINE COUNTIES) | $38.19 | $25.53 | $63.72 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 4 LINE AND GRADE SPECIALIST (KENOSHA AND RACINE COUNTIES) | $38.19 | $25.53 | $63.72 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 4 LINE AND GRADE SPECIALIST (MILWAUKEE AND WAUKESHA COUNTIES) | $39.31 | $25.53 | $64.84 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 4 LINE AND GRADE SPECIALIST (MILWAUKEE AND WAUKESHA COUNTIES) | $39.31 | $25.53 | $64.84 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 4 LINE AND GRADE SPECIALIST (OZAUKEE AND WASHINGTON COUNTIES) | $38.41 | $25.53 | $63.94 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 4 LINE AND GRADE SPECIALIST (OZAUKEE AND WASHINGTON COUNTIES) | $38.41 | $25.53 | $63.94 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 4 PIPELAYER, MINER, AND LASER OPERATOR (DANE AND DOUGLAS COUNTIES) FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0 - 15 LBS ADD $1.00, 15- 30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $40.03 | $19.97 | $60.00 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: GROUP 5 BLASTER AND POWDERMAN (KENOSHA AND RACINE COUNTIES) | $38.52 | $25.53 | $64.05 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 5 BLASTER AND POWDERMAN (KENOSHA AND RACINE COUNTIES) | $38.52 | $25.53 | $64.05 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 5 BLASTER AND POWDERMAN (MILWAUKEE AND WAUKESHA COUNTIES) | $39.46 | $25.53 | $64.99 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 5 BLASTER AND POWDERMAN (MILWAUKEE AND WAUKESHA COUNTIES) | $39.46 | $25.53 | $64.99 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 5 BLASTER; POWDERMAN (DANE COUNTY) | $44.25 | $19.97 | $64.22 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 5 BLASTER; POWDERMAN (DANE COUNTY) | $44.25 | $19.97 | $64.22 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 5 BLASTER; POWDERMAN (OZAUKEE AND WASHINGTON COUNTIES) | $38.26 | $25.53 | $63.79 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 5 BLASTER; POWDERMAN (OZAUKEE AND WASHINGTON COUNTIES) | $38.26 | $25.53 | $63.79 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 6 FLAGMAN; TRAFFIC CONTROL PERSON (KENOSHA AND RACINE COUNTIES) | $35.02 | $25.53 | $60.55 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 6 FLAGMAN; TRAFFIC CONTROL PERSON (KENOSHA AND RACINE COUNTIES) | $35.02 | $25.53 | $60.55 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 6 FLAGPERSON AND TRAFFIC CONTROL PERSON - (DANE COUNTY) | $40.40 | $19.97 | $60.37 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 6 FLAGPERSON AND TRAFFIC CONTROL PERSON - (DANE COUNTY) | $40.40 | $19.97 | $60.37 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 6 FLAGPERSON AND TRAFFIC CONTROL PERSON (OZAUKEE AND WASHINGTON COUNTIES) | $35.15 | $25.53 | $60.68 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 6 FLAGPERSON AND TRAFFIC CONTROL PERSON (OZAUKEE AND WASHINGTON COUNTIES) | $35.15 | $25.53 | $60.68 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: GROUP 6 FLAGPERSON; TRAFFIC CONTROL PERSON (MILWAUKEE AND WAUKESHA COUNTIES) | $35.30 | $25.53 | $60.83 | WI20260010 Highway |
| Ashland + 71 more | LABORER: GROUP 6 FLAGPERSON; TRAFFIC CONTROL PERSON (MILWAUKEE AND WAUKESHA COUNTIES) | $35.30 | $25.53 | $60.83 | WI20260015 Heavy |
| Ashland + 71 more | LABORER: OPEN CUT: GROUP 1 YARD LABORER (MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES) | $19.99 | $24.42 | $44.41 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: OPEN CUT: GROUP 2 LANDSCAPER (MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES) | $22.54 | $24.42 | $46.96 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: OPEN CUT: GROUP 3 FLAG PERSON (MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES) | $26.53 | $24.42 | $50.95 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: OPEN CUT: GROUP 4 PAVING LABORER (MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES) | $37.05 | $24.42 | $61.47 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: OPEN CUT: GROUP 5 GENERAL LABORER ON SURFACE; TOP MAN (MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES) | $37.23 | $24.42 | $61.65 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: OPEN CUT: GROUP 6 MUD MIXER (MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES) | $37.29 | $24.42 | $61.71 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: OPEN CUT: GROUP 7 MUCKER; FORM STRIPPER; BOTTOM DIGGER AND MISC; BOTTOM MAN AND WELDER ON SURFACE (MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES) | $41.62 | $24.42 | $66.04 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: OPEN CUT: GROUP 8 CONCRETE MANHOLE BUILDER; CAISSON WORKER; MINER; PIPE LAYER; ROCK DRILLER AND JOINT MAN; TIMBER MAN AND CONCRETE BRUSHER; BRACER IN TRENCH BEHIND MACHINE & TIGHT SHEETING; CONCRETE FORMSETTER AND SHOVELER; JACKHAMMER OPERATOR (MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES) | $44.78 | $24.42 | $69.20 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: OPEN CUT: GROUP 9 BLASTER (MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES) | $45.51 | $24.42 | $69.93 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: SEWER & WATER: GROUP 1 FLAGPERSON (BAYFIELD, BURNETT, IRON, SAWYER, AND WASHBURN COUNTIES) FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0 - 15 LBS ADD $1.00, 15-30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $36.67 | $19.97 | $56.64 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: SEWER & WATER: GROUP 2 LABORERS, WELLPOINT INSTALLATION; FORM STRIPPER; STRIKE OFF WORKER (BAYFIELD, BURNETT, IRON, SAWYER, AND WASHBURN COUNTIES) FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0 - 15 LBS ADD $1.00, 15-30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $38.73 | $19.97 | $58.70 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: SEWER & WATER: GROUP 3 SHEETING FORMSETTING; PATCH FINISHER; BOTTOM MAN; JOINT SAWER; GUNNITE MAN; MANHOLE BUILDER; WELDER; TORCHMAN; BLASTER; CAULKER BRACER; BULL FLOAT; MUCKER AND CAR PUSHER; RAKER AND LUTEMAN; HYDRAULIC JACKING OF SHIELDS, SHIELD DIRVERS; MINING MACHINE; LOCK TENDERS; MUCKING MACHINE OPERATORS; MOTOR MEN AND GAUGE TENDERS; POWER TOOL OPERATORS (BAYFIELD, BURNETT, IRON, SAWYER, AND WASHBURN COUNTIES) FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0 - 15 LBS ADD $1.00, 15-30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $39.03 | $19.97 | $59.00 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: SEWER & WATER: GROUP 4 PIPELAYER, MINER, AND LASER OPERATOR (BAYFIELD, BURNETT, IRON, SAWYER, AND WASHBURN COUNTIES) FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0 - 15 LBS ADD $1.00, 15-30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $39.68 | $19.97 | $59.65 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: SEWER, TUNNEL & UNDERGROUND: GROUP 1 FLAGPERSON (KENOSHA AND RACINE COUNTIES) TUNNEL WORK UNDER COMPRESSED AIR: 0-15 LBS ADD $1.00, 15-30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $27.49 | $24.42 | $51.91 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: SEWER, TUNNEL & UNDERGROUND: GROUP 2 TOP MAN, GENERAL LABORER, WELLPOINT INSTALLATION, WIRE MESH AND REINFORCEMENT, CONCRETE WORKER, FORM STRIPPER, STRIKE-OFF WORK (KENOSHA AND RACINE COUNTIES) TUNNEL WORK UNDER COMPRESSED AIR: 0-15 LBS ADD $1.00, 15-30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $34.17 | $24.42 | $58.59 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: SEWER, TUNNEL & UNDERGROUND: GROUP 3: MACHINE AND EQUIPMENT OPERATOR, SHEETING, FORM SETTING, PATCH FINISHER, BOTTOM MAN, JOINT SAWER, GUNNITE MAN, MANHOLE BUILDER, WELDER-TORCHMAN, BLASTER, CAULKER, BRACER, BULL FLOAT, CONDUIT WORKER, MUCKER AND CAR PUSHER, RAKER AND LUTEMAN, HYDRAULIC JACKING OF SHIELDS, SHIELD DRIVERS, MINING MACHINE, LOCK TENDERS, MUCKING MACHINE OPERATOR, MOTOR MEN & GAUGE TENDERS AND OPERATION OF INCIDENTAL MECHANICAL EQUIPMENT AND ALL POWER DRIVEN TOOLS (KENOSHA AND RACINE COUNTIES) TUNNEL WORK UNDER COMPRESSED AIR: 0-15 LBS ADD $1.00, 15-30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $38.89 | $24.42 | $63.31 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: SEWER, TUNNEL & UNDERGROUND: GROUP 4 PIPELAYER, MINER AND LASER OPERATOR (KENOSHA AND RACINE COUNTIES) TUNNEL WORK UNDER COMPRESSED AIR: 0-15 LBS ADD $1.00, 15-30 LBS ADD $2.00, OVER 30 LBS ADD $3.00 | $40.88 | $24.42 | $65.30 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL - | $43.27 | $24.42 | $67.69 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL - | $46.30 | $24.42 | $70.72 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL - | $46.99 | $24.42 | $71.41 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL - | $26.53 | $24.42 | $50.95 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL - | $37.23 | $24.42 | $61.65 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL - | $42.22 | $24.42 | $66.64 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL - | $43.12 | $24.42 | $67.54 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL-FREE AIR: GROUP 1 FLAGPERSON (MILWAUKEE, OZAUKEE, WASHINGTON & WAUKESHA COUNTIES) | $26.53 | $24.42 | $50.95 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL-FREE AIR: GROUP 2 GENERAL LABORER ON SURFACE; TOWER MAN (MILWAUKEE, OZAUKEE, WASHINGTON & WAUKESHA COUNTIES) | $37.23 | $24.42 | $61.65 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL-FREE AIR: GROUP 3 SAW MAN; TOP MAN (MILWAUKEE, OZAUKEE, WASHINGTON & WAUKESHA COUNTIES) | $37.29 | $24.42 | $61.71 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL-FREE AIR: GROUP 4 FORM STRIPPER; CAR PUSHER (MILWAUKEE, OZAUKEE, WASHINGTON & WAUKESHA COUNTIES) | $41.62 | $24.42 | $66.04 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL-FREE AIR: GROUP 5 MUCKER; DINKEY; WELDER (RATE ON SURFACE) (MILWAUKEE, OZAUKEE, WASHINGTON & WAUKESHA COUNTIES) | $41.77 | $24.42 | $66.19 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL-FREE AIR: GROUP 6 CONCRETE MANHOLE BUILDER; MUCKING MACHINE; MINER; MINING MACHINE; WELDER; ROCK DRILLER; CONCRETE BUSTER; JACK HAMMER OPERATOR; CAISSON WORKER; PIPELAYER AND JOINT MAN; BRACERMAN (MILWAUKEE, OZAUKEE, WASHINGTON & WAUKESHA COUNTIES) | $44.78 | $24.42 | $69.20 | WI20260008 Heavy |
| Ashland + 71 more | LABORER: TUNNEL-FREE AIR: GROUP 7 BLASTER (MILWAUKEE, OZAUKEE, WASHINGTON & WAUKESHA COUNTIES) | $45.51 | $24.42 | $69.93 | WI20260008 Heavy |
| Bayfield + 13 more | LABORER: COMMON OR GENERAL | $14.77 | $0.00 | $14.77 | WI20260021 Residential |
| Brown | LABORER, GENERAL | $37.05 | $19.97 | $57.02 | WI20260014 Building |
| Brown | LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 | WI20260014 Building |
| Brown | LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 | WI20260014 Building |
| Brown, Kewaunee, Oconto | LABORER: COMMON OR GENERAL; MASON TENDER - BRICK | $23.90 | $16.48 | $40.38 | WI20260033 Residential |
| Buffalo + 9 more | LABORER: COMMON OR GENERAL | $23.36 | $0.00 | $23.36 | WI20260022 Residential |
| Calumet + 3 more | LABORER, GENERAL | $37.05 | $19.97 | $57.02 | WI20260016 Building |
| Calumet + 3 more | LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 | WI20260016 Building |
| Calumet + 3 more | LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 | WI20260016 Building |
| Calumet, Outagamie | LABORER: COMMON OR GENERAL; MASON TENDER - BRICK | $23.90 | $16.48 | $40.38 | WI20260034 Residential |
| Chippewa | LABORER: COMMON OR GENERAL; MASON TENDER - BRICK | $23.90 | $16.48 | $40.38 | WI20260025 Residential |
| Chippewa, Eau Claire | LABORER, GENERAL | $37.70 | $19.97 | $57.67 | WI20260006 Building |
| Chippewa, Eau Claire | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS | $36.65 | $19.97 | $56.62 | WI20260006 Building |
| Chippewa, Eau Claire | LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 | WI20260006 Building |
| Chippewa, Eau Claire | LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 | WI20260006 Building |
| Columbia, Dane, Iowa | LABORER: COMMON OR GENERAL | $21.67 | $4.10 | $25.77 | WI20260035 Residential |
| Columbia, Dane, Iowa | LABORER: MASON TENDER - BRICK | $23.90 | $16.48 | $40.38 | WI20260035 Residential |
| Dane | LABORER, GENERAL | $37.70 | $19.97 | $57.67 | WI20260005 Building |
| Dane | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER (PREPARATION, REMOVAL, AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $36.65 | $19.97 | $56.62 | WI20260005 Building |
| Dane | LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 | WI20260005 Building |
| Dane | LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 | WI20260005 Building |
| Dodge + 5 more | LABORER: COMMON OR GENERAL | $20.99 | $0.00 | $20.99 | WI20260023 Residential |
| Door, Manitowoc | LABORER: COMMON OR GENERAL | $23.36 | $0.00 | $23.36 | WI20260024 Residential |
| Douglas | LABORER, GENERAL | $36.04 | $23.47 | $59.51 | WI20260007 Building |
| Douglas | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER | $37.04 | $23.47 | $60.51 | WI20260007 Building |
| Douglas | LABORERS: (CONCRETE WORKERS) | $16.34 | $3.59 | $19.93 | WI20260007 Building |
| Douglas | LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 | WI20260007 Building |
| Douglas, Fond Du Lac, Marathon | LABORER: COMMON OR GENERAL; MASON TENDER - BRICK (DOUGLAS COUNTY) | $23.90 | $16.48 | $40.38 | WI20260036 Residential |
| Douglas, Fond Du Lac, Marathon | LABORER: COMMON OR GENERAL; MASON TENDER - BRICK (FOND DU LAC & MARATHON COUNTIES) | $23.90 | $16.48 | $40.38 | WI20260036 Residential |
| Florence + 11 more | LABORER: COMMON OR GENERAL | $16.22 | $0.00 | $16.22 | WI20260020 Residential |
| Kenosha | LABORER (GENERAL LABORER) | $38.71 | $24.42 | $63.13 | WI20260004 Building |
| Kenosha | LABORER (PLASTER LABORER, MASON TENDER) | $38.92 | $24.42 | $63.34 | WI20260004 Building |
| Kenosha | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER (PREPARATION, REMOVAL, AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $31.67 | $24.68 | $56.35 | WI20260004 Building |
| Kenosha | LABORER: COMMON OR GENERAL | $18.64 | $9.33 | $27.97 | WI20260026 Residential |
| Kenosha | LABORER: MASON TENDER - BRICK | $21.65 | $18.73 | $40.38 | WI20260026 Residential |
| Kenosha | LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 | WI20260004 Building |
| Kenosha | LABORERS: LANDSCAPE | $8.73 | $5.75 | $14.48 | WI20260004 Building |
| La Crosse | LABORER, GENERAL | $37.70 | $19.97 | $57.67 | WI20260003 Building |
| La Crosse | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER | $36.65 | $19.97 | $56.62 | WI20260003 Building |
| La Crosse | LABORERS: (CONCRETE WORKERS) | $16.34 | $3.59 | $19.93 | WI20260003 Building |
| La Crosse | LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 | WI20260003 Building |
| Marathon | LABORER, GENERAL | $37.05 | $19.97 | $57.02 | WI20260002 Building |
| Marathon | LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 | WI20260002 Building |
| Marathon | LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 | WI20260002 Building |
| Milwaukee | LABORER: COMMON OR GENERAL | $16.24 | $7.25 | $23.49 | WI20260027 Residential |
| Milwaukee | LABORER: MASON TENDER - BRICK | $21.65 | $18.73 | $40.38 | WI20260027 Residential |
| Milwaukee + 3 more | ASBESTOS LABORER (ASBESTOS ABATEMENT [PREPARATION, REMOVAL, AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS]) | $40.48 | $23.92 | $64.40 | WI20260001 Building |
| Milwaukee + 3 more | LABORER: (1) GENERAL LABORER (INCLUDING PLASTER TENDER) | $40.48 | $23.92 | $64.40 | WI20260001 Building |
| Milwaukee + 3 more | LABORER: (2) AIR & ELECTRIC EQUIPMENT, MORTAR MIXER, SCAFFOLD BUILDER, ERECTOR, AND SWING STAGE | $40.62 | $23.92 | $64.54 | WI20260001 Building |
| Milwaukee + 3 more | LABORER: (3) JACKHAMMER OPERATOR, GUNNITE MACHINE MAN | $40.77 | $23.92 | $64.69 | WI20260001 Building |
| Milwaukee + 3 more | LABORER: (4) CAISSON WORKER - TOPMAN | $40.86 | $23.92 | $64.78 | WI20260001 Building |
| Milwaukee + 3 more | LABORER: (5) CONSTRUCTION SPECIALIST | $41.09 | $23.92 | $65.01 | WI20260001 Building |
| Milwaukee + 3 more | LABORER: (6) NOZZLEMAN | $41.13 | $23.92 | $65.05 | WI20260001 Building |
| Milwaukee + 3 more | LABORER: (7) CAISSON WORK | $41.28 | $23.92 | $65.20 | WI20260001 Building |
| Milwaukee + 3 more | LABORER: (8) BARCO TAMPER | $41.97 | $23.92 | $65.89 | WI20260001 Building |
| Milwaukee + 3 more | LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 | WI20260001 Building |
| Milwaukee + 3 more | LABORERS: LANDSCAPE | $8.73 | $8.40 | $17.13 | WI20260001 Building |
| Monroe | LABORER: COMMON OR GENERAL | $29.50 | $0.00 | $29.50 | WI20260018 Residential |
| Ozaukee, Washington | LABORER: COMMON OR GENERAL | $18.64 | $9.33 | $27.97 | WI20260038 Residential |
| Ozaukee, Washington | LABORER: MASON TENDER - BRICK | $21.65 | $18.73 | $40.38 | WI20260038 Residential |
| Pierce + 3 more | LABORER: COMMON OR GENERAL; MASON TENDER - BRICK (EAU CLAIRE, PIERCE & ST. CROIX COUNTIES) | $23.90 | $16.48 | $40.38 | WI20260037 Residential |
| Pierce + 3 more | LABORER: COMMON OR GENERAL; MASON TENDER - BRICK (LA CROSSE COUNTY) | $23.90 | $16.48 | $40.38 | WI20260037 Residential |
| Pierce, St Croix | LABORER, GENERAL | $37.70 | $19.97 | $57.67 | WI20260013 Building |
| Pierce, St Croix | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS | $36.65 | $19.97 | $56.62 | WI20260013 Building |
| Pierce, St Croix | LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 | WI20260013 Building |
| Pierce, St Croix | LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 | WI20260013 Building |
| Racine | LABORER (GENERAL LABORER) | $38.71 | $24.42 | $63.13 | WI20260009 Building |
| Racine | LABORER (PLASTER LABORER, MASON TENDER) | $38.92 | $24.42 | $63.34 | WI20260009 Building |
| Racine | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER (PREPARATION, REMOVAL, AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $31.67 | $24.68 | $56.35 | WI20260009 Building |
| Racine | LABORER: COMMON OR GENERAL | $18.64 | $9.33 | $27.97 | WI20260028 Residential |
| Racine | LABORER: MASON TENDER - BRICK | $21.65 | $18.73 | $40.38 | WI20260028 Residential |
| Racine | LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 | WI20260009 Building |
| Racine | LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 | WI20260009 Building |
| Rock | LABORER, GENERAL | $37.70 | $19.97 | $57.67 | WI20260012 Building |
| Rock | LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER (PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $36.65 | $19.97 | $56.62 | WI20260012 Building |
| Rock | LABORER: COMMON OR GENERAL | $21.67 | $4.10 | $25.77 | WI20260029 Residential |
| Rock | LABORER: MASON TENDER - BRICK | $23.90 | $16.48 | $40.38 | WI20260029 Residential |
| Rock | LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 | WI20260012 Building |
| Rock | LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 | WI20260012 Building |
| Rusk | LABORER: COMMON OR GENERAL | $17.00 | $3.45 | $20.45 | WI20260019 Residential |
| Sheboygan | LABORER: COMMON OR GENERAL; MASON TENDER - BRICK | $23.90 | $16.48 | $40.38 | WI20260030 Residential |
| Waukesha | LABORER: COMMON OR GENERAL | $18.52 | $7.86 | $26.38 | WI20260031 Residential |
| Waukesha | LABORER: MASON TENDER - BRICK | $21.65 | $18.73 | $40.38 | WI20260031 Residential |
| Winnebago | LABORER: COMMON OR GENERAL; MASON TENDER - BRICK | $23.90 | $16.48 | $40.38 | WI20260032 Residential |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Wisconsin trades.