| PILEDRIVERMAN | $44.39 | $34.79 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.88 | $38.15 |
| BOILERMAKER (BOILERMAKER) | $46.52 | $34.63 |
| TILE SETTER | $39.19 | $28.90 |
| BRICKLAYER | $44.71 | $28.90 |
| CARPENTER & SOFT FLOOR LAYER (INCLUDING ACOUSTICAL WORK AND DRYWALL HANGING; EXCLUDING BATT INSULATION) | $45.46 | $31.52 |
| MILLWRIGHT | $44.03 | $32.94 |
| ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA, AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK) | $31.17 | $20.08 |
| ELECTRICIAN (EXCEPT BURLINGTON TOWNSHIP) | $48.50 | $26.25 |
| ELECTRICIAN (BURLINGTON TOWNSHIP) | $43.65 | $23.59 |
| ELEVATOR MECHANIC. | $61.96 | $38.44 |
| EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $43.59 | $28.55 |
| PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR LEVEL "C" PROTECTION: $1.00 PER HOUR | $48.74 | $28.55 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $52.72 | $28.55 |
| EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $54.21 | $28.55 |
| PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR LEVEL "C" PROTECTION: $1.00 PER HOUR | $54.71 | $28.55 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH OR W/O ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; OR CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS MEASURING 176 FEET OR LONGER; SELF-ERECTING TOWER CRANES OVER 4000 LBS LIFTING CAPACITY; ALL CRANES WITH BOOM DOLLIES; BORING MACHINES (DIRECTIONAL); MASTER MECHANIC | $0.50 | — |
| LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $55.21 | $28.55 |
| IRONWORKER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $47.52 | $33.67 |
| LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER (PREPARATION, REMOVAL, AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $31.67 | $24.68 |
| LABORER (PLASTER LABORER, MASON TENDER) | $38.92 | $24.42 |
| LABORER (GENERAL LABORER) | $38.71 | $24.42 |
| PAINTERS: (SPRAY, SANDBLAST) | $44.64 | $23.35 |
| PAINTERS: (BRUSH, ROLLER, DRYWALL FINISHER) | $43.64 | $23.35 |
| GLAZIER | $49.79 | $25.15 |
| PLASTERER | $37.20 | $30.92 |
| CEMENT MASON/CONCRETE FINISHER | $38.04 | $31.38 |
| PLUMBER/PIPEFITTER (INCLUDING HVAC WORK) | $57.35 | $29.37 |
| SPRINKLER FITTER | $51.68 | $29.73 |
| SHEET METAL WORKER | $48.92 | $38.21 |
| TILE & MARBLE FINISHER | $13.89 | $8.60 |
| ROOFER | $18.01 | $3.28 |
| LABORERS: LANDSCAPE | $8.73 | $4.90 |
| LABORERS: CONCRETE WORKER | $16.34 | $3.59 |
| ASBESTOS WORKER/HEAT AND FROST INSULATOR | $25.36 | $8.37 |
| TRUCK DRIVER (3 OR MORE AXLES) | $39.72 | $28.70 |