Wage determination WI20260003

Wisconsin · Building · Active · Standard

La Crosse

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1) · download CSV

ClassificationRateFringe
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT)$45.88$38.15
BOILERMAKER (BOILERMAKER)$46.52$34.63
BRICKLAYER & TILE SETTER$40.09$28.10
MILLWRIGHT$42.00$28.85
SOFT FLOOR LAYER$41.43$29.99
CARPENTER (INCLUDING ACOUSTICAL WORK, DRYWALL HANGING, PILEDRIVERMAN; EXCLUDING BATT INSULATION)$41.43$29.99
ELECTRICIAN$44.29$25.21
ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA, AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK)$31.17$20.08
ELEVATOR MECHANIC.$65.17$38.44
EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$41.60$27.89
EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$43.13$27.89
HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$45.20$27.89
PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$45.73$27.89
LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$49.28$27.89
PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$50.53$27.89
IRONWORKER$44.00$32.66
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER SCALE; PIPELAYER $1.00 OVER GENERAL LABORER SCALE$36.65$19.97
LABORER, GENERAL. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER SCALE; PIPELAYER $1.00 OVER GENERAL LABORER SCALE$37.70$19.97
PAINTER$22.99$13.29
PLASTERER$39.75$25.10
CEMENT MASON/CONCRETE FINISHER$37.25$27.84
PLUMBER/PIPEFITTER (INCLUDING HVAC WORK)$50.94$25.98
SPRINKLER FITTER$51.68$29.73
SHEET METAL WORKER (INCLUDING HVAC DUCT WORK AND TECHNICIANS)$45.63$29.02
TILE & MARBLE FINISHER$13.89$8.33
ROOFER$18.01$3.28
LABORERS: LANDSCAPE$8.73$4.90
LABORERS: (CONCRETE WORKERS)$16.34$3.59
ASBESTOS WORKER/HEAT AND FROST INSULATOR$25.36$8.37
TRUCK DRIVER (3 OR MORE AXLES)$39.72$28.70