Wage determination WI20260001
Wisconsin · Building · Active · Standard
MilwaukeeOzaukeeWashingtonWaukesha
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1) · download CSV
| Classification | Rate | Fringe |
|---|---|---|
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.88 | $38.15 |
| BOILERMAKER (BOILERMAKER) | $46.52 | $34.63 |
| TILE LAYER | $41.27 | $26.78 |
| TERRAZZO WORKER | $42.24 | $26.78 |
| BRICKLAYER | $45.72 | $27.42 |
| MARBLE MASON | $45.72 | $27.42 |
| CARPENTER & SOFT FLOOR LAYER (INCLUDING ACOUSTICAL WORK AND DRYWALL HANGING; EXCLUDING BATT INSULATION) | $45.46 | $31.52 |
| MILLWRIGHT | $44.03 | $32.94 |
| PILEDRIVERMAN | $44.39 | $34.79 |
| ELECTRICIAN | $50.86 | $28.26 |
| SOUND & COMMUNICATIONS (TECHNICIAN) | $37.13 | $21.58 |
| SOUND & COMMUNICATIONS (INSTALLER) | $37.13 | $21.58 |
| ELEVATOR MECHANIC. | $61.96 | $38.44 |
| EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $43.59 | $28.55 |
| PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR LEVEL "C" PROTECTION: $1.00 PER HOUR | $48.74 | $28.55 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $52.72 | $28.55 |
| EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $54.21 | $28.55 |
| PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR LEVEL "C" PROTECTION: $1.00 PER HOUR | $54.71 | $28.55 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH OR W/O ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; OR CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS MEASURING 176 FEET OR LONGER; SELF-ERECTING TOWER CRANES OVER 4000 LBS LIFTING CAPACITY; ALL CRANES WITH BOOM DOLLIES; BORING MACHINES (DIRECTIONAL); MASTER MECHANIC | $0.50 | — |
| LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $55.21 | $28.55 |
| IRONWORKER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $47.52 | $33.67 |
| LABORER: (8) BARCO TAMPER | $41.97 | $23.92 |
| LABORER: (7) CAISSON WORK | $41.28 | $23.92 |
| LABORER: (6) NOZZLEMAN | $41.13 | $23.92 |
| LABORER: (5) CONSTRUCTION SPECIALIST | $41.09 | $23.92 |
| LABORER: (4) CAISSON WORKER - TOPMAN | $40.86 | $23.92 |
| LABORER: (3) JACKHAMMER OPERATOR, GUNNITE MACHINE MAN | $40.77 | $23.92 |
| LABORER: (2) AIR & ELECTRIC EQUIPMENT, MORTAR MIXER, SCAFFOLD BUILDER, ERECTOR, AND SWING STAGE | $40.62 | $23.92 |
| LABORER: (1) GENERAL LABORER (INCLUDING PLASTER TENDER) | $40.48 | $23.92 |
| ASBESTOS LABORER (ASBESTOS ABATEMENT [PREPARATION, REMOVAL, AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS]) | $40.48 | $23.92 |
| PAINTERS: (3) DRYWALL TAPER/FINISHER | $42.79 | $24.87 |
| PAINTERS: (2) SPRAY & SANDBLAST | $43.19 | $24.87 |
| PAINTERS: (1) BRUSH, ROLLER | $42.44 | $24.87 |
| GLAZIER | $49.79 | $25.15 |
| CEMENT MASON/CONCRETE FINISHER | $43.27 | $25.69 |
| PLASTERER | $39.89 | $28.04 |
| PLUMBER (INCLUDING HVAC WORK) | $60.05 | $27.90 |
| PIPEFITTER (INCLUDING HVAC WORK) | $58.92 | $31.34 |
| SPRINKLER FITTER | $52.40 | $34.31 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK AND TECHNICIANS) | $58.03 | $29.98 |
| TILE & MARBLE FINISHER | $13.89 | $7.43 |
| ROOFER | $18.01 | $3.28 |
| LABORERS: LANDSCAPE | $8.73 | $8.40 |
| LABORERS: CONCRETE WORKER | $16.34 | $3.59 |
| ASBESTOS WORKER/HEAT AND FROST INSULATOR | $25.36 | $8.37 |
| TRUCK DRIVER (3 OR MORE AXLES) | $39.72 | $28.70 |