Residential construction wages: Racine, Wisconsin
Wage determination WI20260028 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/WI20260028 on · latest revision 1 · verify at sam.gov/wage-determination/WI20260028/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $45.46 | $31.52 | $76.98 |
| ELECTRICIAN | $33.87 | $18.32 | $52.19 |
| ELECTRICIAN (THAT PORTION OF BURLINGTON TOWNSHIP FROM THE FOX RIVER TO THE WEST BOUNDARY OF BURLINGTON TOWNSHIP AND FROM 1 1/2 MILES SOUTH OF THE NORTH BOUNDARY OF BURLINGTON TOWNSHIP TO 3 1/2 MILES NORTH OF THE SOUTH BOUNDARY OF BURLINGTON TOWNSHIP.) | $28.65 | $14.54 | $43.19 |
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR (UNDER 130,000 LBS.), BULLDOZER; ROLLER) | $44.92 | $27.35 | $72.27 |
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR (130,000 LBS. AND OVER)) | $45.67 | $27.35 | $73.02 |
| LABORER: MASON TENDER - BRICK | $21.65 | $18.73 | $40.38 |
| PLUMBER | $57.35 | $29.37 | $86.72 |
| ROOFER | $41.50 | $25.54 | $67.04 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $41.58 | $38.21 | $79.79 |
| OPERATOR: LOADER | $25.70 | $9.58 | $35.28 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.95 | $9.05 | $34.00 |
| LABORER: COMMON OR GENERAL | $18.64 | $9.33 | $27.97 |
| CEMENT MASON/CONCRETE FINISHER | $23.64 | $6.42 | $30.06 |