| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.88 | $38.15 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.88 | $38.15 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.24 | $30.56 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.24 | $30.56 |
| BOILERMAKER (BOILERMAKER) | $46.52 | $34.63 |
| BRICKLAYER (BRICKLAYER, CEMENT MASON, PLASTERER, TILE LAYER) | $38.45 | $27.41 |
| MILLWRIGHT | $42.00 | $28.85 |
| SOFT FLOOR LAYER | $41.43 | $29.99 |
| CARPENTER (INCLUDING ACOUSTICAL WORK, DRYWALL HANGING & PILEDRIVERMAN; EXCLUDING BATT INSULATION) | $41.43 | $29.99 |
| ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA, AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK) | $31.17 | $20.08 |
| ELECTRICIAN | $42.00 | $23.93 |
| ELEVATOR MECHANIC. | $61.96 | $38.44 |
| EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $41.60 | $27.89 |
| EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $43.13 | $27.89 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $45.20 | $27.89 |
| PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $45.73 | $27.89 |
| LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $49.28 | $27.89 |
| PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR | $50.53 | $27.89 |
| IRONWORKER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $44.66 | $33.67 |
| LABORER, GENERAL. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER | $37.05 | $19.97 |
| ASBESTOS ABATEMENT/HAZARDOUS WASTE (PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS). NOTE: MASON TENDER $1.00 OVER GENERAL LABORER | $36.65 | $19.97 |
| PAINTER (BRUSH, DRYWALL TAPER) | $37.65 | $21.17 |
| GLAZIER | $42.41 | $20.06 |
| PLUMBER/PIPEFITTER, INCLUDING HVAC WORK ((2) ALL OTHER WORK) | $53.23 | $23.40 |
| PLUMBER/PIPEFITTER, INCLUDING HVAC WORK ((1) SMALL BUILDINGS (EXCEPT INDUSTRIAL AND POWER PLANTS) WHERE PLUMBING OR HEATING IS $50,000 OR LESS) | $50.02 | $23.29 |
| SPRINKLER FITTER | $51.68 | $29.73 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK AND TECHNICIANS) | $46.47 | $31.33 |
| TILE & MARBLE FINISHER | $13.89 | $8.25 |
| ROOFER | $18.01 | $3.28 |
| LABORERS: LANDSCAPE | $8.73 | $4.90 |
| LABORERS: CONCRETE WORKER | $16.34 | $3.59 |
| ASBESTOS WORKER/HEAT AND FROST INSULATOR | $25.36 | $8.37 |
| TRUCK DRIVER (3 OR MORE AXLES) | $39.72 | $28.70 |
| TRUCK DRIVER (1 & 2 AXLES) | $39.57 | $28.70 |