Sheet Metal Worker prevailing wages: Colorado, county by county
24 current sheet metal worker rates across 19 active Colorado wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Adams | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260015 Building |
| Arapahoe | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260016 Building |
| Boulder | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260017 Building |
| Broomfield | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260018 Building |
| Clear Creek | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260019 Building |
| Denver | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260020 Building |
| Douglas | SHEET METAL WORKER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260021 Building |
| Douglas | SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $25.20 | $7.55 | $32.75 | CO20260021 Building |
| Douglas | SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $24.96 | $8.60 | $33.56 | CO20260021 Building |
| El Paso | SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $24.00 | $2.18 | $26.18 | CO20260022 Building |
| El Paso | SHEET METAL WORKER INCLUDES HVAC DUCT INSTALLATION (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260022 Building |
| El Paso + 11 more | SHEET METAL WORKER | $43.05 | $22.65 | $65.70 | CO20260002 Heavy |
| El Paso + 11 more | SHEET METAL WORKER (HVAC DUCT AND INSTALLATION OF HVAC SYSTEMS) | $43.05 | $22.65 | $65.70 | CO20260004 Residential |
| El Paso + 11 more | SHEET METAL WORKER: ALL OTHER WORK | $17.30 | $4.05 | $21.35 | CO20260004 Residential |
| Elbert, Gilpin | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260030 Building |
| Jackson + 46 more | SHEET METAL WORKER ((INCLUDES HVAC DUCT AND INSTALLATION OF HVAC SYSTEMS)) | $43.05 | $22.65 | $65.70 | CO20260001 Building |
| Jefferson | SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION; EXCLUDES HVAC PIPE INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260023 Building |
| Larimer | SHEET METAL WORKER (INCLUDES HVAC DUCT INST24ALLATION; EXCLUDES HVAC PIPE INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260024 Building |
| Mesa | SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION; EXCLUDES HVAC PIPE INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260025 Building |
| Park | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260026 Building |
| Pueblo | SHEET METAL WORKER (INCLUDES HVAC DUCT AND PIPE INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260027 Building |
| Teller | SHEET METAL WORKER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260028 Building |
| Teller | SHEET METAL WORKER (HVAC UNIT INSTALLATION) | $24.00 | $2.18 | $26.18 | CO20260028 Building |
| Weld | SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 | CO20260029 Building |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Colorado trades.