Heavy construction wages: El Paso + 11 more counties, Colorado
Wage determination CO20260002 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/CO20260002 on · latest revision 1 · verify at sam.gov/wage-determination/CO20260002/1
El PasoAdamsArapahoeBoulderDenverDouglasJeffersonWeldMesaPuebloLarimerBroomfield
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS) | $36.98 | $16.82 | $53.80 |
| BRICKLAYER (ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS, JEFFERSON AND WELD COUNTIES) | $42.37 | $12.86 | $55.23 |
| BRICKLAYER (EL PASO AND PUEBLO COUNTIES) | $32.93 | $14.29 | $47.22 |
| ELECTRICIAN (PUEBLO COUNTY) | $35.40 | $16.06 | $51.46 |
| ELECTRICIAN (ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS, JEFFERSON, LARIMER, AND WELD COUNTIES) | $46.80 | $19.53 | $66.33 |
| LINE CONSTRUCTION: LINEMAN AND WELDER | $61.46 | $14.90 | $76.36 |
| LINE CONSTRUCTION: LINE EQUIPMENT OPERATOR | $44.27 | $9.41 | $53.68 |
| LINE CONSTRUCTION: GROUNDMAN | $27.39 | $5.82 | $33.21 |
| ELECTRICIAN (MESA COUNTY IN COLRADO.) | $31.75 | $13.25 | $45.00 |
| ELECTRICIAN (EL PASO COUNTY) | $40.70 | $18.47 | $59.17 |
| POWER EQUIPMENT OPERATORS: TRACKHOE | $35.20 | $15.20 | $50.40 |
| POWER EQUIPMENT OPERATORS: SCRAPER: SINGLE BOWL, INCLUDING PUPS 40 CUBIC YARDS AND OVER AND TANDEM BOWLS | $35.41 | $15.20 | $50.61 |
| POWER EQUIPMENT OPERATORS: SCRAPER: SINGLE BOWL UNDER 40 CUBIC YARDS | $35.20 | $15.20 | $50.40 |
| POWER EQUIPMENT OPERATORS: OILER | $34.14 | $15.20 | $49.34 |
| POWER EQUIPMENT OPERATORS: MECHANIC | $35.58 | $15.20 | $50.78 |
| POWER EQUIPMENT OPERATORS: FORKLIFT | $34.58 | $15.20 | $49.78 |
| POWER EQUIPMENT OPERATORS: CRANES: 141 TONS AND OVER | $38.63 | $15.20 | $53.83 |
| POWER EQUIPMENT OPERATORS: CRANES: 91 TO 140 TONS | $36.27 | $15.20 | $51.47 |
| POWER EQUIPMENT OPERATORS: CRANES: 51 TO 90 TONS | $35.07 | $15.20 | $50.27 |
| POWER EQUIPMENT OPERATORS: CRANES: 50 TONS AND UNDER | $34.77 | $15.20 | $49.97 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $34.05 | $15.20 | $49.25 |
| POWER EQUIPMENT OPERATORS: BLADE: ROUGH | $34.05 | $15.20 | $49.25 |
| POWER EQUIPMENT OPERATORS: BLADE: FINISH | $34.58 | $15.20 | $49.78 |
| IRONWORKER: STRUCTURAL | $39.21 | $22.84 | $62.05 |
| LABORERS: PIPELAYER | $18.68 | $6.78 | $25.46 |
| PLUMBER (ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS, JEFFERSON, LARIMER AND WELD COUNTIES) | $50.68 | $20.15 | $70.83 |
| PLUMBERS AND PIPEFITTERS (EL PASO COUNTY) | $45.90 | $17.17 | $63.07 |
| PLUMBERS AND PIPEFITTERS (PUEBLO COUNTY) | $45.90 | $17.17 | $63.07 |
| PLUMBERS AND PIPEFITTERS (MESA COUNTY) | $41.32 | $16.01 | $57.33 |
| PIPEFITTER (ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS, JEFFERSON, LARIMER AND WELD COUNTIES) | $44.15 | $22.43 | $66.58 |
| SHEET METAL WORKER | $43.05 | $22.65 | $65.70 |
| POWER EQUIPMENT OPERATORS: SKID LOADER | $15.37 | $4.41 | $19.78 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | $17.24 | $3.23 | $20.47 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $16.36 | $2.48 | $18.84 |
| PAINTERS: BRUSH, ROLLER & SPRAY | $15.81 | $3.26 | $19.07 |
| LABORERS: LANDSCAPE | $12.56 | $3.21 | $15.77 |
| LABORERS: FLAGGER | $8.91 | $3.80 | $12.71 |
| LABORERS: (COMMON) | $11.22 | $2.92 | $14.14 |
| IRONWORKER: REINFORCING | $18.83 | $3.90 | $22.73 |
| CEMENT MASON/CONCRETE FINISHER | $17.31 | $2.85 | $20.16 |
| CARPENTERS: FORM BUILDING AND SETTING | $16.97 | $2.74 | $19.71 |
| CARPENTERS: ALL OTHER WORK | $15.14 | $3.37 | $18.51 |
| BOILERMAKER | $17.60 | $0.00 | $17.60 |
| TRUCK DRIVERS: TANDEM/SEMI AND WATER | $27.59 | $4.87 | $32.46 |
| TRUCK DRIVERS: PICKUP | $26.96 | $4.87 | $31.83 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.